Loading...
HomeMy WebLinkAboutResolution No. 276-21 - Resolution - 2022 Rochester Public Utility Electric and Water Utility Rate Adjustments RESOLUTION Adopting the 2022 RPU Electric and Water Utility Rate Adjustments. BE IT RESOLVED by the Common Council of the City of Rochester that the Common Council concurs in the Resolution of the Rochester Public Utility Board appended hereto, requesting approval of the 2022 Electric and Water Utility Rate Adjustments. PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF ROCHESTER, MINNESOTA, THIS __________ DAY OF _______________, 2021. ___________________________________ PRESIDENT OF SAID COMMON COUNCIL ATTEST: __________________________ CITY CLERK APPROVED THIS _____ DAY OF ______________________, 2021. ___________________________________ MAYOR OF SAID CITY (Seal of the City of Rochester, Minnesota) Appendix 2022 RATE SCHEDULE ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Table of Contents RESIDENTIAL SERVICE .................................................................................................................7 AVAILABILITY ..................................................................................................................................................................................... 7 APPLICATION ...................................................................................................................................................................................... 7 CHARACTER OF SERVICE .............................................................................................................................................................. 7 RATE:.................................................................................................................................................................................................. ...... 7 POWER COST ADJUSTMENT ........................................................................................................................................................ 7 CONDITIONS OF DELIVERY.......................................................................................................................................................... 7 RESIDENTIAL SERVICE - DUAL FUEL ............................................................................................8 AVAILABILITY ..................................................................................................................................................................................... 8 APPLICATION ...................................................................................................................................................................................... 8 CHARACTER OF SERVICE .............................................................................................................................................................. 8 RATE:.................................................................................................................................................................................................. ...... 8 POWER COST ADJUSTMENT ........................................................................................................................................................ 8 MINIMUM BILL ................................................................................................................................................................................... 8 PAYMENT ............................................................................................................................................................................................... 8 CONDITIONS OF DELIVERY.......................................................................................................................................................... 8 RESIDENTIAL SERVICE – HIGH EFFICIENCY HVAC .................................................................... 109 AVAILABILITY ............................................................................................................................................................................... 109 APPLICATION ................................................................................................................................................................................ 109 CHARACTER OF SERVICE ........................................................................................................................................................ 109 RATE:.................................................................................................................................................................................................. 109 POWER COST ADJUSTMENT .................................................................................................................................................. 109 PAYMENT ...................................................................................................................................................................................... 1110 CONDITIONS OF DELIVERY................................................................................................................................................. 1110 RESIDENTIAL – TIME-OF-USE SERVICE PILOT PROGRAM ...................................................... 1211 AVAILABILITY ............................................................................................................................................................................ 1211 APPLICATION ............................................................................................................................................................................. 1211 CHARACTER OF SERVICE ..................................................................................................................................................... 1211 RATE:............................................................................................................................................................................................... 1211 POWER COST ADJUSTMENT ............................................................................................................................................... 1312 DISTRIBUTED ENERGY RESOURCES .............................................................................................................................. 1312 CONDITIONS OF DELIVERY................................................................................................................................................. 1312 GENERAL SERVICE ................................................................................................................. 1513 AVAILABILITY ............................................................................................................................................................................ 1513 APPLICATION ............................................................................................................................................................................. 1513 CHARACTER OF SERVICE ..................................................................................................................................................... 1513 RATE:............................................................................................................................................................................................... 1513 POWER COST ADJUSTMENT ............................................................................................................................................... 1513 PAYMENT ...................................................................................................................................................................................... 1513 CONDITIONS OF DELIVERY................................................................................................................................................. 1614 GENERAL SERVICE - HIGH EFFICIENCY HVAC ......................................................................... 1715 AVAILABILITY ............................................................................................................................................................................ 1715 APPLICATION ............................................................................................................................................................................. 1715 CHARACTER OF SERVICE ..................................................................................................................................................... 1715 RATE:............................................................................................................................................................................................... 1715 POWER COST ADJUSTMENT ............................................................................................................................................... 1715 PAYMENT ...................................................................................................................................................................................... 1815 2 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE CONDITIONS OF DELIVERY................................................................................................................................................. 1816 GENERAL SERVICE - TIME-OF-USE ......................................................................................... 2017 AVAILABILITY ............................................................................................................................................................................ 2017 APPLICATION ............................................................................................................................................................................. 2017 CHARACTER OF SERVICE ..................................................................................................................................................... 2017 RATE:............................................................................................................................................................................................... 2017 POWER COST ADJUSTMENT ............................................................................................................................................... 2017 MINIMUM BILL .......................................................................................................................................................................... 2017 PAYMENT ...................................................................................................................................................................................... 2118 CONDITIONS OF DELIVERY................................................................................................................................................. 2118 MEDIUM GENERAL SERVICE ................................................................................................. 2319 AVAILABILITY ............................................................................................................................................................................ 2319 APPLICATION ............................................................................................................................................................................. 2319 CHARACTER OF SERVICE ..................................................................................................................................................... 2319 RATE:............................................................................................................................................................................................... 2319 POWER COST ADJUSTMENT ............................................................................................................................................... 2319 POWER FACTOR ADJUSTMENT ........................................................................................................................................ 2319 PRIMARY METER DISCOUNT ............................................................................................................................................. 2319 TRANSFORMER OWNERSHIP CREDIT .......................................................................................................................... 2420 DETERMINATION OF DEMAND: ....................................................................................................................................... 2420 MINIMUM BILL .......................................................................................................................................................................... 2420 PAYMENT ...................................................................................................................................................................................... 2420 CONDITIONS OF DELIVERY................................................................................................................................................. 2420 MEDIUM GENERAL SERVICE - HIGH EFFICIENCY HVAC ......................................................... 2521 AVAILABILITY ............................................................................................................................................................................ 2521 APPLICATION ............................................................................................................................................................................. 2521 CHARACTER OF SERVICE ..................................................................................................................................................... 2521 RATE:............................................................................................................................................................................................... 2521 POWER COST ADJUSTMENT ............................................................................................................................................... 2621 POWER FACTOR ADJUSTMENT ........................................................................................................................................ 2622 PRIMARY METER DISCOUNT ............................................................................................................................................. 2622 TRANSFORMER OWNERSHIP CREDIT .......................................................................................................................... 2622 DETERMINATION OF DEMAND: ....................................................................................................................................... 2622 MINIMUM BILL .......................................................................................................................................................................... 2622 PAYMENT ...................................................................................................................................................................................... 2622 CONDITIONS OF DELIVERY................................................................................................................................................. 2723 MEDIUM GENERAL SERVICE - TIME-OF-USE ......................................................................... 2824 AVAILABILITY ............................................................................................................................................................................ 2824 APPLICATION ............................................................................................................................................................................. 2824 CHARACTER OF SERVICE ..................................................................................................................................................... 2824 RATE:............................................................................................................................................................................................... 2824 POWER COST ADJUSTMENT ............................................................................................................................................... 2824 POWER FACTOR ADJUSTMENT ........................................................................................................................................ 2925 PRIMARY METER DISCOUNT ............................................................................................................................................. 2925 TRANSFORMER OWNERSHIP CREDIT .......................................................................................................................... 2925 DETERMINATION OF DEMAND: ....................................................................................................................................... 2925 BILLING DEMAND: ................................................................................................................................................................... 2925 MINIMUM BILL .......................................................................................................................................................................... 2925 PAYMENT ...................................................................................................................................................................................... 2925 3 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE CONDITIONS OF DELIVERY................................................................................................................................................. 3026 LARGE GENERAL SERVICE ..................................................................................................... 3127 AVAILABILITY ............................................................................................................................................................................ 3127 APPLICATION ............................................................................................................................................................................. 3127 CHARACTER OF SERVICE ..................................................................................................................................................... 3127 RATE:............................................................................................................................................................................................... 3127 POWER COST ADJUSTMENT ............................................................................................................................................... 3127 POWER FACTOR ADJUSTMENT ........................................................................................................................................ 3127 PRIMARY METER DISCOUNT ............................................................................................................................................. 3127 TRANSFORMER OWNERSHIP CREDIT .......................................................................................................................... 3127 DETERMINATION OF DEMAND: ....................................................................................................................................... 3228 MINIMUM BILL .......................................................................................................................................................................... 3228 PAYMENT ...................................................................................................................................................................................... 3228 CONDITIONS OF DELIVERY................................................................................................................................................. 3228 LARGE INDUSTRIAL SERVICE ................................................................................................. 3329 AVAILABILITY ............................................................................................................................................................................ 3329 APPLICATION ............................................................................................................................................................................. 3329 CHARACTER OF SERVICE ..................................................................................................................................................... 3329 RATE:............................................................................................................................................................................................... 3329 POWER COST ADJUSTMENT ............................................................................................................................................... 3329 POWER FACTOR ADJUSTMENT ........................................................................................................................................ 3329 DETERMINATION OF DEMAND: ....................................................................................................................................... 3329 MINIMUM BILL .......................................................................................................................................................................... 3329 PAYMENT ...................................................................................................................................................................................... 3329 CONDITIONS OF DELIVERY................................................................................................................................................. 3430 INTERRUPTIBLE SERVICE ....................................................................................................... 3531 AVAILABILITY ............................................................................................................................................................................ 3531 APPLICATION ............................................................................................................................................................................. 3531 CHARACTER OF SERVICE ..................................................................................................................................................... 3531 RATE:............................................................................................................................................................................................... 3531 POWER COST ADJUSTMENT ............................................................................................................................................... 3531 POWER FACTOR ADJUSTMENT ........................................................................................................................................ 3632 PRIMARY METER DISCOUNT ............................................................................................................................................. 3632 TRANSFORMER OWNERSHIP CREDIT .......................................................................................................................... 3632 SURCHARGE: ............................................................................................................................................................................... 3632 PENALTY ....................................................................................................................................................................................... 3632 DETERMINATION OF DEMAND: ....................................................................................................................................... 3632 BILLING DEMAND: ................................................................................................................................................................... 3733 MINIMUM BILL .......................................................................................................................................................................... 3733 PAYMENT ...................................................................................................................................................................................... 3733 CONDITIONS OF DELIVERY................................................................................................................................................. 3834 POWER COST ADJUSTMENT ................................................................................................. 3935 APPLICATION ............................................................................................................................................................................. 3935 LOAD MANAGEMENT CREDITS ............................................................................................. 4036 AVAILABILITY ............................................................................................................................................................................ 4036 TERMS AND CONDITIONS .................................................................................................................................................... 4036 CITY STREET LIGHTING .......................................................................................................... 4137 AVAILABILITY ............................................................................................................................................................................ 4137 4 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE:............................................................................................................................................................................................... 4137 POWER COST ADJUSTMENT ............................................................................................................................................... 4137 CONDITIONS OF DELIVERY ................................................................................................................................................. 4137 TRAFFIC SIGNALS .................................................................................................................. 4238 AVAILABILITY ............................................................................................................................................................................ 4238 RATE:............................................................................................................................................................................................... 4238 MINIMUM BILL .......................................................................................................................................................................... 4238 POWER COST ADJUSTMENT ............................................................................................................................................... 4238 CONDITIONS OF DELIVERY ................................................................................................................................................. 4238 CIVIL DEFENSE SIRENS .......................................................................................................... 4339 AVAILABILITY ............................................................................................................................................................................ 4339 APPLICATION ............................................................................................................................................................................. 4339 CHARACTER OF SERVICE ..................................................................................................................................................... 4339 RATE:............................................................................................................................................................................................... 4339 MINIMUM BILL .......................................................................................................................................................................... 4339 PAYMENT ...................................................................................................................................................................................... 4339 CONDITIONS OF DELIVERY ................................................................................................................................................. 4339 SECURITY LIGHTING .............................................................................................................. 4440 AVAILABILITY ............................................................................................................................................................................ 4440 APPLICATION ............................................................................................................................................................................. 4440 RATE:............................................................................................................................................................................................... 4440 PAYMENT ...................................................................................................................................................................................... 4440 CONDITIONS OF DELIVERY ................................................................................................................................................. 4440 UNMETERED DEVICE RATE ................................................................................................... 4541 AVAILABILITY ............................................................................................................................................................................ 4541 APPLICATION ............................................................................................................................................................................. 4541 CHARACTER OF SERVICE ..................................................................................................................................................... 4541 RATE:............................................................................................................................................................................................... 4541 MINIMUM BILL .......................................................................................................................................................................... 4541 PAYMENT ...................................................................................................................................................................................... 4541 CONDITIONS OF DELIVERY ................................................................................................................................................. 4541 CLEAN AIR RIDER .................................................................................................................. 4642 APPLICATION ............................................................................................................................................................................. 4642 CONDITIONS OF DELIVERY ................................................................................................................................................. 4642 SCHEDULE I ROCHESTER PUBLIC UTILITIES COGENERATION AND SMALL POWER PRODUCTION TARIFF ............................................................................................................ 4743 AVAILABILITY ............................................................................................................................................................................ 4743 APPLICATION ............................................................................................................................................................................. 4743 CHARACTER OF SERVICE ..................................................................................................................................................... 4743 RATE:............................................................................................................................................................................................... 4743 POWER COST ADJUSTMENT ............................................................................................................................................... 4743 PAYMENT ...................................................................................................................................................................................... 4844 CONDITIONS OF DELIVERY ................................................................................................................................................. 4844 RPU PUBLIC ELECTRIC VEHICLE CHARGING RATE .................................................................. 4945 AVAILABILITY ............................................................................................................................................................................ 4945 RATE:............................................................................................................................................................................................... 4945 CONDITIONS OF DELIVERY ................................................................................................................................................. 4945 5 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE LINE EXTENSIONS ................................................................................................................. 5046 AVAILABILITY ............................................................................................................................................................................ 5046 APPLICATION ............................................................................................................................................................................. 5046 RATE:............................................................................................................................................................................................... 5046 PAYMENT ...................................................................................................................................................................................... 5046 ECONOMIC DEVELOPMENT CREDIT ...................................................................................... 5147 AVAILABILITY ............................................................................................................................................................................ 5147 APPLICABILITY .......................................................................................................................................................................... 5147 QUALIFICATIONS ...................................................................................................................................................................... 5147 QUALIFYING LOAD: ................................................................................................................................................................. 5147 APPLICATION AND APPROVAL ......................................................................................................................................... 5248 CREDITS ......................................................................................................................................................................................... 5248 MONTHLY FIXED CHARGE: ................................................................................................................................................. 5248 TERM: .............................................................................................................................................................................................. 5349 METERING: .................................................................................................................................................................................. 5349 Appendix A - Qualifying Economic Development Programs: ................................................ 5450 STATE OF MINNESOTA PROGRAMS ............................................................................................................................... 5450 BUSINESS DEVELOPMENT ................................................................................................................................................ 5450 BUSINESS FINANCING ......................................................................................................................................................... 5450 TAX CREDITS + BENEFITS ................................................................................................................................................. 5450 COMMUNITY FINANCING ................................................................................................................................................... 5450 TRAINING ................................................................................................................................................................................... 5450 LOCAL OR COUNTY PROGRAMS ....................................................................................................................................... 5551 FEDERAL PROGRAMS ........................................................................................................................................................... 5551 Appendix B – Customer Affidavit for Economic Development Credit: .................................. 5652 Appendix C – Application for Economic Development Credit............................................... 5753 MISCELLANEOUS FEES – ELECTRIC UTILITY ........................................................................... 5955 WATER SERVICE .................................................................................................................... 6157 AVAILABILITY ............................................................................................................................................................................ 6157 MONTHLY RATE: ...................................................................................................................................................................... 6157 MINIMUM BILL .......................................................................................................................................................................... 6157 PAYMENT ...................................................................................................................................................................................... 6157 CONDITIONS OF DELIVERY................................................................................................................................................. 6157 SERVICE ASSURED ................................................................................................................. 6358 Availability ................................................................................................................................................................................... 6358 Monthly Rate ............................................................................................................................................................................... 6358 FIRE HYDRANT FACILITIES CHARGE ........................................................................................... 59 APPLICABILITY ................................................................................................................................................................................ 59 MONTHLY RATE: ............................................................................................................................................................................ 59 BILLINGS: ............................................................................................................................................................................................ 59 PAYMENT ............................................................................................................................................................................................ 59 CONDITIONS OF DELIVERY................................................................................................................................................. 6359 MISCELLANEOUS FEES – WATER UTILITY .................................................................................. 60 6 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE RES SHEET 1 OF 1 RESIDENTIAL SERVICE AVAILABILITY: At all locations where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. Where service desired by the customer is not adjacent to the premises to be served, additional contract arrangements may be required prior to service being furnished. APPLICATION: To electric service required for residential purposes in individual private dwellings and in individually metered apartments when such service is supplied at one point of delivery and measured through one meter. Existing single metered, multi-unit dwellings having not in excess of three separate dwelling units in the same structure may be served under this rate. CHARACTER OF SERVICE: Single phase, 60 Hertz, 120/240 volts alternating current. RATE: Customer Charge: $ 18.30 $19.40 Energy Charge: Non-Summer Energy / kWh 10.726¢ 10.890¢ Summer Energy / kWh 12.812¢ 13.008¢ Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December. POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). MINIMUM BILL: per month: $18.30 $ 19.40 PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 2. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 3. Energy furnished under this rate shall not be resold. 4. This tariff assumes use of metering technology capable of being read using automated equipment. Customers choosing the option to have a meter that is not capable of being read using automated equipment, thus requiring a manual reading, are subject to a monthly surcharge. Additional one-time meter change-out fees also apply. (See the RPU Miscellaneous Fee Schedule for the amount of the monthly surcharge and the one-time meter change-out fees). November 12, 2019 October 26, 2021 Approved by Rochester Public Utility Board: January 1, 2020 2022 Effective Date: 7 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE RES-DF SHEET 1 OF 1 RESIDENTIAL SERVICE - DUAL FUEL - Closed AVAILABILITY: Available only to existing dual fuel customers transferred from People's Cooperative Power Association's (PCPA)People’s Energy Cooperative electrical system to RPU's system as part of RPU's electric service territory acquisitions and are currently on the Residential Service Dual Fuel rate as of January 1, 2022. APPLICATION: To electric heating service required for residential purposes in individual private buildings. Such electric heating load shall be metered separately from the rest of the service. CHARACTER OF SERVICE: Single phase, 60 Hertz, 120/240 volts alternating current. RATE: Energy Charge / kWh 8.005¢ 8.128¢ POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). MINIMUM BILL: Energy usage. PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. Service under this rate is only for electric heating. All other electrical loads shall be metered under the RES residential service rate. 2. Customer must keep his or her alternate fuel source heating system in satisfactory operating condition. 3. RPU reserves the right to transfer RES-DF customers from the primary electric heat source to the alternate fuel source at any such time that the electric heating load would add to RPU's monthly electric peak. 4. Customers that remove existing dual fuel heating systems shall not be eligible for the RES-DF rate with replacement heating systems. 5. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 6. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 7. Energy furnished under this rate shall not be resold. 8. This tariff assumes use of metering technology capable of being read using automated equipment. Customers choosing the option to have a meter that is not capable of being read using automated equipment, thus requiring a manual reading, are subject to a monthly surcharge. Additional one-time meter change-out fees also apply. (See the RPU Miscellaneous Fee Schedule for the amount of the monthly surcharge and the one-time meter change-out fees). November 12, 2019 October 26, 2021 Approved by Rochester Public Utility Board: January 1, 2020 2022 Effective Date: 8 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE RESELGEO SHEET 1 OF 2 RESIDENTIAL SERVICE – HIGH EFFICIENCY HVAC - Closed AVAILABILITY: To RPU residential customers that: 1. Are Currentlycurrently on the Residential Service-High Efficiency HVAC rate as of January 1, 2022. 2. Use either an air source or ground source heat pump system as the only source of heating and cooling in their home. 3. Use an electric water heater (usually connected to a desuperheater on the heat pump) as their only source of domestic water heating. 4. Receive prior approval of the equipment from RPU. Note that equipment must be rated by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI)*, and at the time of installation, meet the minimum efficiency requirements found on the Residential Electric Efficiency Rebate Application in effect at the time. The current application is available at www.rpu.org. *For air source and ground source heat pumps the efficiency ratings are determined using the Air- Conditioning, Heating, and Refrigeration Institute’s (AHRI) directory, which may be found at www.ahridirectory.org. APPLICATION: Electric service required for residential purposes in individual private dwellings where service is supplied at one point of delivery and measured through one meter. CHARACTER OF SERVICE: Single phase, 60 hertz, 120/240 volts alternating current. RATE: Customer Charge $ 18.30 $19.40 Energy Charge: Winter first 600 kWh 10.726¢ 10.890¢ Winter over 600 kWh 8.988¢ 9.126¢ Summer kwh 12.812¢ 13.008¢ Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December. POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). MINIMUM BILL: per month: $18.30 $ 19.40 10 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE RESELGEO SHEET 2 OF 2 PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. Service under this rate is only for air-source or ground-source heat pump systems that meet the stated efficiency requirements as explained in the Availability subhead of this rate schedule. 2. Service provided under this rate is subject to applicable provisions of RPU’s published Electric Service Rules and Regulations. 3. Energy provided under this rate shall not be resold. 4. RPU shall not be liable for any damage or loss sustained by the customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 5. This tariff assumes use of metering technology capable of being read using automated equipment. Customers choosing the option to have a meter that is not capable of being read using automated equipment, thus requiring a manual reading, are subject to a monthly surcharge. Additional one-time meter change-out fees also apply. (See the RPU Miscellaneous Fee Schedule for the amount of the monthly surcharge and the one-time meter change-out fees). Approved by Rochester Public Utility Board: November 12, 2019 October 26, 2021 Effective Date: January 1, 2020 2022 11 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE RESTOU SHEET 1 OF 2 RESIDENTIAL – TIME-OF-USE SERVICE PILOT PROGRAM AVAILABILITY: At all locations where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. Where service desired by the customer is not adjacent to the premises to be served, additional contract arrangements may be required prior to service being furnished. RPU reserves the right to limit both the number of customers and the amount of load taken under this rate schedule. APPLICATION: To electric service required for residential purposes in individual private dwellings and in individually metered apartments when such service is supplied at one point of delivery and measured through one meter. CHARACTER OF SERVICE: Single phase, 60 Hertz, 120/240 volts alternating current. RATE: Customer Charge: $18.30 $19.40 Energy Charge: Non-Summer Energy: 13.91¢ 14.123¢ Super-peak Energy / Kwh On-peak Energy / Kwh 13.91¢ 14.123¢ Off-peak Energy /Kwh 7.05¢ 7.158¢ Summer Energy: Super-peak Energy / Kwh 28.80¢ 29.241¢ On-peak Energy / Kwh 17.13¢ 17.392¢ Off-peak Energy /Kwh 7.05¢ 7.158¢ Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December. Definition of Super-Peak Energy: All energy used by the customer between the hours of 4:00 p.m. and 8:00 p.m. (4 Hours) Monday through Friday. Definition of On-Peak Energy: All energy used by the customer between the hours of 8:00 a.m. and 4:00 p.m. (8 hours) and between the hours of 8:00 p.m. and 10:00 p.m. (2 hours) Monday through Friday. Definition of Off-Peak Energy: All energy used by the customer for all others hours, including weekends and holidays. 12 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE RESTOU SHEET 2 OF 2 POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). MINIMUM BILL: per month: $18.30 $19.40 PAYMENT: Payments are due on or before the due date. DISTRIBUTED ENERGY RESOURCES: Customers who have installed Distributed Energy Resources and have elected to to receive the average retail utility rate are eligible to participate in the Residential Time of Use Pilot Program. All energy supplied by the customer’s qualifying facility will be purchased by RPU at the Residential Averge Average Retail Rate as listed in Schedule 1 of the Rules Governing the Interconnection of Cogeneration and Small Power Production Facilities with Rochester Public Utilities. Schedule 1 is updated annually and can be found on RPU’s website. CONDITIONS OF DELIVERY: 1. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 2. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 3. Energy furnished under this rate shall not be resold. 4. Service under this rate will be made available at the option of the residential service customer, subject to the availability of the necessary time-of-use metering equipment. 5. A customer may switch to the RESIDENTIAL SERVICE rate providing the customer gives RPU at least 45 days notice. 6. A customer may only switch from RESIDENTIAL SERVICE to RESIDENTIAL TIME OF USE SERVICE PILOT PROGRAM one time. 7. This tariff assumes use of metering technology capable of being read using automated equipment. Customers choosing the option to have a meter that is not capable of being read using automated equipment, thus requiring a manual reading, are subject to a monthly surcharge. Additional one-time meter change-out fees also apply. (See the RPU Miscellaneous Fee Schedule for the amount of the monthly surcharge and the one-time meter change-out fees). 13 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Approved by Rochester Public Utility Board: October 27, 2020 October 26, 2021 Effective Date: January 1, 2021 2022 14 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE GS SHEET 1 OF 2 GENERAL SERVICE AVAILABILITY: At all locations for loads of less than 75 KW where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. For loads where the service desired by the customer is not adjacent to the premises to be served, additional contract arrangements may be required prior to service being furnished. Effective January 1, 2023 availability will be to Customers with loads of less than 25 KW, with loads between 25 KW and 35 KW having the option of selecting to be classified, for billing purposes, as General Service or Medium General Service until January 1, 2024. APPLICATION: To commercial, industrial, governmental, and other types of general service customers with all service taken at one point and measured through one meter. Also applicable to temporary service in accordance with RPU's published Electric Service Rules and Regulations. Not applicable to standby service. CHARACTER OF SERVICE: Single or three phase, 60 Hertz, alternating current at any one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. RATE: Customer Charge $ 41.00 $ 38.00 Energy Charge: Non-Summer kWh 10.343¢ 10.507¢ Summer kWh 13.312¢ 13.523¢ Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December. POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). MINIMUM BILL: per month: $ 41.00 $ 38.00 PAYMENT: Payments are due on or before the due date. 15 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE GS SHEET 2 OF 2 CONDITIONS OF DELIVERY: 1. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 2. Unless authorized by separate written agreement, standby electric generating equipment installed by the customer shall not be interconnected, or operated in parallel, with the RPU system. Customer shall own, install, operate, and maintain electrical interlocking equipment, which will prevent parallel operation, and such equipment shall be approved by RPU prior to installation. 3. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 4. Energy furnished under this rate shall not be resold. 5. This tariff assumes use of metering technology capable of being read using automated equipment. Customers choosing the option to have a meter that is not capable of being read using automated equipment, thus requiring a manual reading, are subject to a monthly surcharge. Additional one-time meter change-out fees also apply. (See the RPU Miscellaneous Fee Schedule for the amount of the monthly surcharge and the one-time meter change-out fees). Approved by Rochester Public Utility Board: November 20, 2018 October 26, 2021 Effective Date: January 1, 2019 2022 16 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE GS-HEF SHEET 1 OF 2 GENERAL SERVICE - HIGH EFFICIENCY HVAC - Closed AVAILABILITY: At all locations for loads of less than 75 KW where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served and to customers who: 1. Are currently on the General Service-High Efficiency HVAC rate as of January 1, 2022. 2. Use either an air source or ground source heat pump system as the only source of heating and cooling in their facility. 3. Use an electric water heater (usually connected to a desuperheater on the heat pump) as the only source of water heating. 4. Receive prior approval of the equipment from RPU. Note that equipment must be rated by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI)* and at the time of installation, meet the minimum efficiency requirements found on the Commercial Heat Pumps Rebate Application in effect at the time. The current application is available at www.rpu.org. 5. Service under this rate must be separately metered from other facility loads. Effective January 1, 2023 availability will be to facilities with loads of less than 25 KW. Customers with loads between 25 KW and 35 KW will have the option of selecting to be classified, for billing purposes, as General Service-High Efficiency HVAC or Medium General Service-High Efficiency HVAC until January 1, 2024. *For air source and ground source heat pumps the efficiency ratings are determined using the Air- Conditioning, Heating and Refrigeration Institute’s (AHRI) directory, which may be found at www.ahridirectory.org Note: Other all-electric HVAC systems may be considered for this rate if they meet the stated efficiency standards. To have a system considered, customers must submit an engineering analysis documenting the efficiency of the system. APPLICATION: To commercial, industrial, governmental, and other types of General Service customers reconfiguring their current currently receiving their service through this rate as of January 1, 2022. electric service, or adding a new service, to separately meter their high efficiency HVAC equipment. Not applicable to standby service. . CHARACTER OF SERVICE: Single or three phase, 60 Hertz, alternating current at any one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. RATE: Customer Charge $ 41.00 $ 38.00 Energy Charge: Non-Summer / kWh 8.628¢ 8.766¢ Summer / kWh 13.312¢ 13.525¢ Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December. POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). MINIMUM BILL: per month $ 41.00 $ 38.00 17 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE GS-HEF SHEET 2 OF 2 PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. Service under this rate is only for air source or ground source heat pumps and any other all- electric systems that meet the stated efficiency requirements as explained in the Availability subhead of this rate schedule. 2. Service under this rate must be separately metered from other facility loads. 3. Since the HVAC system must be separately metered for this rate, the customer is responsible for any rewiring and its associated costs. 4. Service provided under this rate is subject to applicable provisions of RPU’s published Electric Service Rules and Regulations. 5. Energy provided under this rate shall not be resold. 6. RPU shall not be liable for any damage or loss sustained by the customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 7. Unless authorized by a separate written agreement, standby electric generating equipment installed by the customer shall not be interconnected, or operated in parallel, with the RPU system. Customer shall own, install, operate, and maintain electrical interlocking equipment, which will prevent parallel operation, and such equipment shall be approved by RPU prior to installation. 8. This tariff assumes use of metering technology capable of being read using automated equipment. Customers choosing the option to have a meter that is not capable of being read using automated equipment, thus requiring a manual reading, are subject to a monthly surcharge. Additional one-time meter change-out fees also apply. (See the RPU Miscellaneous Fee Schedule for the amount of the monthly surcharge and the one-time meter change-out fees). Approved by Rochester Public Utility Board: November 20, 2018 October 26, 2021 Effective Date: January 1, 2019 2022 18 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE GS-TOU SHEET 1 OF 2 GENERAL SERVICE - TIME-OF-USE AVAILABILITY: At all locations for loads of less than 75 kW where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. For loads where the service desired by the customer is not adjacent to the premises to be served, additional contract arrangements may be required prior to service being furnished. RPU reserves the right to limit both the number of customers and the amount of load taken under this rate schedule. Effective January 1, 2023 availability will be to facilities with loads of less than 25 KW. Customers with loads between 25 KW and 35 KW will have the option of selecting to be classified, for billing purposes, as General Service-Time-Of-Use or Medium General Service-Time-Of-Use until January 1, 2024. APPLICATION: To commercial, industrial, governmental, and other types of general service customers with all service taken at one point and measured through one meter. All electrical requirements at one location shall be taken under this rate schedule. Not applicable to temporary or standby service. CHARACTER OF SERVICE: Single or three phase, 60 Hertz, alternating current at any one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. RATE: Customer Charge: $ 41.00 $38.00 Energy Charge: Non-Summer Energy: 17.921¢ 18.208¢ On-peak Energy / kWh Off-peak Energy / kWh 6.153¢ 6.251¢ Summer Energy: On-peak Energy / kWh 22.367¢ 22.725¢ Off-peak Energy / kWh 6.521¢ 6.625¢ Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December. Definition of On-Peak Energy: All energy used by the customer between the hours of 10:00 a.m. and 10:00 p.m. Monday through Friday. Definition of Off-Peak Energy: All energy used by the customer that is not on-peak energy. *Customer Charge: Customer charge per month plus any additional meter charge for costs above RPU's standard GS meter costs. POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). MINIMUM BILL: Customer charge per month. 20 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE GS-TOU SHEET 2 OF 2 PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. Service under this rate will be made available at the option of the general service customer, subject to the availability of the necessary TOU time of use metering equipment. 2. Customers converting to the GS-TOU rate from the General Service (GS) rate shall make a one-time payment to RPU for any conversion cost above the normal cost to install GS-TOU metering. 3. A customer may switch back to the GS rate providing the customer gives RPU at least 60 days notice and agrees to pay any metering conversion costs. 4. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 5. Unless authorized by a separate written agreement, standby electric generating equipment installed by the customer shall not be interconnected, or operated in parallel, with the RPU system. Customer shall own, install, operate, and maintain electrical interlocking equipment, which will prevent parallel operation, and such equipment shall be approved by RPU prior to installation. 6. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 9. Energy furnished under this rate shall not be resold. 10. This tariff assumes use of metering technology capable of being read using automated equipment. Customers choosing the option to have a meter that is not capable of being read using automated equipment, thus requiring a manual reading, are subject to a monthly surcharge. Additional one-time meter change-out fees also apply. (See the RPU Miscellaneous Fee Schedule for the amount of the monthly surcharge and the one-time meter change-out fees). Approved by Rochester Public Utility Board: November 20, 2018 October 26, 2021 Effective Date: January 1, 2019 2022 21 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE MGS SHEET 1 OF 2 MEDIUM GENERAL SERVICE AVAILABILITY: At all locations for loads where the demand is at least 75 kW or more for three or more billing periods in a given calendar year, but less than 1,000 kW, and where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. For loads where the service desired by the customer is not adjacent to the premises to be served, additional contract arrangements may be required prior to service being furnished. Customers with minimum loads of at least 50kW for three or more billing periods in a given calendar year but less than 75 kW can choose to be classified as Medium General Service (MGS) and be billed under the MGS rate schedule below. The choice, once elected, is irrevocable for 12 billing periods, and remain in force unless revoked in writing by the customer. Effective January 1, 2023 availability will be to facilities with loads of at least 25 KW. Customers with loads between 25 KW and 35 KW will have the option of selecting to be classified, for billing purposes, as General Service or Medium General Service until January 1, 2024. APPLICATION: To commercial, industrial, and governmental customers with all service taken at one point and measured through one meter. Also applicable to temporary service in accordance with RPU's published Electric Service Rules and Regulations. Not applicable to standby service. CHARACTER OF SERVICE: Single or three phase, 60 Hertz, alternating current at any one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. RATE: Demand Charge: Non-Summer /KW $ 17.830 $ 17.830 Summer /KW $ 24.060 $ 24.060 Energy Charge: Non-Summer / kWh 5.650¢ 5.760¢ Summer / kWh 5.650¢ 5.760¢ Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December. POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). POWER FACTOR ADJUSTMENT: The customer agrees to maintain an average power factor of 0.95 or greater for the billing period and to prevent a leading power factor. If the customer's average power factor is less than 0.95 for the billing period, the billing demand will be determined by multiplying the measured demand by 0.95 and dividing the results by the customer's average power factor. The average power factor is defined to be the quotient obtained by dividing the kWh used during the month by the square root of the sum of the squares of the kWh used and the lagging reactive kilovolt-ampere-hoursampere hours supplied during the same period. The customer's average power factor will be determined by means of permanently installed meters. PRIMARY METER DISCOUNT: Customers approved for metering at 13.8 kV will receive a discount of 1.25% on base rate charges for measured demand and energy. 23 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE MGS SHEET 2 OF 2 TRANSFORMER OWNERSHIP CREDIT: Customers owning transformers will receive a credit on each month's measured demand. Credit per KW $ 0.35 DETERMINATION OF DEMAND: Measured demand is defined as the maximum rate at which energy is used for any period of fifteen consecutive minutes during the billing period. The billing demand shall be the greater of the measured demand for the billing period adjusted for power factor, or 50% of the ratcheted demand. The ratcheted demand is the maximum measured demand adjusted for power factor of four consecutive billing cycles during the most recent May through October billing periods depending on the billing cycle. Billing periods may not coincide with calendar months. MINIMUM BILL: The minimum bill shall not be less than the billing demand, as provided above, whether or not energy is used. PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 2. Unless authorized by separate written agreement, standby electric generating equipment installed by the customer shall not be interconnected or operated in parallel with the RPU system. Customer shall own, install, operate, and maintain electrical interlocking equipment, which will prevent parallel operation, and such equipment shall be approved by RPU prior to installation. 3. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 4. Energy furnished under this rate shall not be resold. Approved by Rochester Public Utility Board: November 20, 2018 October 26, 2021 Effective Date: January 1, 2020 2022 24 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE MGS-HEF SHEET 1 OF 3 MEDIUM GENERAL SERVICE - HIGH EFFICIENCY HVAC - Closed AVAILABILITY: At all locations for loads where the demand is at least 75 kW or more for three or more billing periods in a given calendar year, but less than 1,000 kW, and where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served, and to customers who: 1. Are currently on the Medium General Service-High Efficiency HVAC rate as of January 1, 2022. 2. Use either an air source or ground source heat pump as the only source of heating and cooling in their facility. 3. Use an electric water heater (usually connected to a desuperheater on the heat pump) as the only source of water heating. 4. Receive prior approval of the equipment from RPU. Note that equipment must be rated by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI)* and at the time of installation, meet the minimum efficiency requirements found on the Commercial Heat Pumps Rebate Application in effect at the time. The current application is available at www.rpu.org. 5. Service under this rate must be separately metered from other facility loads. Effective January 1, 2023 availability will be to facilities with loads of at least 25 KW. Customers with loads between 25 KW and 35 KW will have the option of selecting to be classified, for billing purposes, as General Service-High Efficiency HVAC or Medium General Service-High Efficiency HVAC until January 1, 2024. *For air source and ground source heat pumps the efficiency ratings are determined using the Air- Conditioning, Heating and Refrigeration Institute’s (AHRI) directory, which may be found at www.ahridirectory.org. Note: Other all-electric HVAC systems may be considered for this rate if they meet the stated efficiency standards. To have a system considered, customers must submit an engineering analysis documenting the efficiency of the system. APPLICATION: To commercial, industrial, governmental, and other types of Medium General Service customers reconfiguring their current electric service, or adding a new service, to separately meter their high efficiency HVAC equipment. Not applicable to standby service. CHARACTER OF SERVICE: Single or three phase 60 Hertz, alternating current at any one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. RATE: Demand Charge per KW: Non-Summer $ 16.500 Summer $ 20.640 Energy Charge per kWh: Non-Summer 4.724¢ 4.816¢ Summer 5.881¢ 5.996¢ Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December. 25 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE MGS-HEF SHEET 2 OF 3 POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). POWER FACTOR ADJUSTMENT: The customer agrees to maintain an average power factor of 0.95 or greater for the billing period and to prevent a leading power factor. If the customer's average power factor is less than 0.95 for the billing period, the billing demand will be determined by multiplying the measured demand by 0.95 and dividing the results by the customer's average power factor. The average power factor is defined to be the quotient obtained by dividing the kWh used during the month by the square root of the sum of the squares of the kWh used and the lagging reactive kilovolt-ampere-hoursampere hours supplied during the same period. The customer's average power factor will be determined by means of permanently installed meters. PRIMARY METER DISCOUNT: Customers approved for metering at 13.8 kV will receive a discount of 1.25% on base rate charges for measured demand and energy. TRANSFORMER OWNERSHIP CREDIT: Customers owning transformers will receive a credit on each month's measured demand. Credit per KW $ 0.35 DETERMINATION OF DEMAND: Measured demand is defined as the maximum rate at which energy is used for any period of fifteen consecutive minutes during the billing period. The billing demand shall be the greater of the measured demand for the billing period adjusted for power factor, or 50% of the ratcheted demand. The ratcheted demand is the maximum measured demand adjusted for power factor of four consecutive billing cycles during the most recent May through October billing periods depending on the billing cycle. Billing periods may not coincide with calendar months. For an existing facility reconfiguring its current electric service to come under this rate by separately metering its high efficiency HVAC equipment, the ratchet will be removed from the current electric service. The ratchet will be effective beginning in October following the first separately metered high efficiency HVAC service during one of the May through October billing periods described above. At that time the ratchet will be reapplied to the current electric service and will be applied for the first time to the high-efficiency HVAC service. MINIMUM BILL: The minimum bill shall not be less than the billing demand, as provided above, whether or not energy is used. PAYMENT: Payments are due on or before the due date. 26 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE MGS-HEF SHEET 3 OF 3 CONDITIONS OF DELIVERY: 1. Service under this rate is only for air source or ground source heat pumps and any other all- electric HVAC systems that meet the stated efficiency requirements as explained in the Availability subhead of this rate schedule. 2. Service under this rate must be separately metered from other facility loads. 3. Since the HVAC system must be separately metered for this rate, the customer is responsible for any rewiring and its associated costs. 4. Service provided under this rate is subject to applicable provisions of RPU’s published Electric Service Rules and Regulations. 5. Energy provided under this rate shall not be resold. 6. RPU shall not be liable for any damage or loss sustained by the customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 7. Unless authorized by separate written agreement, standby electric generating equipment installed by the customer shall not be interconnected, or operated in parallel, with the RPU system. Customer shall own, install, operate, and maintain electrical interlocking equipment, which will prevent parallel operation, and such equipment shall be approved by RPU prior to installation. Approved by Rochester Public Utility Board: November 12, 2019 Effective Date: January 1, 2020 2022 27 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE MGS-TOU SHEET 1 OF 3 MEDIUM GENERAL SERVICE - TIME-OF-USE AVAILABILITY: At all locations for loads where the demand is at least 75 kW or more for three or more billing periods in a given calendar year, but less than 1,000 kW, and where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. For loads where the service desired by the customer is not adjacent to the premises to be served, additional contract arrangements may be required prior to service being furnished. RPU reserves the right to limit both the number of customers and the amount of load taken under this rate schedule. Effective January 1, 2023 availability will be to facilities with loads of at least 25 KW. Customers with loads between 25 KW and 35 KW will have the option of selecting to be classified, for billing purposes, as General Service-High Efficiency HVAC or Medium General Service-High Efficiency HVAC until January 1, 2024. APPLICATION: To commercial, industrial, and governmental customers with all service taken at one point and measured through one meter. All electrical requirements at one location shall be taken under this rate schedule. Not applicable to temporary or standby service. CHARACTER OF SERVICE: Single or three phase, 60 Hertz, alternating current at any one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. RATE: Meter Charge: Any additional meter charge for costs above RPU's standard MGS meter costs. Non-Summer: On-peak Demand / KW $ 17.830 Off-peak Demand/ KW $ 1.933 Energy Charge / kWh 5.724¢ 5.947¢ Summer: On-peak Demand / KW $ 24.060 Off-peak Demand / KW $ 1.933 Energy Charge / kWh 5.724¢ 5.947¢ Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December. Definition of On-Peak Demand: The maximum kW used by the customer in any fifteen-minute period between the hours of 10:00 a.m. and 10:00 p.m. Monday through Friday. Definition of Off-Peak Demand: The maximum kW used by the customer in any fifteen-minute period during the off-peak period. POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). 28 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE MGS-TOU SHEET 2 OF 3 POWER FACTOR ADJUSTMENT: The customer agrees to maintain an average power factor of 0.95 or greater for the billing period and to prevent a leading power factor. If the customer's average power factor is less than 0.95 for the billing period, the billing demand will be determined by multiplying the measured demand by 0.95 and dividing the results by the customer's average power factor. The average power factor is defined to be the quotient obtained by dividing the kWh used during the month by the square root of the sum of the squares of the kWh used and the lagging reactive kilovolt-ampere-hoursampere hours supplied during the same period. The customer's average power factor will be determined by means of permanently installed meters. PRIMARY METER DISCOUNT: Customers approved for metering at 13.8 kV will receive a discount of 1.25% on base rate charges for measured demand and energy. TRANSFORMER OWNERSHIP CREDIT: Customers owning transformers will receive a credit on each month's measured demand. Credit per KW $ 0.35 DETERMINATION OF DEMAND: Measured demand is defined as the maximum rate at which energy is used for any period of fifteen consecutive minutes during the billing period. BILLING DEMAND: The on-peak billing demand shall be the greater of the measured on-peak demand for the billing period adjusted for power factor, or 50% of the ratcheted on-peak demand. The ratcheted on-peak demand is the maximum measured on-peak demand adjusted for power factor of four consecutive billing cycles during the most recent May through October billing periods depending on the billing cycle. Billing periods may not coincide with calendar months. The off-peak billing demand shall be the measured off-peak demand for the billing period adjusted for power factor less the on-peak billing demand for the billing period. The total billing demand shall be the sum of the on-peak billing demand and the off-peak billing demand. MINIMUM BILL: The minimum bill shall not be less than the billing demand, as provided above, whether or not energy is used plus any meter charge. PAYMENT: Payments are due on or before the due date. 29 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE MGS-TOU SHEET 3 OF 3 CONDITIONS OF DELIVERY: 1. Service under this rate will be made available at the option of the medium general service customer, subject to the availability of the necessary TOU metering equipment. 2. Customers converting to the MGS-TOU rate from the MGS rate shall make a one-time payment to RPU for any conversion cost above the normal cost to install MGS-TOU metering. 3. A customer may switch back to the MGS rate providing the customer gives RPU at least 60 days notice and agrees to pay any metering conversion costs. 4. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 5. Unless authorized by a separate written agreement, standby electric generating equipment installed by the customer shall not be interconnected or operated in parallel with the RPU system. Customer shall own, install, operate, and maintain electrical interlocking equipment, which will prevent parallel operation, and such equipment shall be approved by RPU prior to installation. 6. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 7. Energy furnished under this rate shall not be resold. Approved by Rochester Public Utility Board: November 12, 2019 October 26,2021 Effective Date: January 1, 2020 2022 30 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE LGS SHEET 1 OF 2 LARGE GENERAL SERVICE AVAILABILITY: At all locations for loads where the measured demand is at least 1,000 kW or more for three or more billing periods in a given calendar year, but less than 10,000 kW, and where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. For loads where the service desired by the customer is not adjacent to the premises to be served, additional contract arrangements may be required prior to service being furnished. APPLICATION: To commercial, industrial, and governmental customers with all service taken at one point and measured through one meter. Also applicable to temporary service in accordance with RPU's published Electric Service Rules and Regulations. Not applicable to standby service. CHARACTER OF SERVICE: Three phase, 60 Hertz, alternating current at any one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. RATE: Demand Charge / KW $ 20.000 $ 21.00 Energy Charge / kWh 5.867¢ 5.760¢ POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). POWER FACTOR ADJUSTMENT: The customer agrees to maintain an average power factor of 0.95 or greater for the billing period and to prevent a leading power factor. If the customer's average power factor is less than 0.95 for the billing period, the billing demand will be determined by multiplying the measured demand by 0.95 and dividing the results by the customer's average power factor. The average power factor is defined to be the quotient obtained by dividing the kWh used during the month by the square root of the sum of the squares of the kWh used and the lagging reactive kilovolt-ampere-hoursampere hours supplied during the same period. The customer's average power factor will be determined by means of permanently installed meters. PRIMARY METER DISCOUNT: Customers approved for metering at 13.8 kV will receive a discount of 1.25% on base rate charges for measured demand and energy. TRANSFORMER OWNERSHIP CREDIT: Customers owning transformers will receive a credit on each month's measured demand. Credit per KW $ 0.35 31 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE LGS SHEET 2 OF 2 DETERMINATION OF DEMAND: Measured demand is defined as the maximum rate at which energy is used for any period of fifteen consecutive minutes during the billing period. The billing demand shall be the greater of the measured demand for the billing period adjusted for power factor, or 50% of the ratcheted demand. The ratcheted demand is the maximum measured demand adjusted for power factor of four consecutive billing cycles during the most recent May through October billing periods depending on the billing cycle. Billing periods may not coincide with calendar months. MINIMUM BILL: The minimum bill shall not be less than the billing demand, as provided above, whether or not energy is used. PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 2. Unless authorized by a separate written agreement, standby electric generating equipment installed by the customer shall not be interconnected or operated in parallel with the RPU system. Customer shall own, install, operate, and maintain electrical interlocking equipment, which will prevent parallel operation, and such equipment shall be approved by RPU prior to installation. 3. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 4. Energy furnished under this rate shall not be resold. 5. A separate electric service agreement may be required for service under this rate schedule. Approved by Rochester Public Utility Board: November 12, 2019 October, 26, 2022 Effective Date: January 1, 2020 2022 32 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE LIS SHEET 1 OF 2 LARGE INDUSTRIAL SERVICE AVAILABILITY: At all locations for loads with measured demands in excess of 10,000 kW for three or more billing periods in a given calendar year, and where facilities of adequate capacity and voltage are adjacent to the premises to be served. For loads where the service desired by the customer is not adjacent to the premises to be served, contract arrangements may be required prior to service being furnished. APPLICATION: To industrial customers with all service taken at one point and measured through one meter or meter totalizer. Not applicable to stand-by service. CHARACTER OF SERVICE: Three phase, 60 Hertz alternating current at 13,800 GRDY/7970 volts. RATE: Demand Charge / KW $ 20.500 $ 20.50 Energy Charge / kWh 5.240¢ 5.340¢ POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). POWER FACTOR ADJUSTMENT: The customer agrees to maintain an average power factor of 0.95 or greater for the billing period and to prevent a leading power factor. If the customer's average power factor is less than 0.95 for the billing period, the billing demand will be determined by multiplying the measured demand by 0.95 and dividing the results by the customer's average power factor. The average power factor is defined to be the quotient obtained by dividing the kWh used during the month by the square root of the sum of the squares of the kWh used and the lagging reactive kilovolt-ampere-hoursampere hours supplied during the same period. The customer's average power factor will be determined by means of permanently installed meters. DETERMINATION OF DEMAND: Measured demand is defined as the maximum rate at which energy is used for any period of fifteen consecutive minutes during the billing period. The billing demand shall be the greater of the measured demand for the billing period adjusted for power factor, or 50% of the ratcheted demand. The ratcheted demand is the maximum measured demand adjusted for power factor of four consecutive billing cycles during the most recent May through October billing periods depending on the billing cycle. Billing periods may not coincide with calendar months. MINIMUM BILL: The minimum bill shall not be less than the billing demand, as provided above, whether or not energy is used. PAYMENT: Payments are due on or before the due date. 33 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE LIS SHEET 2 OF 2 CONDITIONS OF DELIVERY: 1. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 2. Unless authorized by separate written agreement, stand-by electric generating equipment installed by the customer shall not be interconnected or operated in parallel with the RPU system: Customer shall own, install, operate, and maintain electrical interlocking equipment which will prevent parallel operation, and such equipment shall be approved by RPU prior to installation. 3. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies or imperfections of service provided under this rate. 4. Energy furnished under this rate shall not be resold. 5. Customer agrees to manage its utilization equipment so as not to unbalance the current per phase by more than 10%. 6. RPU may require a separate electric service agreement for service under this rate schedule. Approved by Rochester Public Utility Board: November 12, 2019 October 26, 2021 Effective Date: January 1, 2020 2022 34 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE INTR SHEET 1 OF 4 INTERRUPTIBLE SERVICE AVAILABILITY: At all locations for customers who qualify and where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. Additional contractual arrangements may be required prior to service being furnished. RPU reserves the right to limit the amount of interruptible load taken by a customer and the total amount of interruptible load on the RPU system. APPLICATION: To commercial, industrial, and governmental customers contracting for electrical service for a period of one (1) year or more and having an interruptible load with a measured demand of 100 kW or more. The INTR interruptible rate schedule is used in conjunction with the MGS, LGS, and LIS firm power rate schedules. To qualify for the INTR rate schedule, customers must have a minimum of 100 kW of interruptible demand. RPU reserves the right to limit the amount of interruptible load, which may be nominated. Customers who qualify for the INTR rate shall either nominate an interruptible demand amount or a firm demand amount. Customers nominating an interruptible demand amount shall be required to interrupt at least the amount nominated, or their total load if their total load is less than the amount nominated. Customers nominating a firm demand amount shall be required to interrupt an amount sufficient to bring their load to or below the firm demand nominated. In no case shall the INTR rate be made available to customers with less than 100 kW of interruptible load. All interruptible loads recognized under the INTR rate schedule shall be electrical loads that are coincident with RPU's system peak. Customers' electrical loads occurring outside this peak period shall not qualify for the INTR rate schedule. Any generation equipment used by the customer to qualify for the INTR rate shall be located at the site of the interruptible load such that RPU does not have to use its electrical facilities to transmit power for the customer. CHARACTER OF SERVICE: Three phase, 60 Hertz, alternating current at one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. Service is subject to interruption at the sole discretion of RPU at any time during the year. There will be no more than 175 hours or 35 interruptions per year. RATE: MGS, LGS, and LIS customers are billed for interruptible power at the following rates: Demand Charge per KW: MGS $ 12.950 LGS $ 11.640 LIS $ 11.720 The Energy Charge per kWh shall be equal to the appropriate customer class energy rate defined in the rate tariffs for the MGS, LGS, and LIS customer classes. POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). 35 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE INTR SHEET 2 OF 4 POWER FACTOR ADJUSTMENT: The customer agrees to maintain an average power factor of 0.95 or greater for the billing period and to prevent a leading power factor. If the customer's average power factor is less than 0.95 for the billing period, the billing demand will be determined by multiplying the measured demand by 0.95 and dividing the results by the customer's average power factor. The average power factor is defined to be the quotient obtained by dividing the kWh used during the month by the square root of the sum of the squares of the kWh used and the lagging reactive kilovolt-ampere-hoursampere hours supplied during the same period. The customer's average power factor will be determined by means of permanently installed meters. PRIMARY METER DISCOUNT: Customers approved for metering at 13.8 kV will receive a discount of 1.25% on base rate charges for measured demand and energy. TRANSFORMER OWNERSHIP CREDIT: Customers owning transformers will receive a credit on each month's measured demand. Credit per / KW $ 0.35 SURCHARGE: Customers whose service is taken outside the Rochester City limits are subject to a 10% surcharge on their bills (excluding charges computed under the Power Cost Adjustment). PENALTY: Unauthorized use of electricity during a peak period of service interruption ordered by RPU will require the customer to pay a penalty (in addition to standard charges) which is reflective of the uninterrupted load's cost impact on RPU's wholesale power cost from SMMPA over the ensuing 12 months: A. No impact - No penalty B. Occurs on monthly peak - Uninterrupted kW contribution to RPU's peak is billed at SMMPA rate. C. Occurs on annual peak (as determined by analysis from October 1 analysis of summer demands) - Uninterrupted kW contribution to RPU's annual peak is additionally penalized at two times SMMPA rate and added to participants October billing. Exception for first-time participants in an RPU peak reduction rate who have interruptible nominations of less than 500KW: The penalty for failure to interrupt will be waived during the initial 24 months. DETERMINATION OF DEMAND: Measured demand is defined as the maximum rate at which energy is used for any period of fifteen (15) consecutive minutes during the billing period. 36 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE INTR SHEET 3 OF 4 BILLING DEMAND: Customers nominating an amount of interruptible demand are required to interrupt at least their nominated interruptible demand. Customers may interrupt demand greater than their nominated interruptible demand. The billed interruptible demand for the month shall be the hourly integrated demand interrupted during the peak period of a service interruption requested by RPU. This interruptible demand will be billed at the appropriate interruptible rate for that month. Where no RPU requested interruption occurs during the month, all demand above the nominated interruptible demand shall be billed at the firm demand rate under the appropriate MGS, LGS, or LIS firm rate schedule. Customers nominating an amount of firm demand are required to interrupt all demand over their firm service level. Customers may interrupt demand below the firm service level. When peak metered demand for the billing period is equal to or greater than the firm service level, the Firm Billing Demand shall be equal to the actual metered demand during the RPU-requested service interruption concurrent with the system peak for the billing period When peak metered demand for the billing period is less than the firm service level, the Firm Billing Demand will be the greater of either the peak metered demand for the billing period minus the actual demand reduction during the RPU-requested service interruption concurrent with the RPU system peak for the billing period, or 50% of the Firm Demand Nomination for the most current June-September months minus the actual demand reduction during the RPU- requested service interruption concurrent with the RPU system peak for the billing period. All demand above the firm service level for the month shall be billed at the appropriate interruptible rate. Where no RPU requested interruption occurs during the month, all demand up to the firm demand nomination shall be billed at the appropriate firm demand rate. Both firm and interruptible billing demands shall be adjusted for power factor. There is no ratchet provision for interruptible demand. MINIMUM BILL: The minimum bill shall not be less than the adjusted billing demand, as provided above, whether or not energy is used. PAYMENT: Payments are due on or before the due date. 37 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE INTR SHEET 4 OF 4 CONDITIONS OF DELIVERY: 1. Service furnished under this rate schedule is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 2. The Customer shall install, own, operate, and maintain the equipment necessary to interrupt its load. 3. In certain cases, the interruptible portion of the customer's load may have to be metered separately. 4. The Customer shall pay in advance of construction, all costs estimated by RPU for facilities located on Customer's premises which are necessary to serve the interruptible portion of the Customer's load and which duplicate other RPU facilities which are utilized to deliver electric service under other schedules. This includes any special metering needed for RPU to administer the INTR rate. Upon completion of the installation of such facilities by RPU, the actual cost of such facilities shall be charged to the Customer with the Customer's advance payment being applied as credit to such actual costs. The cost of major renewal and replacement of RPU-owned electric facilities located on the Customer's premises which are utilized for interruptible service and which duplicate other RPU facilities, shall be borne by the Customer. 5. When notified by RPU, the Customer shall remove the interruptible portion of its load from RPU's system in two (2) hours or less. 6. Upon one year's notice to the Customer, RPU may modify the hours and frequency of interruption specified herein to reflect changes in RPU's electric system load characteristics. 7. Interruptions of service caused by fire, accident, explosion, flood, strike, acts of God, or causes other than intentional interruptions ordered by RPU shall not be considered in determining the hours or frequency of interruption specified herein. 8. RPU, at its sole discretion, may immediately terminate service under this rate schedule upon the repeated unauthorized use of electricity by the customer during periods of interruption ordered by RPU. 9. Interruptible service shall not be used as standby for any other forms of energy or fuel. 10. Unless authorized by a separate written agreement, standby electric generating equipment installed by the Customer shall not be interconnected or operated in parallel with the RPU system. Customer shall own, install, operate, and maintain electrical interlocking equipment, which will prevent parallel operation, and such equipment shall be approved by RPU prior to installation. RPU shall have the right to inspect the Customer's interrupting facilities as often as deemed prudent by RPU to verify their operating condition and proper interconnection. 11. RPU shall not be liable for any damage or loss sustained by Customer resulting from interruptions, deficiencies or imperfections of service provided under this rate. 12. Energy furnished under this rate shall not be resold. 13. Customers shall provide RPU with sufficient advance notice of their intention to use the INTR rate to allow RPU time to provide any necessary supplemental equipment and metering. 14. Customers using the INTR rate shall notify RPU in writing of their intention to use either the interruptible demand nomination or the firm demand nomination and the amount of their interruptible or firm loads. 15. Customers may change their method of nomination or level of nomination or both no more frequently than once per year with 60 days written notice and approval from RPU. Approved by Rochester Public Utility Board: November 20, 2018 Effective Date: January 1, 2019 38 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE PCA SHEET 1 OF 1 POWER COST ADJUSTMENT APPLICATION: Applicable to all rate schedules where there is a kWh charge. 1. The Power Cost Adjustment will be determined monthly, on a 12 month rolling average basis with application to the first revenue cycle each month. 2. The Power Cost Adjustment is determined by calculating the average actual cost per kWh of retail power supply from all sources, during the previous 12 months, and subtracting the Established Power Supply Cost. All calculations will be carried out to $.00001 per kWh. Power supply costs include the cost of purchased power including charges for energy, demand, transmission, cost adjustments, and fees for regional power grid services. 3. The Established Power Supply Cost Base of $0.07285 was determined by the 2014 cost of service study. The base will remain at this level until subsequent review identifies a permanent and substantial change in the cost of power. 4. The Power Cost Adjustment will be the difference between the actual amount per kWh calculated in #2 above and the Established Power Supply Cost Base/ kWh.. This dollar amount per kWh will be added (subtracted) to each kWh of sales. Approved by Rochester Public Utility Board: August 26, 2013 October 26, 2021 Effective Date: January 1, 2015 2022 39 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE LMC SHEET 1 OF 1 LOAD MANAGEMENT CREDITS AVAILABILITY: To customers participating in RPU's direct control load management program. APPLICATION: This rate schedule rider is to be applied in conjunction with all applicable rate schedules: MONTHLY CREDIT # MONTHS APPLIED Qualifying Central Air Conditioner $ 3.00 each 5 months (May through September) Qualifying Electric Water Heater $ 3.00 each 12 months TERMS AND CONDITIONS: 1. Participation in the direct control load management program is voluntary. 2. Customer agrees to participate in the program for one year or longer. 3. Qualifying appliances are central air conditioners up to 8 kW and electric water heaters with a minimum capacity of 40 gallons. Central air-conditioners above 8 kW, electric water heaters above 85 gallons, and other appliances or electrical loads applicable to direct control load management by RPU may be accepted by RPU in this program. In these cases, applicable credits will be calculated on a case by case basis. 4. Customer agrees to not utilize any other load management system in conjunction with equipment directly controlled by RPU. 5. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. Approved by Rochester Public Utility Board: November 14, 2017 Effective Date: Contingent upon implementation of RPU’s new customer billing system. 40 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE CSL SHEET 1 OF 1 CITY STREET LIGHTING AVAILABILITY: To the City of Rochester for the illumination of public thoroughfares by means of RPU owned overhead street lighting facilities. RATE: Per kWh for all kWh Billed Mercury Vapor (all Sizes) 23.249¢ Metal Halide (All Sizes) 24.657¢ LED RPU Owned (All Sizes) 55.720¢ LED (All Sizes) 41.650¢ High Pressure Sodium (All Sizes) 23.249¢ POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). CONDITIONS OF DELIVERY: 1. This rate is based on lamps being lighted every night from approximately 30 minutes after sunset to 30 minutes before sunrise, providing dusk to dawn operation. 2. RPU will replace inoperative lamps and otherwise maintain luminaires during regular daytime hours. No credit will be allowed for periods during which the lamps are out of service. Routine lamp replacement will be made on a group replacement schedule. 3. RPU will determine the amount of energy used during any month by multiplying the rated kilowatt capacity of all lamps and accessory equipment by 350 hours for the month. 4. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. Approved by Rochester Public Utility Board: October 27, 2020 Effective Date: January 1, 2021 41 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE TS SHEET 1 OF 1 TRAFFIC SIGNALS AVAILABILITY: To governmental units for electric service to customer-owned traffic signal systems on public streets. RATE: Monthly Fixed charge: per traffic signal control cabinet served: Fixed Charge: $ 34.00 Energy Charge / kWh 10.547¢ MINIMUM BILL: The minimum bill is per traffic signal control cabinet served for any month or portion of a month. $ 34.00 POWER COST ADJUSTMENT: Bills computed under this rate schedule are subject to adjustment in accordance with the Power Cost Adjustment (PCA). CONDITIONS OF DELIVERY: 1. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. November 20, 2018 Approved by Rochester Public Utility Board: Effective Date: January 1, 2019 42 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE CDS SHEET 1 OF 1 CIVIL DEFENSE SIRENS AVAILABILITY: At all locations where facilities of adequate capacity and suitable voltage are adjacent to the location of the siren to be served. APPLICATION: To Olmsted County Civil Defense for the periodic operation of civil defense sirens. CHARACTER OF SERVICE: Single of three phase, 60 Hertz, alternating current at any one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. RATE: Per siren per month $ 16.60 MINIMUM BILL: The minimum bill is per siren for any month or portion of a month. Minimum Bill $ 16.60 PAYMENT: Bills will be rendered monthly; payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. The customer shall furnish, install, own, operate, and maintain all sirens. The customer shall also furnish, install, own, and maintain any structures required for the mounting and support of sirens; except where the customer specifically requests and RPU agrees to use RPU owned poles for this purpose. In such cases, RPU will assist in the installation and removal of sirens and the customer shall pay RPU for the actual costs thereof. 2. When RPU does not have secondary service available at the siren location and it is necessary to install a transformer or to extend secondary lines a distance greater than 150 feet, the customer shall pay RPU the actual costs for installing the transformer and/or making such line extensions. 3. RPU will make the connection and disconnection with its distribution lines. 4. Loads other than sirens shall not be connected to the siren's circuit. 5. The customer shall furnish RPU with a map indicating the location of sirens to be operated and shall notify RPU at least 30 days in advance of the planned addition, removal, or relocation of any siren. 6. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. November 20, 2018 Approved by Rochester Public Utility Board: Effective Date: January 1, 2019 43 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE SL SHEET 1 OF 1 SECURITY LIGHTING AVAILABILITY: At all locations whenever the service can be provided with overhead wiring on an existing RPU owned pole. APPLICATION: To all classes of customers contracting for security lighting. RATE: Monthly Charge Mercury Vapor Lights (Closed) Size: 175 Watt Mercury Vapor $ 10.65 250 Watt Mercury Vapor $ 13.02 400 Watt Mercury Vapor $ 18.50 High Pressure Sodium Vapor Lights (Closed) Size: 70 Watt $ 9.27 100 Watt $ 11.04 150 Watt (Roadway) $ 12.42 250 Watt $ 15.46 400 Watt $ 20.27 Light Emitting Diode (LED) Lights Size: LED Area Light $ 11.04 LED Roadway Light $ 15.46 PAYMENT: Bills will be rendered monthly; payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. RPU will furnish, install, own, and maintain a standard lighting unit consisting of a luminaire, complete with lamp and control device wired for operation, supported by a bracket mounted on an RPU owned pole, and will supply all electrical energy necessary for the operation of the unit. 2. When RPU does not have a suitable pole or secondary service available at the desired location and it is necessary to install a transformer or a pole or to extend secondary lines a distance greater than 150 feet, the customer shall pay RPU the actual costs for installing the transformer or pole and/or making such line extensions. 3. Service under this rate is not available underground or in underground areas unless the customer pays RPU the complete cost of the necessary underground facilities. 4. Lamps will automatically be switched on approximately 30 minutes after sunset and off 30 minutes before sunrise, providing dusk to dawn operation of approximately 4,200 hours per year. 5. RPU will make every attempt to replace inoperative lamps and maintain luminaries during regular daytime work hours within 3 working days after notification. No credit will be allowed for periods during which the lamp was out of service. 6. RPU will, at the customer's expense, relocate or change the position of any lamp or pole as requested in writing by the customer. 7. Service furnished under this rate is subject to applicable provisions of RPU's published Electric Service Rules and Regulations. 8. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. Approved by Rochester Public Utility Board: November 20, 2018 44 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Effective Date: January 1, 2019 RATE SCHEDULE UMDR SHEET 1 OF 1 UNMETERED DEVICE RATE AVAILABILITY: At all locations where facilities of adequate capacity and suitable voltage are adjacent to the location of the device to be served. APPLICATION: To commercial customers where the estimated monthly kwh required does not exceed 300 kwh and is determined by RPU to not warrant a meter. CHARACTER OF SERVICE: Single of three phase, 60 Hertz, alternating current at any one of the standard secondary service voltages as described in RPU's published Electric Service Rules and Regulations. RATE: Fixed Charge per device per month $ 11.18 Energy Charge / kWh 11.448¢ MINIMUM BILL: The minimum bill is per device for any month or portion of a month. Minimum Bill $ 11.18 PAYMENT: Bills will be rendered monthly; payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. The customer shall furnish, install, own, operate, and maintain all devices. The customer shall also furnish, install, own, and maintain any structures required for the mounting and support of devices; except where the customer specifically requests and RPU agrees to use RPU owned poles for this purpose. In such cases, RPU will assist in the installation and removal of devices and the customer shall pay RPU for the actual costs thereof. 2. When RPU does not have secondary service available at the device location and it is necessary to install a transformer or to extend secondary lines a distance greater than 150 feet, the customer shall pay RPU the actual costs for installing the transformer and/or making such line extensions. 3. RPU will make the connection and disconnection with its distribution lines. 4. Loads other than the device shall not be connected to the device's circuit. 5. The customer shall furnish RPU with a map indicating the location of sirens to be operated and shall notify RPU at least 30 days in advance of the planned addition, removal, or relocation of any siren. 6. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. Approved by Rochester Public Utility Board: November 20, 2018 Effective Date: November 1, 2019 45 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE CAR SHEET 1 OF 1 CLEAN AIR RIDER APPLICATION: The Clean Air Rider (CAR) will be used to recover costs related to renewable and environmental improvement programs and projects approved by the Utility Board. Applicable to all rate classes billed in kWh. CONDITIONS OF DELIVERY: 1. Emission Reduction Project at Silver Lake Plant: a. The CAR for the Emission Reduction Project (ERP) at the Silver Lake Plant is to recover the annual debt service of the project. b. The CAR for the ERP will be calculated by dividing the ERP debt service requirements by the KWH forecast for all rate classes. This monthly charge under the CAR Schedule for 2020 is $0.00191/kwh. c. The CAR will terminate for the ERP with payment of all debt service requirements. d. An annual true-up will be done comparing the actual amount collected to the actual debt service requirement. The amount over or under collected will adjust future years debt service requirements used in the calculation. Approved by Rochester Public Utility Board: November 12, 2019 Effective Date: January 1, 2020 46 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE SPP SHEET 1 OF 2 SCHEDULE I ROCHESTER PUBLIC UTILITIES COGENERATION AND SMALL POWER PRODUCTION TARIFF AVAILABILITY: By separate written agreement only. APPLICATION: To residential and general service customers contracting for electric service for one year or more, with all service taken at one point and where part or all of the electrical requirements of the customer can be supplied by customer-owned electrical generating equipment which is connected for operation in parallel with RPU’s system. This rate schedule rider is to be applied in conjunction with the following schedules:  Residential Service (RES)  General Service (GS)  Medium General Service (MGS)  Large General Service (LGS)  Large Industrial Service (LIS)  Power Cost Adjustment (PCA) CHARACTER OF SERVICE: Single or three phase, 60 Hertz alternating current at any one of the standard secondary service voltages as described in RPU’s published electric Service Rules and Regulations. RATE: Demand Charge: The demand charge shall be determined in accordance with the applicable rate schedule (MGS, LGS and LIS customers only) and shall be applied in accordance with the provisions of Section VII (C) of RPU’s Rules Covering Cogeneration and Small Power Production Facilities. Energy Charge: The energy charge shall be determined in accordance with the applicable rate schedule (RES, GS MGS, LGS or LIS customers) and shall be applied in accordance with the provisions of Section VII (B or C as applicable) of RPU’s Rules Covering Cogeneration and Small Power Production Facilities. Minimum Charge: The minimum charge shall be determined in accordance with the applicable rate schedule (RES, GS, MGS, LGS, or LIS customers). Energy and Capacity Credits: The energy and capacity credits shall be applied in accordance with the provisions of Section VII (B or C as applicable) of RPU’s Rules Covering Cogeneration and Small Power Production Facilities. POWER COST ADJUSTMENT: The energy credit computed under this rate schedule rider is subject to a Power Cost Adjustment. 47 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE SPP SHEET 2 OF 2 PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. Service furnished under this rate schedule rider is subject to applicable provisions of RPU’s published Electric Service Rules and Regulations and Rules Covering Cogeneration and Small Power Production. 2. Service under this rate schedule rider will be furnished only to customers whose maximum electrical generating capacity is 40 kW or less; such service may be limited at the sole discretion of RPU, to those customers who obtain “qualifying” status under FERC Regulations (18CFR Part 292) implementing section 201 of the Public Utility Regulatory Policies Act of 1978. 3. Service under this rate schedule rider will be furnished only after the customer and RPU have entered into a separate written agreement which specifies the type of metering and interconnection facilities to be employed, the responsibilities for installation, ownership, and maintenance of these facilities, and the procedures required for safe and technically acceptable operation of parallel electrical generating equipment. 4. RPU shall not be liable for any damage or loss sustained by the customer resulting from the parallel operation of the customer’s electrical generating equipment, or resulting from interruptions, deficiencies, or imperfections of service provided under this rate schedule rider. 5. Energy furnished under this rate schedule rider shall not be resold. Approved by Rochester Public Utility Board: March 28, 2006 Effective Date: April 4, 2006 48 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE PEVC SHEET 1 OF 1 RPU PUBLIC ELECTRIC VEHICLE CHARGING RATE - CLOSED AVAILABILITY: To Electric and Plug-in Hybrid vehicles with level 1 or level 2 charging capability, at RPU managed car charging stations. RATE: Per Hour of Plugged In Time Amount The hours of 4 pm – 7 pm $2.00 per hour All other hours .75¢ per hour CONDITIONS OF DELIVERY: 1. Customers must be registered with ChargePoint and have a ChargePoint RFID card, or have the ChargePoint app installed on a smartphone. Instructions are available at ChargePoint.com.* 2. Station payment is managed by a third party, ChargePoint.com, and requires prepayment by credit card. RPU is unable to take payment to recharge your ChargePoint card. * 3. It is recommended to have a smartphone enabled device with the Chargepoint App installed. 4. Rates are applied during the time period the car is plugged in. Not when the car starts or finishes charging. 5. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. *For instructions on how to register for a ChargePoint RFID card, please visit ChargePoint.com or contact RPU Customer Service Approved by Rochester Public Utility Board: November 14, 2017 Effective Date: January 1, 2018 49 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE LINEEXT SHEET 1 OF 1 LINE EXTENSIONS AVAILABILITY: Available to all customers and developers in RPU’s Service Territory. APPLICATION: The Rules for Line Extensions in this schedule apply to all existing and prospective customers requesting a new line extension or change of existing service. RATE: Residential $900 / Standard Service*** Commercial, Industrial and Multi-Family Housing Installed Transformer Capacity Up to 25 kVA $1,100 / Standard Service* 25 kVA up to 50 kVA $2,500 / Standard Service* 50 kVA up to 75 kVA $4,500 / Standard Service* 75 kVA up to 10,000 kVA Total cost of Standard Service less a credit of $63/kVA of installed transformer Capacity** Above 10,000 kVA and/or Non-Standard Service Negotiated *Single Phase Service is assumed. If three phase service is requested, the customer must also pay the difference between three phase and single phase service. **In cases where the installed transformer credit offsets the total cost of the Standard Service, no additional amount will be charged. ***For the purposes of this rate schedule, Standard Residential Service is considered to be a single lot or single structure with three or fewer dwelling units. PAYMENT: Payments must be received before work on the line extension or enhancement will begin. Approved by Rochester Public Utility Board: April 25, 2017 Effective Date: January 1, 2018 50 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE EDC SHEET 1 OF 3 ECONOMIC DEVELOPMENT CREDIT AVAILABILITY: To all qualifying commercial or industrial customers within the Rochester Public Utilities (RPU) Service Territory. APPLICABILITY: Customers taking service under schedules MGS, MGS-HEF, MGS-TOU, LGS, or LIS that meet the following criteria may be eligible for an economic development energy credit:  New commercial or industrial customers with a load of 250 kW or greater  Existing commercial or industrial customers with at least twelve months of billing history adding new incremental connected load of 250 kW or greater.  Existing commercial or industrial customers in economic distress that have legitimate opportunities to move operations out of RPU’s service territory with a total load across all facilities located within the RPU service territory of 1,000 kW QUALIFICATIONS:  The customer must have received no less than $25,000 in local, county, State of Minnesota and/or federal financial assistance for economic development or economic stimulus. o A list of qualifying economic development programs is shown in Appendix A.  For load retention, the customer must have received $50,000 in local, county, State of Minnesota and/or federal financial assistance for economic development assistance within the 24 months prior to applying for this rate. o A list of qualifying economic development programs is shown in Appendix A.  The customer must sign an affidavit attesting to the fact that “but for” the rate credits, either on their own or in combination with a package of economic development or job creation incentives from local, county, State of Minnesota, and/or federal programs the customer would not have located operations, added load or would have significantly reduced its energy consumption or shut down its facilities in the RPU service territory. o Customer Affidavit for Economic Development Credit is shown in Appendix B.  The customer must meet all conditions set forth by the City of Rochester for economic development assistance.  No credit is available to customers or potential commercial or industrial customers transferring load from a city that is a current member of the Southern Minnesota Municipal Power Agency.  The customer must meet with RPU and review the energy efficiency program opportunities available prior to approval of the application for the credit. QUALIFYING LOAD:  New Load o All electric load from the customer’s new facilities served by RPU qualifies as new load. o If a qualifying customer falls below the designated demand and/or energy consumption level, the customer will no longer qualify for any further credits within the five-year term. 51 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE EDC SHEET 2 OF 3 QUALIFYING LOAD (continued)  Incremental Load o For incremental load, the base level of load is the customer’s peak demand and energy consumption for the twelve months prior to adding the new load.  If the customer’s energy consumption for a month in the current year exceeds the customer’s energy consumption for the same month of the base year, the additional kilowatt-hours are incremental load that qualifies for the credit.  The customer need not have incremental energy use every month of the year, but at the end of each 12-month period the customer’s entire twelve month energy use must exceed the base level and the customer must meet the minimum incremental peak demand requirements in at least one hour of the first twelve month period. o If a qualifying customer falls below the designated demand and/or energy consumption level, the customer will no longer qualify for any further credits within the five-year term.  Load Retention o RPU will designate how much load qualifies for the credit based on the facts and circumstances related to the customer. o If a qualifying customer falls below the designated demand and/or energy consumption level, the customer will no longer qualify for any further credits within the five-year term. APPLICATION AND APPROVAL:  Customers must complete an Application for Economic Development Credit and provide all required information. o A sample application is shown in Appendix C.  RPU’s acceptance or rejection of an application for the Economic Development will come after SMMPA Board approval. CREDITS:  The credit will apply to all qualifying new, incremental or retained load taken under applicable rate schedules. The Economic Development Rate Credit for customers beginning participation on or after March 1, 2021, shall be applied to the energy charge at a rate of: o 40% of all qualifying energy charges in year one o 20% of all qualifying energy charges in year two o 10% of all qualifying energy charges in year three o 5% of all qualifying energy charges in year four o 2.5% of all qualifying energy charges in year five o No credit beginning in year six  The credit levels listed above will be in effect for the full five-year term for customers commencing participation on or before March 1, 2021.  Credits will be calculated and applied based on energy consumption in the current billing month. MONTHLY FIXED CHARGE: A fixed charge of $185.00 per month will be applied during the term of this rate to cover on-going administrative costs. The monthly fixed charge is subject to change annually based on RPU labor rate changes approved during the annual budget process. 52 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE EDC SHEET 3 OF 3 TERM: Qualifying customers will be eligible for Economic Development Credits for a five-year period  For new customers, the credits will begin on the first day of the first full month after a participating new customer begins taking service and meets the demand requirements.  For incremental load, the credits will begin on the first day of the first full month after the equipment driving incremental load is installed and meets the minimum incremental demand requirements.  For retained load, the credits will begin on the date specified by RPU. METERING: RPU reserves the right to impose a one-time charge on participating commercial or industrial customers for any new and/or additional metering infrastructure required to measure qualifying load and energy. Approved by Rochester Public Utility Board: January 26, 2021 Effective Date: March 1, 2021 53 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE EDC APPENDIX A SHEET 1 OF 2 Appendix A - Qualifying Economic Development Programs: STATE OF MINNESOTA PROGRAMS BUSINESS DEVELOPMENT Export and Trade Counseling and Assistance Location and Expansion Assistance Made in Minnesota Directory Minnesota Business First Stop Minnesota Marketing Partnership Small Business Assistance Small Business Development Centers BUSINESS FINANCING Angel Loan Fund Program Emerging Entrepreneurs Loan Program Indian Business Loan Program Innovation Voucher Program Minnesota Investment Fund Minnesota Job Creation Fund Minnesota Minerals 21st Century Fund Minnesota Reservist and Veteran Business Loan Program STEP Grant Program: Export Assistance Tourism Business Septic Tank Replacement TAX CREDITS + BENEFITS Border Cities Enterprise Zone Program Data Centers Foreign Trade Zones (FTZs) Greater Minnesota Job Expansion Program Research and Development Tax Credit Single Sales Factor Apportionment; Throwback; Greater Minnesota Internship Tax Credit Program Tax Increment Financing; Tax Abatement; Personal Property Exemption; Capital Equipment Exemption COMMUNITY FINANCING Border-to-Border Broadband Development Grant Program Cleanup Revolving Loan Program Contamination Cleanup and Investigation Grant Program Demolition Loan Program Greater Minnesota Business Development Infrastructure Grant Program Redevelopment Grant Program Shovel-Ready Site Certification Small Cities Development Program Transportation Economic Development Infrastructure Program (TEDI) TRAINING Dual Training Competency Grants Export and Trade Classes and Training Job Training Incentive Program Minnesota Job Skills Partnership Minnesota WorkForce Centers SciTechsperience Internship Program 54 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE EDC APPENDIX A SHEET 2 OF 2 LOCAL OR COUNTY PROGRAMS Financial assistance from a local Revolving Loan Fund Establishment of or location in a Tax Increment Financing District Direct loan from a unit of local government Construction of public facilities – roads, sewer, water – to serve a project Site acquisition and clearance Building renovation assistance FEDERAL PROGRAMS Loan Guarantees Grants Investment Tax Credits Income Tax Credits tied to New Hiring Low-Interest Loans Other, subject to RPU Approval 55 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE EDC APPENDIX B SHEET 1 OF 1 Appendix B – Customer Affidavit for Economic Development Credit: AFFIDAVIT STATE OF MINNESOTA ) COUNTY OF ) ss COMES NOW being first duly sworn, under oath, and states that the following information is within personal knowledge and belief: is a commercial or industrial customer (Customer) of a Southern Minnesota Municipal Power Agency (SMMPA) member utility who is locating, adding, or retains load in the service territory of Rochester Public Utilities (RPU) hereby certifies and declares under penalty of perjury under the laws of the State of Minnesota that the statements in the following paragraphs are true and correct. 1. But for receipt of the economic development credit, either on its own, or in combination with Qualifying Economic Development Program as defined in Appendix A of SMMPA’s Economic Development Credit program, the Customer’s load would not have been located, added, or retained within RPU’s service territory. 2. The new, incremental or retained load represents kilowatt-hours (kWh) that either (i) do not already exist in any SMMPA member utilities’ service territory, or (ii) the Customer would be significantly reducing its energy consumption or shutting down its facilities in RPU’s service territory. 3. The Customer has discussed with RPU cost-effective energy efficiency and load management measures the Customer may take to reduce their electric bills and the load they place on SMMPA and the RPU system. Customer Name Name of Authorized Representative Signature SUBSCRIBED AND SWORN TO before me this day of , 20 , by . NOTARY PUBLIC FOR MINNESOTA My Commission Expires: 56 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE EDC APPENDIX C SHEET 57 OF 2 Appendix C – Application for Economic Development Credit Commercial or Industrial Customer Information Customer Name: Customer Street Address: Customer City, State, ZIP Please attach Customer Affidavit for Economic Development Credit. Have you discussed energy efficiency and load management programs with Rochester Public Utilities (RPU)? YES NO New Load Estimated demand (kW): Estimated annual energy (kWh): Estimated in-service date: Estimated full load date: Projected load factor: Please attach a summary description of your business. Incremental Load Prior year’s demand (kW): Estimated additional demand (kW): Prior year annual energy (kWh): Estimated additional energy (kWh): Estimated in-service date: Estimated full load date: Projected load factor: Please attach a summary description of your business and what is causing the additional load. 57 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… RATE SCHEDULE EDC APPENDIX C SHEET 2 OF 2 Load Retention Prior year’s demand (kW): Estimated demand reduction (kW): Prior year’s annual energy (kWh): Estimated energy reduction (kWh): Estimated effective date: Projected load factor: Please attach a summary description of your business and what is causing your business to potentially leave the RPU service territory. Customer Name Name of Authorized Representative Signature Date: ********************************************************************************* Rochester Public Utilities Approval This application for the Economic Development Credit is: Approved Denied If denied, reason for denial: By: Name Title Signature Date 58 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE MISCELLANEOUS FEES SHEET 1 OF 2 MISCELLANEOUS FEES – ELECTRIC UTILITY Applicable to All Charges and Amounts Due on RPU Invoices Not Sufficient Funds (NSF) Check ......................................................... $ 30.00 Copies Black & white, single side, per page ..................................................... $ 0.25 Black & white, duplex, per page .......................................................... $ 0.50 Color, single side, per page (from color printer, not copier) ..................... $ 0.35 House Move Investigation ....................................................................... $ 350.00 Infraview Service (Per Hour) ................................................................... $ 115.00 Meter Connections After Hours: Workdays, 5:00 PM - 9:00 PM ....................................................... $ 75.00 Workdays, 9:00 PM – 8:00 AM ...................................................... $ 160.00 Non-Workdays ........................................................................... $ 160.00 Holidays .................................................................................... $ 160.00 Meter Tampering ................................................................................... $ 240.00 Meter Service Call .................................................................................. $ 70.00 Meter Test – Residential (2 nd request within the past 12 months) .................. $ 100.00 Meter Test – Commercial (2 nd request within the past 12 months) ................. $ 210.00 Non-Pay Disconnection/Reconnection (Workdays, 8:00 AM- 5:00PM) .............. $ 70.00 (Additional reconnection fees apply for after hours reconnections) Optional Non-AMR Meters Change Out Fee (Electric) .................................................................... $ 200.00 Monthly Fee (Per Premise) ................................................................... $ 55.00 Outage Call (The problem is with the customer’s equipment, and this is the second request within the past twelve months.) ................ $ 100.00 Pole Disconnection/Reconnection (Commercial) .......................................... $ 295.00 Temporary Meter Installation Fee (Residential) ........................................... $ 100.00 Temporary Meter Installation Fee (Commercial) .......................................... $ 760.00 Interconnection Fees Application Fees: Process Track Simplified ....................................................................................... $ 100.00 Fast Track Certified System................................................................ $ 100.00 + $1.00/KW Fast Track Non-Certified System ......................................................... $ 100.00 + $2.00/KW Pre-Application Report ............................................................................ $ 300.00 Study Down Payment (Additional fees may apply) ....................................... $ 1,000.00 + $2.00/KW Testing Certified System: 40 kW or less .................................................................................. No Fee 40kW to 1MW ..................................................................................... $ 300.00 Greater than 1MW ............................................................................ Actual Cost Metering Fee Net Metered Under 40 kW .................................................................. No Fee Not Net Metered ............................................................................... Actual Cost 59 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Continued… MISCELLANEOUS FEES SHEET 2 OF 2 Pole Attachment Fees Administrative Fee (For new Joint Use Agreements) .............................$ 10,000.00 Permit Review (For all new attachments up to 200 poles) ......................$ 200.00 + $50.00/Pole Annual Attachment Fee......................................................................$ 23.76/Pole Unauthorized Attachment ......................................................................................... 3x Annual Attachment Fee Failure to Timely Transfer, Abandon, or Remove Facilities ......................$ 5.00/Pole per day (Fee starts day following deadline in written notice) Approved by Rochester Public Utility Board: November 12, 2019 Effective Date: January 1, 2020 60 2022 RATE SCHEDULE ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE WTR-C SHEET 1 OF 1 WATER SERVICE AVAILABILITY: At all locations within the Rochester City limits and at locations external to the City limits, that have been authorized by the Rochester Common Council. MONTHLY RATE: Customer Charge: Size of Meter Amount 5/8” ............................$ 8.23 $ 8.80 3/4" ............................$ 11.70 $ 12.27 1" ................................$ 18.81 $ 19.38 1-1/2" .........................$ 36.28 $ 36.85 2" ................................$ 57.28 $ 57.85 3" ................................$ 106.56 $ 107.13 4" ................................$ 176.80 $ 177.37 6" ................................$ 352.80 $ 353.37 8" ................................$ 630.20 $ 630.77 Commodity Charge Rate/CCF: Residential 0 - 7 CCF .......................... 89.2¢ 7.01 - 12 CCF .................... 97.1¢ 12.01 and over CCF .......... 110.2¢ Commercial ............................................ 89.2¢ Industrial ............................................... 89.2¢ Interdepartmental ................................... 89.2¢ Irrigation Meter (All Classes) ................... 110.2¢ NOTE: Customers whose service is taken outside the Rochester city limits with individual water systems not connected to the City water system shall have a rate of 2.0 times the customer and commodity charges. MINIMUM BILL: Applicable monthly customer charge according to size of meter provided. PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. Service furnished under this rate schedule is subject to connection policies of the Rochester City Council. 2. Service furnished under this rate schedule is subject to provisions of RPU's Water Service Rules and Regulations. 3. RPU shall not be liable for damage or loss sustained by customer in conjunction with taking service under this rate. 4. Water furnished under this rate shall not be resold. 5. This tariff assumes use of metering technology capable of being read using automated equipment. Customers choosing the option to have a meter that is not capable of being read using automated equipment, thus requiring a manual reading, are subject to a monthly surcharge. Additional one-time meter change-out fees also apply. (See the RPU Miscellaneous Fee Schedule for the amount of the monthly surcharge and the one-time meter change-out fees). Approved by Rochester Public Utility Board: November 12, 2019 October 26, 2021 Effective Date: January 1, 2020, 2022 61 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE Miscellaneous Fees Service Assured SHEET 1 OF 1 SERVICE ASSURED AVAILABILITY: Coverage is available to RPU residential water customers living in single- family homes, single- owner duplexes, and some townhome associations, individual twinhomes, and triplexes where each has its own service line. Water Service Assured will be applied to all Water Service customers effective January 1, 2022. Customers wishing to not receive Service Assured protection may opt out by calling the RPU Service Center to request removal from the program. Customers may request to have their electric service protected under the Electric Service Assured program without the Water Service Assured program, or in combination with the Water Service Assured program. CONDITIONS OF SERVICE: Conditions of Service will be governed by the Service Assured Terms and Conditions Agreement. MONTHLY RATE: Customer Charge: Amount Water ..........................$ 1.99 Electric ........................$ 1.99 Water and Electric .........$ 3.00 PAYMENT: Payments are due on or before the due date. Approved by Rochester Public Utility Board: October 26, 2021 Effective Date: January 1, 2022 62 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE RATE SCHEDULE FHFC SHEET 1 OF 1 FIRE HYDRANT FACILITIES CHARGE APPLICABILITY: To all residential and commercial and industrial water utility customers. MONTHLY RATE: Customer Class Residential $ .98 Commercial/Industrial $ 4.04 BILLINGS: Billings will be on a monthly basis. PAYMENT: Payments are due on or before the due date. CONDITIONS OF DELIVERY: 1. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions, deficiencies, or imperfections of service provided under this rate. 2. The rate will not be applied to water service meters that are used exclusively for irrigation purposes. 3. The rate will not be applied to water service meters that are not connected to the City’s central water system. 4. The rate will be applied regardless of the property’s water service status (active or non- active). Approved by Rochester Public Utility Board: November 20, 2018 Effective Date: January 1, 2019 63 ROCHESTER PUBLIC UTILITIES RATE SCHEDULE MISCELLANEOUS FEES SHEET 1 OF 1 MISCELLANEOUS FEES – WATER UTILITY Applicable to All Charges and Amounts Due on RPU Invoices Not Sufficient Funds (NSF) Check ........................................................ $ 30.00 Curb Box Operation ............................................................................... $ 50.00 Frozen Meter Repair ............................................................................... $ 90.00 Frozen Pipes (Per Hour Labor).................................................................. $ 85.00 Meter Installation Fee ................................................................................ $ 50.00 Removal Fee ................................................................................... $ 50.00 Optional Non-AMR Meter Change Out Fee (Water) ...................................................................... $ 80.00 Monthly Fee (Per Premise).................................................................... $ 55.00 Hydrant Meter Rental Flat Fee for Installation and Retrieval (Plus Tax) .................................... $ 120.00 Addition for 1” Meter ....................................................................................................... $ 40.00 Addition for 2-3” Meter................................................................................................... $ 80.00 State Mandated Water Charge ................................................................. $ 0.81 Tower Access (After Hours) ..................................................................... $ 130.00 Unauthorized Use – Valve or Hydrant (Per Occurrence) ................................ $ 500.00 Water Leak Detection 1 person ......................................................................................... $ 170.00 2 people ......................................................................................... $ 320.00 Water Main Tapping Fees 3/4” .................................................................................................. $ 225.00 1” ................................................................................................... $ 225.00 4” ................................................................................................... $ 760.00 6” ................................................................................................... $ 760.00 8” ................................................................................................... $ 760.00 10” ................................................................................................... $ 760.00 12” ................................................................................................... $ 760.00 Approved by Rochester Public Utility Board: November 20, 2018 Effective Date: January 1, 2019 65 Client: ROCHESTER PUBLIC UTILITIES 410854 2906462 Account # Ad # (507) 280-1613 Phone: Fax: 4000 EAST RIVER ROAD NE Address: ROCHESTER, MN 55906 Sales Rep.: 0135 Forum Legal AdTaker (701) 241-5504 Phone: (701) 241-5540 Fax: legals@forumcomm.com Email: 9960 MN LEGALS Class.: Requested By: 10/02/2021 Start Date: End 10/02/2021 Date: Nb. of 1 Inserts: 3 col. x 97.00 7 PT LINES Dimensions: Post Bulletin - Rochester Publications: $468.51 Total Price: $0.00 Paid Amount: $468.51 Balance: Page 1 of 3 On September 28 2021, the RPU Utility Board directed staff to give public notice of the proposed increase to general electric rates and general water rates for 2022 by 1.5% (2.5% for residential electric customers) and 2.5% respectively and the application of service assured to all residential water customers ($1.99 per month) in the paper of record. Changes in the electric rates will result in an average monthly increase of $2.28 for the average residential customer. Changes in the water rates will result in an increase of $0.57 for the average residential water customer. The table below includes the actual changes by rate class. The proposed rates will also be available on the RPU website (www.rpu.org) and by calling RPU customer service (507.280.1500). Public comment on the proposed rates will be taken at the October 26, 2021 RPU Board Meetings prior to the Board voting on the proposed budget and rate increase. If approved, the Board will recommend approval by the City Council which is currently scheduled on December 6, 2021. Please contact Tony Benson at 507-280-1534 or email at tbenson@rpu.org. Proposed 2022 Electric Rate Tariff changes 2021 2022 Residential Rate RES Customer Charge $ 18.30 $ 19.40 Non Summer Energy (KWH) $ 0.10726 $ 0.10890 Summer Energy (KWH) $ 0.12812 $ 0.13008 Residential Dual Fuel Rate RES-DF Customer Charge $ 18.30 $ 19.40 Energy Charge (KWH) $ 0.08005 $ 0.08128 Residential High Efficiency HVAC Rate RESELGEO Customer Charge $ 18.30 $ 19.40 Non Summer Energy first 600 KWH $ 0.10726 $ 0.10890 Non Summer Energy over 600 KWH $ 0.08988 $ 0.09126 Summer Energy (KWH) $ 0.12812 $ 0.13008 Residential Time of Use RES-TOU Customer Charge $ 18.30 $ 19.40 Non-Summer Energy $ 0.1391 $ 0.14123 Super Peak / KWH On-peak / KWH $ 0.1391 $ 0.14123 Off-peak / KWH $ 0.0705 $ 0.07158 Summer Energy $ 0.28800 $ 0.29241 Super-peak / KWH On-peak / KWH $ 0.17130 $ 0.17392 Off-peak / KWH $ 0.07050 $ 0.07158 Small General Service SGS Customer Charge $ 41.00 $ 38.00 Non-Summer Energy Charge / KWH $ 0.10343 $ 0.10507 Summer Energy Charge / KWH $ 0.13312 $ 0.13523 Small General Service High Efficiency Customer Charge $ 41.00 $ 38.00 HVAC GSHEF Non-Summer Energy Charge/ KWH $ 0.08628 $ 0.08766 Summer Energy Charge / KWH $ 0.13312 $ 0.13525 Small General Service Time of Use Customer Charge $ 41.00 $ 38.00 SGS-TOU Non-Summer Energy On-peak / KWH $ 0.17921 $ 0.18208 Off-peak / KWH $ 0.06153 $ 0.06251 Summer Energy / KWH On-peak / KWH $ 0.22367 $ 0.22725 Off-peak / KWH $ 0.06521 $ 0.06625 Medium General Services MGS Non Summer Demand Charge / KW $ 17.83 $17.83 Non-Summer Energy Charge / KWH $ 0.05650 $ 0.05760 Summer Demand Charge /KW $24.06 $24.06 Summer Energy Charge /KWH $ 0.05650 $ 0.05760 Medium General Services High Efficiency MGS-HEF Non-Summer Demand Charge / KW $ 16.50 $ 16.50 Non-Summer Energy Charge / KWH $ 0.04724 $ 0.04816 Summer Demand Charge / KW $ 20.64 $ 20.64 Summer Energy Charge / KWH $ 0.05881 $ 0.05996 Medium General Service Time of Use MGS-TOU Non-Summer On-peak Demand / KW $ 17.83 $ 17.83 Non-Summer Off-peak Demand / KW $ 1.933 $ 1.933 Non-Summer Energy Charge / KWH $ 0.05724 $ 0.05947 Summer On-peak demand / KW $ 24.06 $ 24.06 Summer Off-peak demand / KW $ 1.933 $ 1.933 Summer Energy Charge / KWH $ 0.05724 $ 0.05947 Large General Service LGS Demand Charge / KW $ 20.00 $ 21.00 Energy Charge / KWH $ 0.05867 $ 0.05760 Large Industrial LIS Demand Charge / KW $ 20.50 $ 20.50 Energy charge / KWH $ 0.05240 $ 0.05340 Effective January 2023 all Small General Service rates will be available for loads less than 25 KW, Medium General Service rates will be available for loads over 25KW and less than 1,000 KW. Proposed 2022 Water Rate Tariff2.5% Rate Increase: Meter Charge 2021 2022 5/8" $ 8.23 $ 8.80 3/4" $ 11.70 $12.27 1" $18.81 $19.38 1-1/2" $36.28 $36.85 2" $57.28 $57.85 3" $106.56 $107.13 4" $176.80 $177.37 6" $352.80 $353.37 8" $630.20 $630.77