HomeMy WebLinkAboutResolution No. 472-05 T
•
:saoanosaa leinjeu
aagjo pue saoanosaa coeds uado 'sa!l!l!oel ollgnd '}uawdolanap pauueld ao
6uils!xa 'sasn leuo!leaaoaa 'asn puel jo suia}}ed :ol pa}!w!l IOU Inq 6ulpnlou! `veld
anisuagaadwo:D aqj ui umogs se sasn jaq}o bulpnlou! `ajnln} aqj u! paled!o!}ue
}uawdolanap pue juawdolanap 6u!}slxe q}!m algpledwoo aq ll!M ApIjoe aql
'Aj!n!}oe uo!}eneoxa aqJ 10 uoljaldwoo 6upollol a}!s aqj jo
uoilejo}sai a}enbape jol sap!noid ueld uoljewelow aqj 'in000 o} pa}edlo!lue aae
sloa}}a gons j! ao 'je}!geq 91!lpl!M pue 91!lpl!M 'Juawuoa!nua 'sadeospuel leinjeu
aqj jo aalsagoo�l jo Al!lenb olueos aqj Joa}}e AlasJanpe IOU il!M asn pasodoid aql EI
'AI!lenb aalem
eoe}jns ao jalem punoa6 ao Al!lenb i!e joa}je A!asJanpe IOU ll!M asn pasodoid aql •Q
pale6ilp
aq ll!M s}oedwi gons ao '@I!s aqj 01 ssaooe 6uip!noid speoi ollgnd jo eoueualulew
pue Alejes aqj joedw! Alasaanpe }ou ll!M juawdlnbe AAeaq pue gong} jo asn aql •:D
'Ino pa!aaeo aae s911!n110e u011e611!w
gons jo Ile legl aoueinsse lebal alenbape pue 'uolle6!l!w gons col spun]
jo aoinos eqj `uolle6!l!w gons jo }soo eqj 'pasn aq of spoglaw uo!Ie611!w aqj •
aIejlsuou.wep 01 lueo!lddy eqj Aq pa}}!wgns si ueld pal!elap Ailnj a pue lueo!lddy
eqj Aq pa}ebilp Alalenbape aq ueo seaie le!}uap!sai pue sAennpeoi 'shied ollgnd
uo sloedwi le}uawualnua aI!s-}Jo ao -uo anissaoxa Jo/pue 'Isnp 'as!ou 'lensln •8
:sAempeoi pue sued 'seaje le!luap!sai pauueld jo 6u!ls!xa o}Al!wlxoad
(17) Jo `01}4eJl anlssaoxa (E) 'Alaadoid eqj o} ssaooe ajesun (Z) 'sadols alge}sun
ao deals (() of anp A:pedoid ao aj!l of ja6uep a u! }lnsaj IOU ll!M AI!n!;oe aql V
:s6uipu!J 6u1nnolloj aq} sa!Ssljes `uo!}!ppe w 'pue 917L•1,9
uo!loaS jo sluawailnbai eqj jo Ile sags!les }ueogdde eqj j! Aj!n!}oe uoljeneoxa ue 6u!zuoglne
I!waad asn leuo!}!puoo e anoidde }snw Al!o aq} Jegl salels 901,VZ9 § 'O'�'2� 'SdEI2iEIHM
`pue :•M•S peo�J auo}spla!d
pue '•M•S aoeld uolsaM jo uollenulluoo eqj jol smolle pue }uawdolanap wUeJ }aeH aqJ 10 you
`'M'S anuany u;g 1, ;o Isam paleool s! A:padoid aqj_ •„uoljeaajly pue j le!luelsgns„ a se sapea6 aq}
jo uo!}eog pow a gons saullap seoueu!pio ;o apoO Ja}sagoo�j aqj ;o LOl-l.•Z9 uoljaas
aaow ao jaej ual Aq sapej6 eqj jo uo!}eoq!pow eqj molle pinom }eqj 17Z-t70# leld leul j q}!m
p91eloosse sa!j!nljoe 6ulganlslp puel jo leriojdde palsenlow }uawdolanaa dJ 'SVMJ3HM
NOiimoS=i2j
77
-'
•
G. The activity will not unduly affect the use and enjoyment of adjacent properties;
H. The site plan provides for adequate buffers and screening year-round from
unsightly features of the excavation operation;
I. The reclamation plan provides for adequate and appropriate restoration and
stabilization of cut and fill areas;
J. The excavation activity will not result in negative impacts on drainage patterns or
stormwater management facilities;
K. The proposed activity will minimize impacts on sinkholes, wetlands and other
natural features affecting ground water or surface water quality;
L. The intensity and the anticipated duration of the proposed excavation activity is
appropriate for the size and location of the activity;
M. Permanent and interim erosion and sediment control plans have been approved
by the City;
N. Surety has been provided .that guarantees the site will be fully restored, after
• completion of the excavation activity, to a safe condition, and one that permits
reuse of the site in a manner compatible with the Comprehensive Plan,
neighborhood plans, the Land Use Plan and applicable City policies.
O. The proposed activity complies with the requirements of the adopted building
code; and,
WHEREAS, on September 19, 2005, the City of Rochester Common Council held a
public hearing on this Substantial Land Alteration application, reviewed the application according
to the requirements of R.C.O. § 61.146 and made the following findings:
1. Not applicable.
2. Not applicable.
3. Not applicable.
4. The Rochester Public Works Department will need to review and approve the
grading and drainage plan for this work. This plan must accommodate
permanent and interim erosion and sediment control.
5. Not applicable.
6. Not applicable.
7. Not applicable.
8. Not applicable.
•
2
•
WHEREAS, the City of Rochester Common Council also reviewed the application
according to the requirements of R.C.O. § 62.1105 and made the following findings:
1. The activity should not result in danger to life or property. The slopes on
the site will be a maximum of 3:1. The grading and drainage plans will
need to comply with City standards and be approved by the Rochester
Public Works Department.
2. The grading plan for this project needs to be approved by the Rochester
Public Works Department and it will document the extent of the work. All
cut material will be used on site. Therefore, it will not be necessary to
haul fill from the site. Noise and dust control will need to comply with City
standards.
3. The equipment conducting the grading work on the property will also be
the equipment utilized to move the earth. All excess material will be used
on the site. It will not be necessary to haul fill from the site, which will
minimize the impact on the surroundings roads.
4. The proposed excavation work should not affect air quality, the ground
water or surface water quality.
• 5. The proposed grading work should not adversely affect the scenic quality
of Rochester. There will not be any steep slopes or exposed rock faces.
The natural topography of the area is being re-graded to provide adequate
slopes for single family dwellings.
6. The result of the-- proposed activity will be compatible with existing
development and development anticipated in the future. The finished
result of the grading work will allow for development that is consistent with
the land use plan.
7. The grading will be confined to the property and should not affect the use
and enjoyment of adjacent properties. The duration of the excavation
activity is expected to be completed in approximately 12 weeks.
8. The grading will be completed within one phase taking approximately 12
weeks. There are homes in the immediate area that will be visually
affected by the grading activity but it will be for only a short period of time
during the grading process. Noise and dust control will need to comply
with City standards.
3
. 9. The grading and drainage plan will need to provide the proper restoration
and stabilization in accordance with the adopted codes for the City of
Rochester.
10. The grading and drainage plans will need to be reviewed and approved by
the City. Stormwater management will be required for the development.
11. The areas of grading do not contain sinkholes or wetlands and should not
affect the ground water or surface quality once restoration and
stabilization is completed.
12. The grading work is expected to be completed in one phase taking
approximately 12 weeks to complete. The duration seems appropriate for
this type of activity and the size of the project.
13. The Rochester Public Works Department will need to review and approve
the grading and drainage plan for this work. This plan must accommodate
permanent and interim erosion and sediment control.
14. Surety will need to be provided that guarantees the site will be fully
restored after the completion of the excavation activity. This surety can
• be provided through the owner-contract process for this development. If
grading is to occur prior to an owner-contract, a separate surety will need
to be provided.
15. The grading and drainage plan will need to be approved by the Rochester
Public Works Department prior to any grading on the property; and,
WHEREAS, the Planning and Zoning Commission recommended approval of the
substantial land alteration activity.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Rochester that, based upon the above-stated findings of fact, the Applicant has shown by a
substantial weight of the evidence submitted at the public hearing that it has satisfied the criteria
found at Sections 61.146 and 62.1105 of the Rochester Code of Ordinances.
BE IT FURTHER RESOLVED by the Common Council that the City does approve the
proposed conditional use permit authorizing the Substantial Land Alteration activity as proposed
by GP Development associated with Final Plat#04-24.
4
• PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF
ROCHESTER, MINNESOTA, THIS I q 4-h DAY OF-,S-Lpt-m�- , 2005.
RESIDENT OF SAID COMMON COUNCIL
ATTEST:
Dtput, CIGLE�y
APPROVED THIS c. DAY OF 5) D ptLYYLL,L , 2005.
MAYOR OF SAID CITY