RESOLUTION
WHEREAS, Elton Hills Plaza West LLC, applied for a Type III, Phase II, Special District
Amendment Final Site Development Plan#03-06 to allow the construction of a 6,844 square foot
building for retail uses. The property is located within the 41st Street Business Park and is zoned
SD-1 (Arboretum Special District). The property is located north of 41st Street N.W., west of 315t
Avenue N.W., and is platted as Lot 3, Block 1, 41st Street Business Park; and,
WHEREAS, R.C.O. §§61.146, 62.708 provide the criteria for the review of this request;
and,
WHEREAS, the Planning Department staff recommended the following findings of fact for
this application:
Final Development Plan Criteria:
a) Public Facility Design: An approved grading/drainage plan is
required prior to construction. Approved construction plans will be
required for any public infrastructure improvements.
b) Geologic Hazard: There are no known geologic hazards on this
• site.
c) Access Effect: This property will be served by a private road
system circulating through the Project Development Plan site,
which will access public roads at 31st Avenue. and 41st Street.
d) Pedestrian Circulation: The applicant is responsible to construct
5' wide concrete sidewalk along the entire frontage of 31St Avenue.
N.W., concurrent with development of the property.
e) Foundation and Site Plantings: The Final Site Plan includes
proposed landscaping. Landscaping includes sod with trees
located along the perimeter of the site as well as internally.
f) Site Status: An approved grading/drainage plan is required prior to
construction. If extension of public utilities is proposed, approved
construction plans, easements and execution of a City-Owner
Contract will be required prior to issuance of development permits.
g) Screening and Bufferyards: The Final Site Plan includes
proposed landscaping. An open drainage channel was identified
on the Project Development Plan, through the site along with a 100'
wide open space buffer area adjacent to the existing residential
dwellings. Plantings on the berm are in place. Additional plantings
•
i
are required along the south boundary of Outlot A (location of the
• berm and drainage area).
h) Final Building Design: The shape of the building has been
modified slightly, and parking lot design was previously modified
with approval of the office building directly to the west. A shared
drive isle and parking spaces will be located between the two
buildings.
i) Internal Circulation Areas: Plans for off-street parking and
loading areas and circulation aisles appear to meet ordinance
requirements in terms of design.
j) Ordinance Requirements: It appears as though the parking lot
design may need slight adjustments to meet the minimum parking
lot facility design standards of Section 63.450.
WHEREAS, on January 14, 2004, the Rochester Planning and Zoning Commission held
a public hearing on the proposed amendment, reviewed the application according to the
requirements of the above-named ordinances, adopted the Planning Department recommended
findings of fact, and recommended approval subject to the compliance with the following
conditions:
1. Inadequate information was submitted to determine proper size of water
. service for this building. Prior to issuance of permits for construction (i.e.
footings, or full permit), construction plans must be approved and the RPU
Water shall approve water service design for this building.
2. An approved grading/drainage plan is required prior to development of the
property. A Storm Water Management fee will apply for the benefit of
participation in the City's Storm Water Management Plan (SWMP), as
specified in the Development Agreement.
3. Construction of a five-foot wide concrete sidewalk is required along the
entire frontage of 31 st Avenue, concurrent with development of this parcel.
4. A new City-Owner contract will be required prior to the construction of any
public infrastructure that was NOT included in the approved plans for the
prior City-Owner contract for basic construction in 41 st Street Business
Park.
WHEREAS, the Common Council held a public hearing on the Final Site Plan
Amendment request on February 2, 2004, and permitted all interested persons to be heard, and,
• 2
WHEREAS, following the hearing, the Council concluded that the request for Special
Wistrict Amendment Final Site Development Plan #03-06 satisfied the provisions of R.C.O. §§
61.146 and 62.708 if the applicant satisfied the above four conditions.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Rochester that the Special District Amendment Final Site Development Plan requested by D &
B, Inc., (identified in the records of the Consolidated Planning Department as Special District
Amendment Final Site Development Plan No. 03-06) is granted, subject to the above four
conditions.
PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF
ROCHESTER, MINNESOTA, THIS ZAJCl DAY OF ZE&&xdGlx�Zc1 , 2004.
y
PRESIDENT OF SAID COMMON COUNCIL
ATTEST:
ITY CLERK
APPROVED THIS DAY OF , 2004.
MAYOR OF SAID CITY
(Seal of the City of
Rochester, Minnesota)
Zone2000/FinalSitePlanSD.0306
3