HomeMy WebLinkAbout2023_11 Summary - COR DMC TB & WF
City of Rochester
Requests for Proposals and Bids
webpage
Bids announcements:
https://mn-ci-rochester
Goals Commercial (C): 7% Heavy Civil (HC): 4%
TB Contracts (Performance)
All Projects (2017-2023): 7.9%
Active Projects: 13.8%
Commerical: 19% HC: 6%
Active Projects
Discovery Walk (HC)
Chateau Theatre Renovations (C)
Soldiers Field Park (C)
Chateau Theatre HVAC Upgrade (C)
F o r m o r e i n f o r m a t i o n s e e t h e C i t y o f R o c h e s t e r
T a r g e t e d B u s i n e s s a n d W o r k f o r c e P a r t i c i p a t i o n P l a n w e b s i t e o r
c o n t a c t J o r r i e J o h n s o n j j o h n s o n @ r o c h e s t e r m n .g o v ◦ (5 0 7 ) 3 2 8 -2 0 1 6
Active Projects
SRF A&E Rapid Transit (LINK)
Rochester Link Rapid Transit Art
Soldiers Field Park Improvements
Land Acquisition Services (J8707)
Riverfront Small Area Plan Ph 2
6th Street Bridge A & E Design
D E S T I N A T IO N M E DI C A L C E N T E R FUND E D
P RO F ES S IO N A L T E C H N IC AL (P T ) &
C ONS TR U C TI ON AD MI N I ST R A TI ON P R O JE C TS
TARGETED BUSINESS (TB) CONTRACTS
Goals Base: 7% Project Specific: TBD%
TB Contracts (Performance)
All Projects (2017-2023): 6.3%
Active Projects: 6.7%
WORKFORCE PARTICIPATION
Performance
Goals All* Active
Women: 9% 33.9% 32.8%
Minorities: 15% 10.2% 12.3%
WORKFORCE PARTICIPATION
Projects Performance
Goals All* Active
Women: 9% 3.6% 4.4%
Minorities: 15% 16% 8.5%
Rochester Residents: 16% 10%
C O N S T R U C T I O N
I N D U S T R Y N E W S
T A R G E T E D B U S I N E S S A N D
W O R K F O R C E P A R T I C I P A T I O N M O N T H L Y R E P O R T
D e c e m b e r 2 0 2 3
D E S T I N A T IO N M E DI C A L C E N T ER F U N D E D
C ON S T R U C T I O N P R O J E C T S
*Results are cumulative April 2017 through October 2023.
.
*Results are cumulative April 2017 through October 2023.
CI TY O F R OC H E ST E R C O N S T R U CT IO N P R O J EC T S
Active Projects
Downtown Building Energy
Transition: Mayo Civic Center,
Art Center and City Hall
Hiawatha Homes Lifts*
J2573 75th Street NW Park and
Ride
J4721, J4724 and J4725
Pedestrian Ramps*
J6013 Viola Rd and Cassidy Dr
J6068 48th St SW and Comm.
J6519 2022 Stormwater
J7773 W Zumbro SS Ext.
J7843 9th Street Portion of Duct
Bank and Marion Road
J7851 Marion - Mayo Clinic
Underground Distribution
J9852-3 Reconstruct 65 St NW
from 60 Ave NW to 50 Ave NW
Valleyhigh Drive TIF
*Prevailing Wage Only
Goals Commercial (C): 7% Heavy Civil (HC): 4%
TB Contracts (Performance)
All Projects (2019-2023): $8,532,129 = 7.6%
Active Public Projects: $4,237,351 = 8.1%
Active Private Projects: $2,219,481 = 15.3%
TARGETED BUSINESS (TB) CONTRACTS
TARGETED BUSINESS (TB) CONTRACTS
Equity Series
Go to DMC Meetings, Events
and Materials
The Equity Alliance Equity Series is a
monthly seminar sponsored by
Destination Medical Center and the
City of Rochester.
January 10, 2024 12-1 p.m.
WORKFORCE PARTICIPATION
Projects Performance
Goals All* Active
Women: 9% 5.1% 7.2%
Minorities: 15% 9% 8.9%
Rochester Residents: 23.4% 20.4%
*Results are cumulative 2019 through July 2023.Watch past sessions.Green = Exceeds goal Black = On or near goal (+/-2%) Red = Does not meet goal
Latest News and Updates
Request for Proposals
LINK Bus Rapid Transit
Construction Management
will be advertised in January 2024.
Due date TBD.
Scopes of Work Include:
Constructability/Peer Review
Utility Coordination Services
Construction Project Controls
Program Implementation and Support
Pre-Bid, Bidding and
Pre-Construction Phase Activities
Construction Activities
Construction Quality Control and
Material Testing Services
Construction Safety
Construction Communications
Survey
Closeout Activities
Reminder: PT projects
with bi-annual reporting
July - December 2023
reports are due
January 15, 2024.
Water Reclamation Plant Proj ect
Bids due February 1, 2024!