Loading...
HomeMy WebLinkAboutResolution No. 292-03 q • RESOLUTION WHEREAS, Elton Hills Plaza West LLC, applied for a Type III, Phase Il, Special District Amendment Final Site Development Plan #03-02 to allow the construction of a 18,000 square foot building for retail uses. The property is located within the 41st Street Business Park and is zoned SD-1 (Arboretum Special District). The property is located north of 41st Street N.W., and west of 31 st Avenue S.W., and is platted as Lot 5, Block 1, 41 st Street Business Park; and, WHEREAS, R.C.O. §§61.146, 62.708 provide the criteria for the review of this request; and, WHEREAS, the Planning Department staff recommended the following findings of fact for this application: Final Development Plan Criteria: a) Public Facility Design: An approved grading/drainage plan is required prior to construction. Extension of any public utilities will require approved construction plans, easements and execution of a city-owner contract. • b) Geologic Hazard: There are no known geologic hazards on this site. c) Access Effect: This property will be served by a private road system circulating through the Pro�ect Development Plan site, which will access public roads at 31s Ave. and 41st Street. Access to 41st Street, associated with the development of this building, needs to be shifted further west to provide additional left turn stacking within 41st Street, as was required with approval of the Project Development Plan for the overall project. d) Pedestrian Circulation: The applicant is responsible to construct 5' wide concrete sidewalk along the entire frontage of 41St Street NW concurrent with development of the property. e) Foundation and Site Plantings: A landscape plan for the site has been prepared which identifies foundation plantings along the south side of the building. The landscape plan needs to be revised to clarify the groundcover proposed for all areas not used for parking and circulation lanes or sidewalk. f) Site Status: Installation of public infrastructure will require approved construction plans and an executed owner contract. The • • applicant will need to work with the City to obtain an approved grading and drainage plan. g) Screening and Bufferyards: The landscape plan includes turf, trees and shrubs. Additional details are needed to identify proposed screening for the trash bin and to provide additional site plan information and clarification as noted above. An open drainage channel was identified on the Project Development Plan, through the site along with a 100' wide open space buffer area adjacent to the existing residential dwellings. The open space buffer includes a berm with plantings which will need to be completed during the first construction season (i.e. this year). h) Final Building Design: The final building design is generally consistent with the principles identified in preliminary development plan relative to height impact, setbacks, and internal site design. Minimal information was previously provided regarding intended building design, materials or colors. i) Internal Circulation Areas: Plans for off-street parking and loading areas and circulation aisles appear to meet ordinance requirements in terms of design. 5 j) Ordinance Requirements: At this time, the applicant needs to provide additional information and modifications to the application. Compliance with Ordinance requirements will be verified after reviewing the additional information. WHEREAS, on May 14, 2003, the Rochester Planning and Zoning Commission held a public hearing on the proposed amendment, reviewed the application according to the requirements of the above-named ordinances, adopted the Planning Department recommended findings of fact, and recommended approval subject to the compliance with the following conditions: 1. The applicant shall provide the additional plans and revisions as listed above at least two weeks prior to scheduling this item for a public hearing with the City Council. 2. An approved grading/drainage plan is required prior to development of the property. A Storm Water Management fee will apply for the benefit of participation in the City's Storm Water Management Plan (SWMP), as specified in the Development Agreement. 3. Prior to issuance of a zoning certificate and construction of structures, the applicant shall file a copy of a cross access agreement for this entire . project development site, which shall be recorded prior to construction. 2 • 4. Construction of a 5-foot wide concrete sidewalk is required along the entire frontage of 31s' Ave. NW, concurrent with development of this parcel. 5. Water service for this use shall be as specified by RPU Water (see April 22, 2003 comments). WHEREAS, the Common Council held a public hearing on the Final Site Plan Amendment request on June 2, 2003, and permitted all interested persons to be heard, and, WHEREAS, at the June 2nd hearing the Planning Department staff indicated that the Applicant submitted a revised site/landscaping plan on May 14, 2003. As a result of the revisions, the staff recommended the deletion of condition #1; and, WHEREAS, following the hearing, the Council concluded that the request for Special District Amendment Final Site Development Plan #03-02 satisfied the provisions of R.C.O. §§ 61.146 and 62.708 if the applicant satisfied the above four conditions (#2 -#5). NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Rochester that the Special District Amendment Final Site Development Plan requested by Elton Wills Plaza West LLC, (identified in the records of the Consolidated Planning Department as special District Amendment Final Site Development Plan No. 03-02) is granted, subject to the above four conditions (#2 -#5). PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF ROCHESTER, MINNESOTA, THIS Z,)J DAY OF <-JW , 2003. PRESIDENT OF SAID COMMON COUNCIL ATTEST: C� ITY CLERK APPROVED THIS DAY OF 7( � - , 2003. MAYOR OF SAID CITY (Seal of the City of Rochester, Minnesota) one2000/Fi nalS itePlanS D.0302 3