HomeMy WebLinkAboutResolution No. 064-25 - Resolution - Establishing Sidewalk Improvement District SW-5 and Rates to be Collected - 2026 to 2030
RESOLUTION
Awarding Contract for 2025 Sidewalk and Pedestrian Ramp Improvements NW
District 1-2 - Project No. J4730, establishing Sidewalk Improvement District NW-1,
and establishing rates to be collected from 2026 to 2030.
WHEREAS, The City Council adopted the Sidewalk Improvement District Program for the
annual repair and replacement of City sidewalks on November 14, 2022; and
WHEREAS, pursuant to an advertisement for bids for the following improvement(s): 2025
Sidewalk and Pedestrian Ramp Improvements NW District 1-2 - Project No. J4730,
the following bids were received complying with the advertisement:
Ti-Zack Concrete, LLC $2,766,483.90; and
WHEREAS, it appears that Ti-Zack Concrete, Inc. is the lowest responsive and
responsible bidder; and
WHEREAS, implementation of the program requires establishment of the Districts
contributing to annual repair and replacement of City sidewalks; and
WHEREAS, implementation of the program also requires establishment of the Project
Areas within Districts where annual repair and replacement of City sidewalks will be
focused; and
WHEREAS, implementation of the program also requires establishment of the rates
assessed to parcels within each District.
NOW, THEREFORE, BE IT RESOLVED, by the Common Council of the City of Rochester
that the bid of $2,766,483.90 is hereby accepted and execution of the standard City contract
for construction with Ti-Zack Concrete, LLC., is authorized for the following approved local
improvements: 2025 Sidewalk and Pedestrian Ramp Improvements NW District 1-2 -
Project No. J4730; and
BE IT FURTHER RESOLVED that the City Clerk is directed to return to all bidders the
deposits made with their bids, except the deposits of the successful bidder and the next
lowest bidder, which shall be retained until the contract has been executed; and
BE IT FURTHER RESOLVED that the bidder shall execute all contracts within ten days
after the contract is ready for their signature, and if not executed by them in said time, they
shall be deemed to have abandoned the same; and
BE IT FURTHER RESOLVED that Sidewalk Improvement District NW-1, shown in the
attached figure and generally described as:
Parcels within City limits starting at Hwy 52 NW and Hwy 14 NW interchange,
going north on Hwy 52 to 65 ST NW, then following the City Limits boundary
west then south to Country Club Rd W, following Country Club Rd W east to W
Circle Dr NW, then northeast back to Hwy 52 NW and Hwy 14 NW interchange.
is established for sidewalk replacements and repairs to be completed in 2025 and
assessed to participating parcels in the District from 2026 to 2030.
BE IT FURTHER RESOLVED that Project Area NW 1-2, shown in the attached figure and
generally described as:
Parcels within City limits starting at W Circle Dr SW & Country Club Rd W following
W Circle Dr SW/NW to Hwy 14 NW, then west along Hwy 14 NW to the City Limits
boundary, following City Limits south to Country Club Rd W, then east on Country
Club Rd W back to W Circle Dr SW & Country Club Rd W.
is established as the project area for sidewalk replacements and repairs for the 2025
construction season.
BE IT FURTHER RESOLVED that participating parcels in District NW-1 will be assessed at
the following annual rates from 2026 to 2030:
Residential (without sidewalk) $28.14
Local Public (without sidewalk) $28.14
Residential $54.28
Local Public $54.28
Non-Residential (without sidewalk) $158.84
Non-Residential $315.68
Non-Participating $0.00
PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF
ROCHESTER, MINNESOTA, THIS __________ DAY OF _______________, 2025.
___________________________________
PRESIDENT OF SAID COMMON COUNCIL
ATTEST: __________________________
CITY CLERK
APPROVED THIS _____ DAY OF ______________________, 2025.
___________________________________
MAYOR OF SAID CITY
(Seal of the City of
Rochester, Minnesota)