Loading...
HomeMy WebLinkAboutResolution No. 025-19 - CivicOnFirst.CUPR2017-029 RESOLUTION WHEREAS, EKN Development Group requested approval for Conditional Use Permit #R2017-029CUP, which is for an eight-story transient accommodations and retail building. The site is 0.67 acres in size and is located on the southwest corner of the intersection of Civic Center Drive st NW and 1 Avenue NW. WHEREAS, the project is being proposed through the Incentive Development Conditional Use Permit process because the proposed development exceeds the maximum Floor Area Ratio (FAR) permitted in the base zoning district; and, WHEREAS, The proposal is consistent with Comprehensive Plan 2040. WHEREAS, On January 9, 2019, the Planning and Zoning Commission recommended approval with conditions of the incentive development final plan with staff findings and modifications to signage and building setbacks using R.C.O. § 62.712. WHEREAS, On January 25, 2019, revised plans addressing several conditions of approval recommended by the Planning and Zoning Commission were submitted by the applicant. WHEREAS, The Council adopts staff findings as described in the staff report dated January 9, 2019, and finds the proposal meets the regulations in R.C.O. § 62.630 (subd. 3) Conditional Use Permit Incentive Development Final Plan. WHEREAS, The Council finds the proposal meets four incentives in R.C.O. § 62.658 All Development. WHEREAS, on February 4, 2019, the City of Rochester Common Council held a public hearing to consider this application, and adopted the findings of fact and recommended approval subject to conditions one through eight and modifications to signage and building setbacks proposed by the Planning Department and recommended by the Planning and Zoning Commission. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Rochester that, based upon the above-stated findings of fact, the Applicant has shown by a preponderance of the evidence submitted at the public hearing that it has satisfied the above criteria subject to the imposition of the below-stated eight conditions of approval. BE IT FURTHER RESOLVED that the City approve Conditional Use Permit #R2017- 029CUP requested by EKN Development Group, subject to the conditions of approval shown below. 1 CONDITIONS 1. Revised final incentive development plans shall be submitted to include the following information: a. An 8-inch water service gate valve 3 feet west of the 8x6 reducer. b. A parking management plan to document that the proposed tandem parking spaces will function as usable spaces. 2. A termination date for the digital advertising sign is required prior to Council approval of the conditional use permit. The sign must be removed from the site on or before this date. Upon removal of the digital advertising sign, a sign credit will not be issued. 3. Prior to building permit approval, Grading & Drainage Plan approval is required for this project. 4. Prior to building permit approval, Boulevard Tree requirements shall be met through the inclusion of additional trees on the landscaping plan or payment in lieu of boulevard trees to the Park and Recreation Department. 5. Any encroachments into public easements or public ROW, other than turf / boulevard trees, will require prior City Council approval of a legal document deemed appropriate by the Public Works Director and City Attorney. The requirement for an appropriate legal document includes any private facilities which will extend into the public right-of-way or public easements, above, at, or below grade. 6. Execution of a City-Owner Contract will be required for any new public improvements required for this proposed redevelopment, as well as, for any reconstruction of existing public infrastructure. 7. Charges/fees applicable to the development of this property include the following and unless otherwise stated shall be paid prior to issuance of utility connection permit(s), or at the City’s discretion, within 30 days after invoicing. 8. Addition of bumps out should be between Civic Center Drive and the three parking stalls between the parking and the driveway to the hotel ramp; and between the driveway and the railway. 9. Prior to building permit approval, an executed site access agreement shall be submitted to the Rochester Public Works Department. 2 PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF ROCHESTER, MINNESOTA, THIS __________ DAY OF _______________, 2019. ___________________________________ PRESIDENT OF SAID COMMON COUNCIL ATTEST: __________________________ CITY CLERK APPROVED THIS _____ DAY OF ______________________, 2019. __________________________________ MAYOR OF SAID CITY (Seal of the City of Rochester, Minnesota) Zone15\\Conduse.2017-29 CivicOnFirst 3