Loading...
HomeMy WebLinkAboutResolution No. 064-23 - Resolution - Establishing Sidewalk Improvement District SE-4 and Rates to be Collected from 2024 to 2028 RESOLUTION Awarding Contract for 2023 Sidewalk and Pedestrian Ramp Improvements SE District 4-1 - Project No. J4725, establishing Sidewalk Improvement District SE-4, and establishing rates to be collected from 2024 to 2028. WHEREAS, The City Council adopted the Sidewalk Improvement District Program for the annual repair and replacement of City sidewalks on November 14, 2022; and WHEREAS, pursuant to an advertisement for bids for the following improvement(s): 2023 Sidewalk and Pedestrian Ramp Improvements SE District 4-1 - Project No. J4725, the following bids were received complying with the advertisement: Ti-Zack Concrete, Inc. $1,743,489.32 Doyle Conner Co $2,126,325.30 Legends Concrete, Inc $2,291,800.00; and WHEREAS, it appears that Ti-Zack Concrete, Inc. is the lowest responsive and responsible bidder; and WHEREAS, implementation of the program requires establishment of the Districts contributing to annual repair and replacement of City sidewalks; and WHEREAS, implementation of the program also requires establishment of the Project Areas within Districts where annual repair and replacement of City sidewalks will be focused; and WHEREAS, implementation of the program also requires establishment of the rates assessed to parcels within each District. NOW, THEREFORE, BE IT RESOLVED, by the Common Council of the City of Rochester that the bid of $1,743,489.32 is hereby accepted and execution of the standard City contract for construction with Ti-Zack Concrete, Inc., is authorized for the following approved local improvements: 2023 Sidewalk and Pedestrian Ramp Improvements SE District 4-1 - Project No. J4725; and BE IT FURTHER RESOLVED that the City Clerk is directed to return to all bidders the deposits made with their bids, except the deposits of the successful bidder and the next lowest bidder, which shall be retained until the contract has been executed; and BE IT FURTHER RESOLVED that the bidder shall execute all contracts within ten days after the contract is ready for their signature, and if not executed by them in said time, they shall be deemed to have abandoned the same; and BE IT FURTHER RESOLVED that Sidewalk Improvement District SE-4, shown in the attached figure and generally described as: Parcels within City limits starting at the northeast corner of Mayo Field, following the CP Railroad east to City Limits, then following City Limits south and west to Hwy 63, then following Hwy 63 north to Hwy 52, then continuing on Broadway Ave north to 9 ST SE, then east on 9 ST SE and following the Destination Medical Center boundary north and east back to the northeast corner of Mayo Field is established for sidewalk replacements and repairs to be completed in 2023 and assessed to participating parcels in the District from 2024 to 2028. BE IT FURTHER RESOLVED that Project Area SE 4-1, shown in the attached figure and generally described as: Parcels within City limits starting at the northeast corner of Mayo Field, following the CP Railroad east to 11 AVE NE, then following 11 AVE south to 4 ST SE, then following 4 ST SE east to 13 AVE SE, then following 13 AVE SE south to 15 AVE SE, then southeast on 15 AVE SE to Hwy 14, then west on Hwy 14 to Broadway Ave, then north on Broadway Ave to 9 ST SE, then east on 9 ST SE and following the Destination Medical Center boundary north and east back to the northeast corner of Mayo Field is established as the project are for sidewalk replacements and repairs for the 2023 construction season. BE IT FURTHER RESOLVED that the following Olmsted County Land Used Codes will be included in a Sidewalk Improvement District Category named “Local Public”: Parkland Retention Pond/Drain Flood Control Golf Course Public Municipal Public County Public School BE IT FURTHER RESOLVED that participating parcels in District SE-4 will be assessed at the following annual rates from 2024 to 2028: Residential (without sidewalk) $25.26 Local Public (without sidewalk) $25.26 Residential $48.52 Local Public $48.52 Non-Residential (without sidewalk) $141.56 Non-Residential $281.11 Non-Participating $0.00 PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF ROCHESTER, MINNESOTA, THIS __________ DAY OF _______________, 2023. ___________________________________ PRESIDENT OF SAID COMMON COUNCIL ATTEST: __________________________ CITY CLERK APPROVED THIS _____ DAY OF ______________________, 2023. ___________________________________ MAYOR OF SAID CITY (Seal of the City of Rochester, Minnesota)