Loading...
HomeMy WebLinkAboutResolution No. 167-13I • RESOLUTION WHEREAS, Minnesota Teen Challenge requested an amendment to the Planned Unit Development for Samaritan Bethany (#R2013 001 PUD) to change the use of the former Samaritan Bethany nursing home to a drug rehabilitation center. The property is described as Lot 1, Block 1,�Samaritan Bethany Subdivision, Olmsted County, Minnesota, and is located at 1530 Assisi Drive N.W., Rochester, Minnesota; and, WHEREAS, the City Planning and Zoning Commission, at its March 13, 2013, meeting reviewed the proposed amendment in light of the criteria provided by section 62.708 of the Rochester Code of Ordinances and made the following findings of fact: 62.708 Criteria for Type III Developments: In determining whether to approve, deny, or approve with conditions an application, the Commission and Council shall be guided by the following criteria: 1) Preliminary Development Plan Criteria: a) Capacity of Public Facilities: The existing or future planned utilities in the area are adequate to serve the proposed development. City sewer and water, and other utilities already serve the site. The existing utilities appear adequate to the serve the proposed use of the building. b) Geologic Hazards: The existence of areas of natural or geologic hazard, such as unstable slopes, sinkholes, floodplain, etc., have been identified and the development of these areas has been taken into account or will be addressed in the Phase II plans. The site is already development and the only change of use occurring on the property is the change of use of the existing building. The site is not known to contain any of the listed geologic hazards. c) Natural Features: For developments involving new construction, the arrangement of buildings, paved areas and open space has, to the extent practical, utilized the existing topography and existing desirable vegetation of the s'te. The proposed amendment to the PUD doesn't involve new construction. The only change occurring on the property is the change of use of the existing building from a nursing care facility to a drug rehabilitation center. d) Residential Traffic Impac the proposed development: When located in a residential area, • 1) Will not cause traffic volumes to exceed planned capacities on local residential streets; 2) Will not generate frequent truck traffic on local residential streets; 3) Will not create additional traffic during evening and nighttime hours on local residential streets; a) The proposed amendment will not cause traffic volumes to exceed planned capacities on local residential streets as access isn't from a local residential street. Access to the property is from Assisi Drive INW which is designated as a Major Urban Arterial on the Functional Designation Map of the ROCOG 2040 Transportation Plan. e) Traffic Generation Impact: Anticipated traffic generated by the development will not cause the capacity of adjacent streets to be exceeded, and conceptual improvements to reduce the impact of access points on the traffic flow of adjacent streets have been identified where needed. Anticipated traffic generated by the development will not cause the capacity of adjacent streets to be exceeded, and conceptual improyements to reduce the impact of access points .on the traffic flow of adjacent streets have been identified where needed. The anticipated traffic generated by the development will not cause the capacity of the adjacent streets to be exceeded. Access to the property is from Assisi Drive NW which is designated as a Major Urban Arterial on the Functional Designation Map of the ROCOG 2040 Transportation Plan. f) Height Impacts: For developments involving new construction, the heights and placement of proposed structures are compatible with the surrounding development. Factors to consider include: 1) Will the structure block sunlight from reaching adjacent properties during a majority of the day for over four (4) months out of the year; 2) Will siting of the structure substantially block vistas from the primary exposures of adjacent residential dwellings created due to differences in! elevation. The proposed amendment to the PUD doesn't involve new construction. The only change occurring on the • property is the change of use of the existing building to a drug rehabilitation center. g) Setbacks: For developments involving new construction, proposed setbacks are related to building height and bulk in a manner consistent with that required for permitted uses in the underlying zoning district. The proposed amendment to the PUD doesn't involve new construction. The only change occurring on the property is the change of use of the existing building to a drug rehabilitation center. h) Internal Site Design: For developments involving new construction, the preliminary site layout indicates adequate building separation and desirable orientation of the buildings to open spaces, street frontages or other focal points. The proposed amendment to the PUD doesn't involve new construction. The only change occurring on the property is the change of use of the existing building to a drug habilitation center. i) Screening and Buffering: The conceptual screening and bufferyards proposed area adequate to protect the privacy of residents in the development or surrounding residential areas from • the impact of interior traffic circulation and parking areas, utility areas such as refuse storage, noise or glare exceeding permissible standards, potential safety hazards, unwanted pedestrian/bicycle access, or to subdue differences in architecture and bulk between adjacent land uses. The existing building is screened from the adjacent residential properties to the north by the existing vegetation along the property boundary. j) Ordinance Requirements: The proposed development includes adequate amounts of off-street parking and loading areas and, in the case of new construction, there is adequate landscaped area to meet ordinance requirements. The existing off-street parking provides adequate parking for the intended change of use of the property. k) General Compatibility: The relationship of the actual appearance, general density and overall site design of the proposed development should be compared to the established pattern of zoning, the character of the surrounding neighborhood and the existing land forrrls of the area to determine the general compatibility of the development with its surroundings. Overall the appearance and site design of the property will not be • changing just the use of the property from a nursing care 3 • facility to a drug rehabilitation center. The intended use of the property would appear toy be compatible with the surrounding uses as the low density residential uses are to the north which is buffered by the existing vegetation along the north property boundary. The site has an abundant amount of open space for the clients. Non -Vehicular and Alternate Modes of Travel: The proposed development incorporates pedestrian oriented -space, provides direct and convenient pede trian access to the building entrance(s) from public trails, public sidewalks, and on or off -site parking areas, incorporates appropriated pedestrian safety features, provides convenient pedestrian access for transit patrons, or, if appropriate, access for transit vehicles, and provides adequate bicycle access. Consideration shall also be given, to providing designated motorized scooter parking if appropriate to the context of the development (the use, location, type of individuals served). Existing sidewalks lead from the parking areas to the building entrance to provide clients and visits convenient pedestrian access to the building entrances; and, WHEREAS, the Commission recommended approval of the proposed amendment of the • PUD subject to the following conditions: The applicant shall obtain a lice se from Olmsted County Public Health Services as a Board and Lodging�facility prior to occupying the building. 2. The applicant shall obtain the necessary building permits from the Rochester Building Safety Department for the change of use and any construction work necessary to change the use of the building from the nursing care facility to a licensed treatment center. 3. The applicant shall provide a opy of the licenses to the Planning Department from the Minnesota Department of Human Services for the programs at the facility; and, WHEREAS, the Common Council, at its April 1, 2013, meeting, considered the matter and otherwise concurred with the Commissio 's findings and recommendation, and adopted them as its own. e NOW, THEREFORE, BE IT RESOLVED by Common Council of the City of Rochester that applicant's proposed amendment to the Samaritan Bethany Planned Unit Development (#R2013-001 PUD) to change the use of the former Samaritan Bethany nursing home to a drug rehabilitation center is in all things approved subject to the above three conditions. 4 • PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF , ROCHESTER, MINNESOTA, THIS SST DAYXF , 2013. CTING PRE815E-VT OF SAID OMMON,C6UNCIL ATTEST: CI CLERK APPROVED THIS Z^-) I DAY OF , 2013. (Seal of the City of Rochester, Minnesota) Zone10\PUD.amendSamBeth01 • 0 ., .7 MAYOR OF SAID CITY 0