HomeMy WebLinkAbout2022_12 Summary - COR DMC TB & WF
Goals: Commercial: 7%; Heavy Civil: 4%
2017-2022 TB Performance (C&HC): 7.4%
Active Projects TB Performance: 4.6%
Commercial (C): 3.6%
Heavy Civil (HC): 5.4%
North Broadway (HC)
Bryk on Broadway Apartments (C)
Discovery Walk (HC)
Downtown Sidewalks (HC)
J7344 3rd Avenue (HC)
Block 6 Street Project (HC)
Chateau Theatre Renovations (C)
Active Projects
Upcoming Projects
F o r m o r e i n f o r m a t i o n s e e t h e C i t y o f R o c h e s t e r
T a r g e t e d B u s i n e s s a n d W o r k f o r c e P a r t i c i p a t i o n P l a n w e b s i t e o r
c o n t a c t J o r r i e J o h n s o n j j o h n s o n @ r o c h e s t e r m n .g o v ◦ (5 0 7 ) 3 2 8 -2 0 1 6
SRF A&E Rapid Transit (LINK)
6th Street Bridge A & E - Class 2
Active Projects
Upcoming Projects
D ES TI N A T I O N M E D I C A L C ENT E R
P R O FE S S I O NA L S E R VI CE S (P S ) &
C O N S T R U C T I O N AD MI N I S T RAT IO N
TARGETED BUSINESS (TB)
Goal: 7%
2017-2022 TB Performance*: 5.9%
Active Projects TB Performance: 6.3%
WORKFORCE PARTICIPATION
Performance
Goals 2017-2022* Active
Women: 9% 34% 33%
Minorities: 15% 10% 12%
WORKFORCE PARTICIPATION
Performance
Goals 2017-2022* Active
Women: 9% 3.6% 4.3%
Minorities: 15% 15.4% 14.2%
Rochester Residents: 19.8%
C O N S T R U C T I O N
I N D U S T R Y N E W S
T A R G E T E D B U S I N E S S A N D
W O R K F O R C E P A R T I C I P A T I O N M O N T H L Y R E P O R T
J a n u a r y 2 0 2 3
D E S T IN A TI O N ME DI C A L C E N T E R
C O N S T R U C T I O N P R O J E CT S
TARGETED BUSINESS (TB)
*Results are cumulative April 2017 through December 2022.
.
*Results are cumulative April 2017 through December 2022.
CI T Y O F RO C H E S T E R P R O J E CT S
Northern Heights TIF project**
Sidewalks*
Downtown Building Energy
Transition: Mayo Civic Center
Art Center and City Hall
J2981 Cascade Lake Park
Improvements and Playground
J4678 Chester Woods Trail*
J4693 Construct TH14/S
Broadway Trail*
J4721 Pedestrian Ramps*
J9852 Reconstruct 65 St NW
from 60 Ave NW to 50 Ave NW
J7843 9th Street Portion of
Duct Bank
Active Projects
Department
Rental Rehab Pilot Project*
Hiawatha Homes* – lift
replacement in homes
Silver Lake (Design 2022,
Playground/ Skateboard Park
2023, Aquatics 2024)
Soldiers Field (Aquatics, Trails
and Playground)
48th Street and Commercial
Dr SW Roundabout
J4725 Sidewalk and
Pedestrian Ramp
Improvements
Marion Road Substation
Feeder System - Soldiers
Field to 5th Street
Phases 2 & 3: Liquids and
Solids Upgrade (Fall 2023)
Upcoming Projects
Community Development
Public Works
Streets
Parks and Recreation
Rochester Public Utilities
Water Reclamation Plant
Rochester Public Transit
*Prevailing Wage Only
**Prevailing Wage Exempt
Request for Proposals
Rochester LINK Rapid Transit
Land Acquisition Services (PS)
Proposals Due by 4 pm CST
February 21, 2023
DBE Participation Goal: 2%
City of Rochester City of Rochester City of Rochester andandand
Destination Medical CenterDestination Medical CenterDestination Medical Center
2023 Projects2023 Projects2023 Projects
wwwith ith ith Targeted Business,Targeted Business,Targeted Business,
Prevailing Wage andPrevailing Wage andPrevailing Wage and
Workforce Participation GoalsWorkforce Participation GoalsWorkforce Participation Goals
https://mn-ci-rochester.https://mn-ci-rochester.https://mn-ci-rochester.
app.rtvision.com/oneoffice/biddingapp.rtvision.com/oneoffice/biddingapp.rtvision.com/oneoffice/bidding
City of Rochester
Public Works projects with Targeted
Business contracting, Prevailing Wage
requirement and goals for women
and people of color in the workforce
currently open for bids:
J4725 Sidewalk and Pedestrian Ramp
Improvements SE District 4-1
Bids due by: Feb. 16, 2023, 11 a.m.
Destination Medical Center
public infrastructure projects have
Targeted Business contracting goals
with certified women, minority,
veteran or small businesses,
Prevailing Wage and
Workforce Participation goals.
1. Chateau Theatre Improvements
2. Soldiers Field Park Revitalization
3. Riverfront Activation (PS)
5. St Marys Place (PS)
6. Sanitary Sewer Capacity Bypass
on 3rd Ave SW (2nd St SW -
4th St SW) (PS)
7. 6th Street Bridge Project (PS)
7. LINK Rapid Transit (PS)
Professional Services (PS) have
project specific Targeted Business goals.
Downtown Energy
Bryk on Broadway Minority
Workforce Participation 17%
African American 1%
Latino 15%
Asian Pacific Islander,
American Indian and
Other < 1% each
RSVP to Amy Jansen at ajansen@knutsonconstruction.com
F o r m o r e i n f o r m a t i o n s e e t h e C i t y o f R o c h e s t e r
T a r g e t e d B u s i n e s s a n d W o r k f o r c e P a r t i c i p a t i o n P l a n w e b s i t e o r
c o n t a c t J o r r i e J o h n s o n j j o h n s o n @ r o c h e s t e r m n .g o v ◦ (5 0 7 ) 3 2 8 -2 0 1 6
Chapter Meetings
11:30 a.m. - 12:30 p.m.
February 1, 2023
11:30 a.m. - 12:30 p.m.
March 1, 2023
11:30 a.m. - 12:30 p.m.
WIC Week
March 5-11, 2023
www.nawicsemn.org/
May 4-6, 2023
Rochester, Minnesota
SPRING FORUM?
WHAT IS IT?
Midwest Region: Watch This!
NAWIC
Midwest Region
108 Elton Hills Ln NW
Rochester, MN 55901
507.282.7698
RAB@RochesterAreaBuilders.com
CONSTRUCTION PROFESSIONALS
BUILDING YOUR COMMUNITY
January 2023
In 2022 City of Rochester and Destination Medical Center projects projects had
2.4% African American construction workforce participation.
We recognize the contractors that employed African Americans to work on the following projects.
The City of Rochester and Destination Medical Center
collaborate with
Building Strong Communities and
Workforce Participation, Inc.
to help recruit and train women and
people of color for construction trades careers.
Discovery Walk (986 hours, 5.5%)
Fowler & Hammer, Inc
General Laborer Apprentice
Pember Companies
General Laborer
Front End, Skid Steer Operator
Knutson Construction
General Laborer
Downtown Sidewalk Experience Enhancements
Pember Companies (272.5 hours, 4.2%)
General Laborer
North Broadway (355 hours, .6%)
AAA Striping Service Co.
Pavement Marking Equipment Operator
Chippewa Concrete Services, Inc.
General Laborer
Green Lawncare
Landscape Laborer
PCiRoads
General Laborer
Warning Lites
General Laborer
65th Street NW Reconstruction (410.5 hours, 1.5%)
Elcor Construction, Inc.
General Laborer
Foot Roller Operator
Thul Specialty Contracting
Painter
9th Street SE Duct Bank (13 hours, .3%)
Doyle Conner Co.
General Laborer
Bryk on Broadway Apartments (938 hours, 1%)
Carl Bolander & Sons, Inc.
General Laborer
Piledriver
C and S Management Company, Inc.
Roofer and Roofer Apprentice
Carpentry Builders, Inc.
Carpenter Apprentice
Mathy Construction Co, dba Rochester Sand & Gravel
General Laborer
Merit Contracting, Inc.
Roofer
Molin Concrete Products
Skilled Laborer
Mulcahy Nickolaus, LLC
Carpenter
Sorensen & Sorensen Painting Inc.
Painter
Warning Lites
Traffic Control
2023 RAB HOME SHOW2023 RAB HOME SHOW2023 RAB HOME SHOW
FEBRUARY 3, 4, 5, 2023FEBRUARY 3, 4, 5, 2023FEBRUARY 3, 4, 5, 2023
Mayo Civic CenterMayo Civic CenterMayo Civic Center