HomeMy WebLinkAbout2023_07 Summary - COR DMC TB & WF
City of Rochester
Requests for Proposals and Bids
webpage
Bids announcements:
https://mn-ci-rochester.
Water Reclamation Plant Project
Request for bids released soon!
Goals Commercial (C): 7% Heavy Civil (HC): 4%
TB Contracts (Performance)
All Projects (2017-2023): 7.4%
Active Projects: 13.4%
Commerical: 18.7% HC: 6.7%
Discovery Walk (HC)
Downtown Sidewalks (HC)
Chateau Theatre Renovations (C)
Soldiers Field Park
Active Projects
F o r m o r e i n f o r m a t i o n s e e t h e C i t y o f R o c h e s t e r
T a r g e t e d B u s i n e s s a n d W o r k f o r c e P a r t i c i p a t i o n P l a n w e b s i t e o r
c o n t a c t J o r r i e J o h n s o n j j o h n s o n @ r o c h e s t e r m n .g o v ◦ (5 0 7 ) 3 2 8 -2 0 1 6
SRF A&E Rapid Transit (LINK)
Rochester Link Rapid Transit Art
Soldiers Field Park Improvements
Land Acquisition Services (J8707)
Riverfront Small Area Plan Ph 2
6th Street Bridge A & E Design
Active Projects
D E S T I N AT I O N M E D I C A L C E N T ER F U ND E D
P RO F E S S I ONA L T E C H N I C A L (P T ) &
C ONS TR U C T I O N A D M I N I S T R AT IO N PR O J E C T S
TARGETED BUSINESS (TB) CONTRACTS
Goals Base: 7% Project Specific: TBD%
TB Contracts (Performance)
All Projects (2017-2023): 6.2%
Active Projects : 6.5%
WORKFORCE PARTICIPATION
Performance
Goals All* Active
Women: 9% 34.3% 33%
Minorities: 15% 10.2% 12%
WORKFORCE PARTICIPATION
Performance
Goals All* Active
Women: 9% 3.7% 6.5%
Minorities: 15% 16.3% 10%
Rochester Residents: 11.3%
C O N S T R U C T I O N
I N D U S T R Y N E W S
T A R G E T E D B U S I N E S S A N D
W O R K F O R C E P A R T I C I P A T I O N M O N T H L Y R E P O R T
A u g u s t 2 0 2 3
D E S T I N A T I O N M E D I C A L C E N T E R F U N D E D
CO N S T R UC T I O N P R O J E CT S
*Results are cumulative April 2017 through July 2023.
.
*Results are cumulative April 2017 through July 2023.
CI TY O F R OCH ES TE R C O N S T RUC T I O N P RO J EC T S
Downtown Building Energy
Transition: Mayo Civic Center,
Art Center and City Hall
J2573 75th Street NW Park and
Ride
J2981 Cascade Lake Park
J4721, J4724 and J4725
Pedestrian Ramps*
J6013 Viola Rd and Cassidy Dr
J6068 48th St SW and Comm.
J7773 W Zumbro SS Ext.
J7843 9th Street Portion of Duct
Bank and Marion Road
J9852-3 Reconstruct 65 St NW
from 60 Ave NW to 50 Ave NW
Marion - Mayo Clinic
Underground Distribution
Valleyhigh Drive TIF
Active Projects
*Prevailing Wage Only
Goals Commercial (C): 7% Heavy Civil (HC): 4%
TB Contracts (Performance)
All Projects (2019-2023): $6,742,095 = 6%
Active Public Projects: $2,980,814 = 5.1%
Active Private Projects: $2,219,481 = 15.3%
TARGETED BUSINESS (TB) CONTRACTS
TARGETED BUSINESS (TB) CONTRACTS
Soldiers Field Park Project
Since January 1 2023, women
have performed 27% and
people of color have performed
21% of the PT services on
Soldiers Field Park project.
Equity Series
Watch August 23, 2023
Go to DMC Meetings, Events
and Materials
The Equity Alliance Equity Series is a
monthly seminar sponsored by
Destination Medical Center and the
City of Rochester. The purpose is to
introduce diversity, equity, and
inclusion best practices, build
sustainable DEI community strategies,
and build advocacy and allyship
within the Rochester community. The
series is held virtually on the fourth
Wednesday of every month at noon.
September 27, 2023 12 - 1 p.m.
Watch July 26, 2023
2023 City and DMC
(Combined) Construction
Workforce Participation
Of 512 construction workers:
77 People of Color (14%)
22 Females (4%)
4 Females of Color (<1%)
124 Reside in Rochester (24%)
330 Reside in Zip Codes 559XX (64%)
WORKFORCE PARTICIPATION
Performance
Goals All* Active
Women: 9% 5.6% 8.4%
Minorities: 15% 11.4% 9.8%
Rochester Residents: 21.6% 21.6%
*Results are cumulative 2019 through July 2023.