RESOLUTION
WHEREAS, HL2, LLC, applied for a Type III, Phase II Incentive Development (#R2008-
017CUP) and Design Modification #R2008-002DM to permit the construction of a hotel at the
southeast corner of Bandel Road N.W., and 59th Street N.W. The proposed building exceeds
the allowable floor area ratio and permitted height within the B-4 zoning district; and,
WHEREAS, R.C.O. §62.630 sets forth the criteria for incentive developments; and,
WHEREAS, based upon section 62.630, the Planning and Zoning Commission
recommended the following findings of fact:
Preliminary Development Plan Criteria:
a) Suitability of the Area: The proposed use is compatible with the existing
land uses. Commercial uses exist to the west and south of the property;
while multi-family uses consist to the north and east of the property.
b) Site Design Criteria:
• 1) Capacity of Public Facilities: Utilities are available to serve the
proposed development. The static water pressure will range from
46 to 50 PSI at the main floor and 31 to 35 PSI at the top floor.
This PSI may require some type of a pressure booster system
according to the Minnesota Plumbing Code.
2) Geologic Hazards: There is no known geologic hazard for this
property.
3) Natural Features: The site changes in elevation by approximately
30 feet from the southerly end to the northerly property line. Some
substantial filling is proposed on the southerly portion of the site is
proposed.
4) Traffic Generation Impact: The anticipated amount of traffic that
will be generated by the proposal is 1,078 daily trips or 85 peak
hour trips. There is an executed Development Agreement for this
property which outlines that the owner has a future obligation to
pay Substandard Street Capacity contribution in addition to the
Substandard Street Reconstruction component that was paid as an
assessment in 2004, if a Transportation Improvement District is
• established that includes this property.
. 5) Height Impacts: This project proposes a 4-story hotel with a
• total building height of approximately 55 feet. The proposed
structure is adjacent to detached garages for a multi-family
residential building to the east. The location of the proposed
building will block views of Highway 52.
6) Setbacks: The minimum setback requirements are being met
however a "D" bufferyard is required along the east property line.
The minimum "D" bufferyard width is 10 feet wide. The location of
the building will need to be moved to the west to provide for the 10
foot wide bufferyard.
7) Internal Site Design: There appears to be adequate building
separation to open spaces and street frontages.
8) Screening and Buffering: A "D" bufferyard is proposed along the
east property line. The current location of the building does not
provide for a 10 foot wide bufferyard so the building will need to be
moved to the west to provide for the bufferyard. Two additional
canopy trees and 5 understory trees are needed within this
bufferyard. A "B" bufferyard is needed along the north property
line. Foundation plantings are proposed around the building as
well as plantings along the southerly end of the parking lot.
• 9) Ordinance Requirements: developmentThe does exceed the
landscape area requirements fo th B-4 zoning district and is
providing enough parking spaces based on the number of rooms;
and,
WHEREAS, the Commission, following its public hearing, recommended approval subject
to the following conditions:
1 Separate Grading Plan approval is required and payment of a Storm
Water management Area Charge is applicable for any increase in
impervious surface.
2. Construction of the concrete sidewalk is required along the entire frontage
of the property abutting 59th Street NW concurrent with the development
of the property.
3. The site Ian is contingent upon the City releasing the controlled access
along 59t� Street NW at the location of the driveway. The applicant shall
submit a vacation petition to the City, petitioning to vacate the controlled
access. If the vacation petition is denied the site plan shall be revised
according.
•
2
• 4. The site plan shall be revised, building moved and the required plantings,
so that there is a minimum of a 10 foot wide "D" bufferyard along the east
property line. The revised site plan shall also provide a "B" bufferyard
along the north property line.
5. Prior to development, the applicant shall demonstrate that fire apparatus
is able to make the corners in the parking lot.
6. Prior to development, the applicant shall dedicate the 20' wide utility
easements shown for the public water main to and including the fire
hydrants.
7. Prior to development, a detailed lighting plan, including illumination levels
at the property lines shall be submitted to the Planning Department for
review. The lighting must meet standard "C" in Section 63.210 of the
Land Development Manual.
8. Upon approval by the City Council for the Substantial Land Alteration, the
applicant shall provide surety that guarantees the site will be fully restored
after the completion of the excavation activity, unless the restoration cost
for said work is included in and identified separately in the City-Owner
Contract Bonds. Said surety must be provided prior to commencement of
• grading activities on the property. If the City Council denies the
Substantial Land Alteration, the grading plans shall be returned to the
designers for reevaluation.
WHEREAS, the Common Council held a public hearing on the Incentive Development
R2008-017CUP request on June 16, 2008, and gave all interested persons the opportunity to
make presentations and give testimony concerning the application; and,
WHEREAS, at the June 16t" public hearing, the applicant's representative agreed with all
of the recommended conditions of approval; and,
WHEREAS, based upon all of the evidence and testimony submitted during the June 16tn
public hearing, the Council accepts the Planning and Zoning Commission's recommended
findings of fact and conditions of approval.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Rochester that it adopt the Planning and Zoning Commission's findings of fact and that the
Incentive Development requested by HL2, LLC, is granted subject to the above eight conditions.
BE IT FURTHER RESOLVED that the City grant the requested design modification to
allow construction of a transient accommodation facility that would exceed the maximum height
by 15.33 feet. The maximum permitted height is 40 feet above grade and the proposed highest
point of the building will be 55.33 feet. The approval of the requested design modification is
• based upon the Planning and Zoning Commission's five findings of fact determined at the
3
•Commission's May 28, 2008, meeting.
BE IT FURTHER RESOLVED that the City waive the final plan review phase of this
development application.
PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF
ROCHESTER, MINNESOTA, THIS DAY OF , 2008.
PRESIDENT OF SAID COMMON COUNCIL
ATTEST: D'LI C� 7
CI CL R
APPROVED THIS 1 Gam► I DAY OF tt,Y , 2008.
MAYOR OF SAID CITY
(Seal of the City of
Rochester, Minnesota)
Zone05 lncendev.8-017.preli m
4