Loading...
HomeMy WebLinkAboutResolution No. 030-04� h3D-04 4 5'TY I • RESOLUTION WHEREAS, Carpenter & Torgerson Il, LLC, applied for a Type III, Phase II, Restricted Development/incentive Development Preliminary Plan #03-50 for the development of a 120- room, five story hotel at the corner of Second Street S.W., and 13th Avenue S.W. The property is located along the north side of Second Street S.W., along the west side of 13th Avenue S.W., and along the south side of First Street S.W.; and, WHEREAS, R.C.O. § 62.708 (Criteria for Type III Developments) provides the relevant criteria for the review of the restricted development portion of this application; and, WHEREAS, R.C.O. § 62.630 provides the relevant criteria for the review of the incentive development portion of this application; and, WHEREAS, on December 10, 2003, the Rochester Planning and Zoning Commission held a public hearing on said restricted development preliminary plan, reviewed the app licat according to the requirements of R.C.O. §62.708 and made the following Findings of Fact: (A) Capacity of Public Facilities: The existing or future planned utilities in the area are adequate to serve the proposed development. The owner • will be responsible for all cost associated with any relocation of utilities for this development. If additional on-site fire hydrants are required, the applicant will need to enter into a City-Owner contract for the installation of the public water main and the water main must be located within a 20' minimum public utility easement. (g) Geologic Hazards: There are no known geologic hazards upon the site under consideration for this development. C) Natural Features: The proposed development, to thf the extent practical, ( will utilize the existing topography and natural features o (D) Residential Traffic Impact: a) The traffic being generated from e should not cause bapac handled of on the existing street system and ho adjacent street to be exceeded. The site plan, as presently designed, accommodates the traffic generated by the use to use 13th Avenue. Access into the parking area will be off of the alley. b) This proposal will not Deliveries to the hotel will be accommodated generate frequent truck af residential streets. Deli from the alley. • 1 • c) This development should not create additional traffic during evening and nighttime hours on local residential streets. (E) Traffic Generation Impact: The anticipated traffic generated by the development should not cause the capacity of the adjacent streets to be exceeded. The current site plan provides for the only access to the parking area is from the alley. There will be no access permitted to 1st St. SW or 2"" St. SW. (F) Height Impacts: The proposed hotel will exceed the height limits in the B-1 and R-3 district. The allowed height is 30 feet; the proposed structure would have a maximum height of 80 feet. The average height of the building is 66' 6". This height is similar to the recently constructed Staybridge hotel to the east. The applicant has submitted a shadow study for the project. The results of the shadow study indicate the shadow affects from the project will be within the acceptable limits. (G) Setbacks: The building setback for the canopy will require a revocable permit from the City. The building setback along 1st St. SW is approximately twice of that of the recently constructed Staybridge hotel to the east. (H) Internal Site Design: The proposed development indicates adequate • orientation of the building to street frontages. The vehicle traffic will use the alley to access the parking ramp area proposed. (1) Screening and Buffering: The site plan does indicate plantings around the perimeter of the building. A heavier bufferyard is provided along the west property boundary to buffer the adjacent residential uses. The landscape does not indicate the existing boulevard trees adjacent to the site. The landscaping plan should be revised to identify these trees and the trees shall be saved unless they happen to be in the location of an access driveway approved for the development. (J) Ordinance Requirements: There are portions of the ordinance requirements that the proposed development does not meet. These relate to building height. This issue will be addressed as part of the review process for the requested variance. The signage proposed for the building exceeds what is permitted in the B-1 zoning district. The applicant has not asked for a variance to the signage but instead feels that due to the scale of the building the size of the signage is appropriate as part of the incentive development and that it is similar to what was approved for the Springhill Suites project. • 2 (K) General Compatibility: The proposed development would constitute a substantial addition to the block but would not significantly change the character of the surrounding area since this general area trends to accommodate the needs of the Saint Mary's Hospital patients and visitors. The proposal will remove a number of older buildings to accommodate this re-development of the site. This should result in improvements to the block and neighborhood once the new facility is built; and, WHEREAS, at its December 10, 2003, public hearing, the Commission reviewed the application according to the requirements of R.C.O. §62.630 and made the following Findings of Fact: 1) Preliminary Development Plan Criteria: b) Site Design Criteria. 1) Capacity of Public Facilities: The existing or future planned utilities in the area are adequate to serve the proposed development. The owner will be responsible for all cost associated with any relocation_of utilities for this development. If additional on- site fire hydrants are required, the applicant will need to enter into a City-Owner contract for the installation of the public water main and the water main must be located within a 20' minimum public utility • easement. 2) Geologic Hazards: There are no known geologic hazards upon the site under consideration for this development. 3) Natural Features: The proposed development, to the extent practical, will utilize the existing topography and natural features of the site. 4) Traffic Generation Impact: The traffic being generated from the proposed use can be handled on the existing street system and should not cause capacity of adjacent street to be exceeded. The site plan, as presently designed, accommodates the traffic generated by the use to use 13 Avenue. Access into the parking area will be off of the alley. The anticipated traffic generated by the development should not cause the capacity of the adjacent streets to be exceeded. The current site plan.provides for the only access to the parking area is from the alley. There will be no access permitted to 1st St. SW or 2nd St. SW. 5) Height Impacts: The proposed hotel will exceed the height limits in the B-1 and R-3 district. The allowed height is 30 feet; the • 3 proposed structure would have a maximum height of 80 feet. The average height of the building is 66' 6". This height is similar to the recently constructed Staybridge hotel to the east. The applicant has submitted a shadow study for the project. The results of the shadow study indicate the shadow affects from the project will be within the acceptable limits. 6) Setbacks: The building setback for the canopy will require a revocable permit from the City. The building setback along 15t St. SW it approximately twice of that of the recently constructed Staybridge hotel to the east. 7) Internal Site Design: The proposed development indicates adequate orientation of the building to street frontages. The vehicle traffic will use the alley to access the parking ramp area proposed. 8) Screening and Buffering: The site plan does indicate plantings around the perimeter of the building. A heavier bufferyard is provided along the west property boundary to buffer the adjacent residential uses. The landscape does not indicate the existing boulevard trees adjacent to the site. The landscaping plan should be revised to identify these trees and the trees shall be saved • unless they happen to by in the location of an access driveway approved for the development. The narrative report submitted with the application indicates that 33.5% of the site will be landscape area. The minimum landscape area in the B-1 district is 12%. 9) Ordinance Requirements: There are portions of the ordinance requirements that the proposed development does not meet. These relate to building height. This issue will be addressed as part of the review process for the request variance; and, WHEREAS, the Commission, based upon its Findings of Fact, recommended approval of the application based upon the following conditions: 1. The final development plan application shall include: • Building elevations that identify building materials and colors; • A landscaping/streetscape plan that identifies the planting species; and • A revised signage plan that meets the signage requirements for transient accommodations in the B-1 zoning district, unless a variance is granted. 4 2. An approved grading/drainage plan is required prior to construction. Storm water management must be provided and a fee will be applicable to all new areas of impervious surface associates with the redevelopment of this property. 3. The condition of the existing pedestrian facilities along the frontages of the property will be reviewed by Public Works staff and any needed repair work or panel replacement work shall be done by the developer at it's own expense, concurrent with redevelopment of the site. 4. All existing driveway curb-cuts that are not intended to be used for the development shall be removed and replaced with curb, gutter and boulevard at the owner's expense. 5. The signs identified as auxiliary signs shall be moved out of the traffic visibility zones. 6. The alley and driveways shall be constructed to City design standards. The alley shall be a minimum of 20 feet in width of concrete from 13th Ave. SW to the west property line. - 7. The applicant shall dedicate controlled access along the entire frontage of 2"d Street SW. • 8. The approval of this development is contingent upon the applicant receiving a Revocable Permit from the City for the construction of and proposed structures within the airspace over the existing alley and the canopy along 13th Avenue S.W. 9. The developer is responsible for all the cost associated with utility relocation to accommodate this development. All existing water services stubbed to the property must be abandoned properly at the main in the street, prior to any building excavation, per the requirements of the RPU Water Division. 10. The applicant agrees that no deviation to the appearance of the building, design, exterior facade or landscaping will occur from the plans approved by the City Council. 11. If a variance is not granted for the setback along Second Street S.W., the site shall be redesigned to meet the setback requirements along Second Street S.W.; and, 5 WHEREAS, at the January 5th Council Meeting, the Planning Department staff aecommended the addition of the following condition: 12. There shall be no parking along the south side of the alley. The area shall be posted "Loading Zone Only;" and, WHEREAS, the Common Council held a public hearing on the restricted development preliminary plan request on January 5, 2004, and permitted all interested persons to be heard; and, WHEREAS, at the public hearing, the applicant's representative.agreed with the above conditions; and, WHEREAS, the Common Council determined that the applicant satisfied the conditions of R.C.O. §62.708 by a preponderance of the evidence submitted at the public hearing subject to the 12 conditions identified above. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Rochester that the Type III, Phase II, Restricted Development and Incentive Development Preliminary Plan #03-50, requested by Carpenter &-Torgerson II, LLC, is granted subject to the above 12 conditions. PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF ROCHESTER, MINNESOTA, THIS C5th DAY OF L7eiWU 2004. PR- ESIDENT OF SAID COMMON COUNCIL ATTEST: cXrY CLERK APPROVED THIS &7-h( DAY OF 2004. MAYOR OF SAID CITY (Seal of the City of Rochester, Minnesota) Zone2000\Restl nce nDevP re.0350 6