HomeMy WebLinkAbout9/11/2014 DMCC Board Meeting - Agenda and Meeting Packet DESTIN ATION MEDICAL CENTER CORPOR ATION (DMCC) BOARD MEETING 9:00 A.M. THURSDAY, SEPTEMBER 11, 2014 ROCHESTER CONVENTION CENTER Destination Medical Center Corporation Financial Summary July 2014 2014 Curent Month July 2014 Amount Percent Approved Budget July 2014 YTD Remaining Remaining General Expenses 146,000                              61                                 3,235                      142,765               98% Professional Services 400,000                              89,931                         257,406                 142,594               36% City Expenses 340,000                               Subtotal DMCC 886,000                              89,992                         260,641                 285,359               32% Third Party Costs ‐ DMC EDA * Planning, Archictecture, Engineering 2,431,000                           75,986                         128,299                 2,302,701            95% Marketing and Public Relations Communications Marketing & PR 545,000                              53,044                         90,068                    454,932               83% Public Relations & Communications 245,000                              13,355                         33,080                    211,920               86% Development and Legal Services Development Services 1,675,000                           182,500                       730,000                 945,000               56% Financial, Accounting, and Investment Ser 675,000                              67,500                         270,000                 405,000               60% Legal Services 425,000                              0                                   57,304                    367,696               87% Miscellaneous Professional Services Economic Analysis Market Research, Repo 351,000                              50,931                         88,892                    262,108               75% Other Professional Services & Project Cos 100,000                               ‐                           Other Development Costs Payroll, Staff, Administration & Benefits‐E 460,000                               ‐                                 ‐                          460,000               100% General Expenses ‐ EDA 382,000                              5,525                            84,093                    297,907               78% Reimbursable Expenses 30,000                                 ‐                                3,083                      26,917                 90% Subtotal DMC EDA 7,319,000                           448,841                       1,484,819              5,834,181            80% Total All 8,205,000                           538,833                       1,745,460              6,459,540            79% DMCC Working Capital Note 3,000                       * See Attached Contract Commitments for EDA Portion EDA Working Capital Note 10,000                     Report 4002 8/13/2014 - 1:23 PM Page 1 of 1 DMC - ECONOMIC DEVELOPMENT AGENCY DETAIL COST REPORT #4 Variance Division Description Master Project Budget A Original Contract Amount B Contract Revisions C Committed Costs B+C Committed Direct Owner Purchases D Un-Committed Costs E Final Projected Cost B+C+D+E Over/(Under) Budget (B+C+D+E)-A Total Work In Place Percent Complete DEVELOPMENT COSTS 40-05-000 Architecture & Engineering $2,431,000.00 $1,542,261.95 $10,945.06 $1,553,207.01 $0.00 $877,792.99 $2,431,000.00 $0.00 $128,299.32 5.28% 40-05-300 Planning Services, Architecture, Engineering $2,431,000.00 $1,542,261.95 $10,945.06 $1,553,207.01 $0.00 $877,792.99 $2,431,000.00 $0.00 $128,299.32 5.28% 40-25-000 Marketing & Public Relations $790,000.00 $223,503.05 $12,105.44 $235,608.49 $0.00 $554,391.51 $790,000.00 $0.00 $123,148.34 15.59% 40-25-300 Communications, Marketing & PR $545,000.00 $176,237.76 $3,830.44 $180,068.20 $0.00 $364,931.80 $545,000.00 $0.00 $90,068.20 16.53% 40-25-310 Public Relations & Communications $245,000.00 $47,265.29 $8,275.00 $55,540.29 $0.00 $189,459.71 $245,000.00 $0.00 $33,080.14 13.50% 40-30-000 Development Services $2,350,000.00 $2,300,000.00 $0.00 $2,300,000.00 $0.00 $50,000.00 $2,350,000.00 $0.00 $1,000,000.00 42.55% 40-30-300 Development Services $1,675,000.00 $1,675,000.00 $0.00 $1,675,000.00 $0.00 $0.00 $1,675,000.00 $0.00 $730,000.00 43.58% 40-30-310 Financial, Accounting & Investment Services $675,000.00 $625,000.00 $0.00 $625,000.00 $0.00 $50,000.00 $675,000.00 $0.00 $270,000.00 40.00% 40-35-000 Legal Services $425,000.00 $89,208.01 $0.00 $89,208.01 $0.00 $335,791.99 $425,000.00 $0.00 $57,304.21 13.48% 40-35-300 Legal Services $425,000.00 $89,208.01 $0.00 $89,208.01 $0.00 $335,791.99 $425,000.00 $0.00 $57,304.21 13.48% 40-55-000 Misc Professional Services $451,000.00 $298,473.00 $10,000.00 $308,473.00 $0.00 $142,527.00 $451,000.00 $0.00 $88,891.94 19.71% 40-55-300 Economic Analysis, Market Research, Reports $351,000.00 $298,473.00 $10,000.00 $308,473.00 $0.00 $42,527.00 $351,000.00 $0.00 $88,891.94 25.33% 40-55-310 Other Professional Services & Project Costs $100,000.00 $0.00 $0.00 $0.00 $0.00 $100,000.00 $100,000.00 $0.00 $0.00 0.00% 40-90-000 Other Development Costs $872,000.00 $89,555.84 $7,619.55 $97,175.39 $0.00 $774,824.61 $872,000.00 $0.00 $97,175.39 11.14% 40-90-115 Payroll, Staff, Administration & Benefits-EDA $460,000.00 $0.00 $0.00 $0.00 $0.00 $460,000.00 $460,000.00 $0.00 $0.00 0.00% 40-90-120 General Expenses-EDA $382,000.00 $89,555.84 $4,536.96 $94,092.80 $0.00 $287,907.20 $382,000.00 $0.00 $94,092.80 24.63% 40-90-300 Reimbursable Expenses $30,000.00 $0.00 $3,082.59 $3,082.59 $0.00 $26,917.41 $30,000.00 $0.00 $3,082.59 10.28% Subtotal $7,319,000.00 $4,543,001.85 $40,670.05 $4,583,671.90 $0.00 $2,735,328.10 $7,319,000.00 $0.00 $1,494,819.20 20.42% PROJECT CONTINGENCY 90-00-000 Project Contingency $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00% Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00% PROJECT TOTAL $7,319,000.00 $4,543,001.85 $40,670.05 $4,583,671.90 $0.00 $2,735,328.10 $7,319,000.00 $0.00 $1,494,819.20 20.42% Work in PlaceSchedule of Values July 31, 2014 Destination Medical Center Creating the World’s Leading Center for Excellence in Health, Wellness and Medical Innovation DMC 2015 OPERATING BUDGET & EDA WORK PLAN September 11, 2014 PRELIMINARY – FOR REVIEW AND COMMENT 1 PRELIMINARY – FOR REVIEW AND COMMENT 1.0 Introduction - DMC Overview and Goals - Document Overview - Consolidated DMC 2015 Operating Budget 2.0 DMCC 2015 Budget 3.0 EDA 2015 Budget and Work Plan A. EDA Preliminary Operating Framework and Organizational Structure - EDA Purpose, Roles and Responsibilities - Organizational Structure - Roles and Responsibilities of EDA Staff B. EDA 2015 Work Plan -EDAWorkPlan C. EDA 2015 Operating Budget - Preliminary Operating Budget 4.0 Capital Plan - DMC Capital Plan DMC 2015 OPERATING BUDGET & EDA WORK PLAN  TABLE  OF CONTENTS Introduction 3 PRELIMINARY – FOR REVIEW AND COMMENT The State of Minnesota has a national reputation for excellence in health care and medical innovation and has made significant investments to stimulate the development of this high-value economic activity in the State. In 2013, Mayo Clinic – the State’s largest private employer – with the City of Rochester, Olmsted County and other community stakeholders brought forward the Destination Medical Center (DMC) proposal to secure Rochester’s and Minnesota’s future as a global medical destination. After careful deliberation, the Governor and the Minnesota Legislature concluded there was a compelling public interest for the state to assist in the development of the DMC and to create in State statute the financing tools and public governance structure necessary to realize this transformational development in Rochester and the region. The goals of the DMC have been established by the DMCC Board as: DMC Goals (Adopted By DMCC) The following goals have been adopted by the Destination Medical Center Corporation (DMCC) and serve as the basis of the Development Plan and strategies for the DMC Initiative going forward. Create a comprehensive strategic plan with a compelling vision that harnesses the energy and creativity of the entire community Leverage the public investment to attract more than $5 billion in private investment to Rochester and the region Create approximately 35,000 – 45,000 new jobs, with workforce development strategies that support of that growth Generate approximately $7.5 - $8.0 billion in new net tax revenue over 35 years Achieve the highest quality patient, companion, visitor, employee, and resident experience, now and in the future DMC 2015 OPERATING BUDGET & EDA WORK PLAN  DMC OVERVIEW & GOALS (ADOPTED BY  DMCC) 4 PRELIMINARY – FOR REVIEW AND COMMENT DMC 2015 OPERATING BUDGET & EDA WORK PLAN  DOCUMENT OVERVIEW AND OBJECTIVES The following provides an overview of the proposed DMC 2015 operating budget for the review and approval of the Destination Medical Center Corporation (DMCC) Board of Directors. The budget is comprised of the three parts: DMCC Operating Budget Includes the estimated expenses associated with the DMCC operations in 2015. The budget is comprised of expenses for the Board of Directors and third party professional services related to legal, financial and similar activities the DMCC Board will undertake in its role to oversee the implementation of the DMC initiative. City of Rochester Budget This includes the estimated operating expenses for the City of Rochester to administer and oversee certain aspects of the DMC Initiative, including the estimated expenses for the City to act in its role as fiscal agent on the project. Note, this estimate is based on previous year’s estimated expenses (2014) and is subject to change as the City finalizes its budget for the 2015 operating year. Economic Development Agency (EDA) Budget and Work Plan This includes the estimated operating expenses for the EDA to provide services to develop and market the DMC Initiative in accordance with the DMC Law and the service agreement between the DMCC and EDA. In 2015, the EDA will transition its primary activities from planning to implementing the DMC Development Plan. A staffing plan and work plan are provided in this document to illustrate the structure and functions anticipated to be undertaken by the organization in 2015. The full budget is included on the following page. The detailed budgets are incorporated in sections 2.0 – 4.0 of this document. 5 PRELIMINARY – FOR REVIEW AND COMMENT DMC 2015 OPERATING BUDGET & EDA WORK PLAN  DMC 2015 CONSOLIDATED BUDGET 1. City budget is based on estimate of previous year’s expenses. City’s final budget is pending. 2. EDA budget does not include additional identified costs for professional services contingency or web site upgrades. The proposed 2015 consolidated budget for DMC operations is included below. 2014 Expenses 2015 Total ORGANIZATIONAL EXPENSES  Destination Medical Center Corporation (DMCC) General  Administrative Expenses $146,000 $217,203 Professional  Services $400,000 $780,600 Subtotal $546,000 $997,803 City of  Rochester (Note 1)$340,000 $275,000 Economic Development Agency (EDA) (Note 2) Payroll, Staff and  Administrative Benefits $460,000 $1,285,000 General  Administrative Expenses $382,000 $222,000 Marketing  Expenses NA $261,000 Meeting Expenses NA $12,000 Professional  Services NA $555,000 Miscellaneous Costs NA $180,000 Subtotal $842,000 $2,515,000 THIRD PARTY COSTS (RELATED TO DEVELOPMENT PLAN AND START UP) Development Plan and Start Up Costs $6,477,000 NA Total  Expenses $8,205,000 $3,787,803 DMCC 2015 OPERATING BUDGET 7 PRELIMINARY – FOR REVIEW AND COMMENT DMC 2015 OPERATING BUDGET & EDA WORK PLAN  DMCC 2015 BUDGET The estimated expenses associated with DMCC operations is outlined below. Expenses are anticipated to include the costs associated with the DMCC meetings and professional services from third parties representing the DMCC in legal, financial and other services. Notes: (1) Estimate for Civic Center room including staff and equipment (2) $55/day Per Diem (non Public Sector Board Members - 4 (3) Assume $75/ meeting average cost - 8 board members (4) Insurance Cost based on estimated EDA costs (5) Allowance and/or estimate based on other similar organizations (6) Est. Current cost 2015 escalation Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2015 Total Staff Expenses 1.25%     Meeting Expenses (note 1) $2,228 $2,228 $2,228 $2,228 $2,228 $2,228 $2,228 $2,228 $2,228 $2,228 $2,228 $2,228 $26,730     Board Payments (note 2) $223 $223 $223 $223 $223 $223 $223 $223 $223 $223 $223 $223 $2,673     Travel  Expenses Allowance (note 3) $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $600 $7,200 Subtotal $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $3,050 $36,603 General  Administrative Expenses 2.00%     Insurance (Note 4)$150,000     Miscellaneous Expenses Reserve  (note 5) $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $30,600 Subtotal $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $2,550 $180,600 Professional Services 2.00%     Legal  Services $400,000     External  Auditor (note 5)$50,000     Professional Services / Contingency (non‐EDA provided ‐ note 5) $300,000     Insurance/Risk Advisor (note 6) $30,600 Subtotal $780,600 Total  Expenses $997,803 EDA 2015 PRELIMINARY OPERATING BUDGET & WORK PLAN 9 PRELIMINARY – FOR REVIEW AND COMMENT DMC 2015 OPERATING BUDGET & EDA WORK PLAN  EDA OVERVIEW & WORK PLAN In 2015, the DMC Initiative will evolve from the planning phase to the implementation phase of work. The Destination Medical Center Economic Development Agency (EDA) is the entity responsible for “developing and marketing” the DMC Initiative on behalf of the DMCC and City. The specific responsibilities of the EDA are enumerated under Minnesota, Chapter 143 (2013-2014 Regular Session), Article 10 (the “DMC Law”) and further defined in an “Agreement for Destination Services” between the Destination Medical Center Corporation (DMCC) and EDA (the “DMCC/EDA Agreement”) The following document provides an overview of the proposed “2015 Operating Budget and Work Plan” for the EDA and provides an explanation of the operating framework anticipated to execute the work. The objectives of this proposal are to: Objectives of the EDA 2015 Operating Budget and Work Plan 1. Establish an operating framework and budgetary proposal to establish an organization structure that has the capacity and capabilities needed to execute this complex $5 billion initiative in accordance with the DMC Law. 2. To outline a general work plan and target accomplishments / milestones for the first year of operations. 3. To establish a staffing structure and operating plan positioned to attract and retain top talent to the organization, with the “experience and expertise” (see DMC Law) to execute the Development Plan and meet the EDA’s statutory and contractual obligations. 4. To breed flexibility in the plan, especially in the 2015 calendar year, to allow the EDA to evolve with input and guidance from the permanent Executive Director and senior staff and to respond to the specific requirements of the final development plan as approved by the DMCC Board and City of Rochester (target date for approval is February 2015). This 2015 Operating Budget and Work Plan is preliminary in nature and will continue to evolve with the input of EDA Executive Director, senior staff and as the Development Plan is completed and approved by the DMCC Board and City of Rochester. Over time, it may change to meet the requirements of the project. EDA PRELIMINARY OPERATING FRAMEWORK 11 PRELIMINARY – FOR REVIEW AND COMMENT The EDA is a non-profit economic development agency established under Minnesota, Chapter 143 (2013-2014 Regular Session), Article 10 (the “DMC Law”) for the purpose of “providing experience and expertise to the DMCC for purposes of developing and marketing the destination medical center”. The services required of the EDA are specified in the DMCC Law and under the DMCC/EDA Agreement and include: Services Enumerated by the DMC Law & DMCC/EDA Contract The services enumerated in the DMC Law, and which are also contracted for under the DMCC/EDA Agreement, require the EDA to manage the process and complete the DMC Development Plan (Target Adoption-February 2015). Additionally, the EDA must assist the DMCC and City in implementing the goals, objectives and strategies in the DMC Development Plan, including, but not limited to: 1. Facilitating private investment through development of a comprehensive marketing program to global interests; 2. Developing and updating the criteria for evaluating and underwriting development proposals; 3. Drafting and implementing the development plan, including soliciting and evaluating proposals for development and evaluating and making recommendations to the authority and the city regarding those proposals; 4. Providing transactional services in connection with approved projects; 5. Developing patient, visitor, and community outreach programs for a destination medical center development district; 6. Working with the corporation to acquire and facilitate the sale, lease, or other transactions involving land and real property; 7. Seeking financial support for the corporation, the city, and a project; 8. Partnering with other development agencies and organizations, the city, and the county in joint efforts to promote economic development and establish a destination medical center; DMC 2015 OPERATING BUDGET & EDA WORK PLAN  EDA PURPOSE, ROLES & RESPONSIBILITIES 12 PRELIMINARY – FOR REVIEW AND COMMENT 9. Supporting and administering the planning and development activities required to implement the development plan; 10. Preparing and supporting the marketing and promotion of the medical center development district; 11. Preparing and implementing a program for community and public relations in support of the medical center development district; 12. Assisting the corporation or city and others in applications for federal grants, tax credits, and other sources of funding to aid both private and public development; and 13. Making other general advisory recommendations to the corporation and the city, as requested. Additional Services (Required Under DMCC/EDA Contract): The DMCC/EDA Agreement provides for certain other services to be undertaken by the EDA, including: 1. Project Management 2. Information and Recommendations (Advisory and Oversight Services) 3. Project Budget Management 4. Accounting 5. Project Reporting DMC 2015 OPERATING BUDGET & EDA WORK PLAN  EDA PURPOSE, ROLES & RESPONSIBILITIES 13 PRELIMINARY – FOR REVIEW AND COMMENT EDA BOARD OF DIRECTORS EXECUTIVE DIRECTOR Senior Financial Manager Project Accountant(s) Targeted Business Administrator Administrative Staff Development/Project Manger(s) Financial Analyst(s) Marketing & Communications Manager Community Relations Coordinator Communications Associate MARKETING & COMMUNICATIONS DEPARTMENT E D A S T A F F OPERATIONS DIRECTOR ACCOUNTING & REPORTING DEPARTMENT BUSINESS DEVELOPMENT & FINANCE DEPT. This organizational chart is provided to demonstrate a preliminary organizational structure for the EDA as it moves into full-scale operations. Consultants and Service Providers DMC 2015 OPERATING BUDGET & EDA WORK PLAN  PRELIMINARY OPERATING FRAMEWORK This organizational framework is provided to give context to the DMCC Board on the scope and scale of the organization that is required to manage this complex, $5 billion initiative. The organizational structure and staff plan may evolve over time to respond to specific requirements and strategies of the project and/or the Development Plan. The EDA Executive Director, with approval from the EDA Board, will be responsible to determine the final staff and operating structure, provided such structure is consistent with the approved budget. 14 PRELIMINARY – FOR REVIEW AND COMMENT STAFF TYPE OF REQUIREMENT REFERENCE TO REQUIREMENT TYPE OF SERVICE Executive Director Project Oversight All • All Services and Work of Staff Statutory #1 • Attracting and facilitating private investment through development of a comprehensive marketing program to global interests Statutory #8 • Partnering with other development agencies and organizations, the City, and the County in joint efforts to promote economic development and establish a destination medical center Statutory #9 • Supporting and administering the planning and development activities required to implement the Development Plan Contractual Information & Recommendations • Advise the EDA on all matters including, but not limited to, maintenance of the budget and master project schedule. Contractual Information & Recommendations • Oversee the work on the project and identify as early as possible any circumstances that might impact the master project schedule and/or budget Operations Director Statutory #7 • Seeking financial support for the DMCC, the City and a project Statutory #14 • Making other general advisory recommendations to the DMCC and the City, as requested Contractual Project Management • Manage EDA's Consultants and monitor their performance and progress Contractual Project Management • Coordinate and manage the DMC initiative focusing on the goals of maintain the approved budget and master project schedule Contractual Information & Recommendations • Provide recommendations to the DMCC on critical project decisions in writing with sufficient detail to enable the DMCC to make informed decisions Contractual Informational & Recommendations • Meet and provide progress reports and updates to the DMCC monthly and submit a monthly report. Contractual Project Reporting • Act as secretary to the DMCC and be responsible for: posting notices, agendas, meeting information and preparing meeting minutes. Contractual Project Reporting • Peer review of funding requests, project financing and construction progress and payment requests against industry standard norms and reporting to DMCC and City Senior Financial Manager Contractual Project Management • Hold and manage subconsultant contracts and monitor compliance with applicable law, approved budget, master project schedule, insurance requirements, and licensing requirements. Contractual Project Budget Management • Identify and present cost savings opportunities over the course of the project and confer the DMCC periodically to determine whether there are areas where costs can be reduced Contractual Accounting • Review, comment upon and otherwise assist the DMCC Treasurer, Assistant Treasure, State agencies and/or City in review of accounting records and/or audits\ Contractual Reporting • Report project activities and track activities against adopted milestones and objectives Contractual Reporting • Auditing of DMC funding expenditures with reports to the DMCC and the City Contractual Reporting • Other Reports as Required The following outlines the primary statutory and contractual responsibilities that are attributable to each of the staff positions contemplated within the draft organizational structure. This structure is preliminary in nature and may be altered over time based on the input of the Executive Director and DMCC Board. 6 DMC 2015 OPERATING BUDGET & EDA WORK PLAN  PRELIMINARY OPERATING FRAMEWORK –STAFF ROLES & RESPONSIBILITIES 15 PRELIMINARY – FOR REVIEW AND COMMENT STAFF TYPE OF REQUIREMENT REFERENCE TO REQUIREMENT TYPE OF SERVICE Project Accountants Contractual Project Budget Management • Manage the budget for the project including monitoring and updating the budget monthly for the DMCC Contractual Accounting • Manage the accounting, processing of invoices, payments and reporting for all contracts executed for the DMC project including payments to the EDA and Subconsultnats Contractual Accounting • Review Invoices, submit master payment application and disburse payments Contractual Accounting • Prepare monthly progress report Targeted Business Administrator General Reporting • Tracking and reporting on workforce development requirements established for the project Development Associate/ Project Manager Statutory #12 • Assisting the DMCC or the City and others in applications for federal grants, tax credits and other sources of funding to aid both private and public development Contractual Reporting • Provide monthly reports and an annual report and/or update the DMCC and others as requested Contractual Reporting • Track and assist the City and Mayo on the annual certification of private investment within the DMC District Contractual Reporting • Track and report on project funding expenditures against the adopted Development Plan Contractual Reporting • Track and report on economic and fiscal impacts resulting in the DMC Development District Operational General • Assist Executive Director and Operations Director in the execution of DMC strategies, including the facillitation of transactions and projects Financial Analyst(s) General Assistance with Financial Matters • Assisting with running financial models, peer review of pro formats/financial matters, tracking of information, market analysis and other Contractual Reporting • Track and report on economic and fiscal impacts resulting in the DMC Development District Marketing & Communications Manager Statutory #10 • Preparing and supporting the marketing and promotion of the medical center development district. Contractual Project Management • Coordinate with the City, the County, Mayo Clinic and the DMCC and other regional planning groups to facilitate planning the execution of the DMC Initiative Community Relations Coordinator Statutory #11 • Preparing and implementing a program for community and public relations in support of the medical center development district Communications Associate General Assistance with Marketing Matters • Management of the Web Site, Social Media, Blog and other electronic strategies to facilitate DMC marketing Administrative Staff General Administrative Assistance • Managing the office/hr (one person) and supporting the staff of the EDA and assisting with the facilitation and posting of materials 7 DMC 2015 OPERATING BUDGET & EDA WORK PLAN  PRELIMINARY OPERATING FRAMEWORK –STAFF ROLES & RESPONSIBILITIES EDA 2015 Work Plan 17 PRELIMINARY – FOR REVIEW AND COMMENT The target date for approval of the DMC Development Plan in February 2015. Currently, the planning team is in the process of developing the component parts of the DMC Development Plan which will establish the land planning, economic development, marketing and financial framework and strategies forthe DMC Initiative. Included as part of the plan there will be a phasing strategy, funding priorities and guidelines, a 5-year operating and 5-year capitalplan outlining the strategies for the project in more detail. Once approved, the EDA will implement theses strategies in accordance with their contract andthe approved plan. The major activities that are anticipated to occur in the first year of operations include: Activities and Targeted Dates for Completion: Facilitate and manage the final approval of the DMC Development Plan Q1 Initiate plans to educate/inform stakeholders and the public on the final approved DMC Development Plan, and processes Q1 (Start) / On-Going Launch global market strategy to secure Rochester and Southeast Minnesota as a Destination Medical Community Q1 (Start) / On-Going Formalize partnership and joint marketing initiatives with Mayo Clinic for research/bio-science and health/wellness strategies Q1 (Start) / On-Going Establish coordination committee with key community partners (e.g. Mayo, Chamber, RAEDI, RDA and RCVB) Q1 With approval of Development Plan, manage implementation of specific strategies / project goals Q2 (Start) / On-Going As appropriate, Identify and assist in preparation of early DMC funding applications to prepare for initial approvals Q1 (Start) / On-Going Update, as necessary, the EDA Work Plan to reflect the specific strategies of the DMC Development Plan Q2 (Start) / On-Going With approval of Development Plan, assist with DMC funding applications / evaluate for DMCC Board and City (if requested) Q2 (Start) / On-Going With approval of Development Plan establish regional, national and global resource network to assist with information/data collection and marketing Q2 (Start)/ On-Going Based on approved Development Plan strategies, finalize relationship and partnerships with Mayo Clinic and community organizations to advance research/bio-science, wellness and tourism initiatives consistent with identified priorities Identify and pursue potential partnerships, tenants and/or investors in the market based on targeted growth sectors Q2 (Start) / On-Going Identify and work on strategies to mitigate potential funding gaps for venture capital Q3 (Start) / On-Going Initiate strategies to attract, grow and retain a top-tier workforce in market based on targeted growth sectors Q3 (Start) / On-Going Initiate strategies for targeted business and workforce initiatives Q2 (Start) / On-Going Prepare annual report for community Q4 DMC 2015 OPERATING BUDGET & EDA WORK PLAN  2015 EDA WORK PLAN 18 PRELIMINARY – FOR REVIEW AND COMMENT Continue Technical Committee Meetings with City/County staff to discuss planning and potential projects On-Going On-Going project accounting and reporting activities as required by the DMCC/EDA contract On-Going On-Going administrative and management activities as required by the DMCC/EDA contract On-Going Specific Milestone Dates/Activities: Assist DMCC/City with preparation of annual report By February 15th Prepare Certification of Mayo Clinic and Private Investment Certification By April 1st Assist DMCC with Report to DEED – Open Appointments, Annual Report Compilation By July 15th EDA 2016 Operating Budget and Work Plan Submission By August 1st Assist DMCC with Submission of 2015 DMC Budget to City By September 1st This work plan is preliminary in nature and is subject to change as additional information becomes available related to the final Development Plan, strategies and priorities. DMC 2015 OPERATING BUDGET & EDA WORK PLAN  2015 EDA WORK PLAN EDA Proposed 2015 Operating Budget 20 PRELIMINARY – FOR REVIEW AND COMMENT DMC 2015 OPERATING BUDGET & EDA WORK PLAN  2015 OPERATING BUDGET –ESTIMATED STAFF COSTS Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec 2015 Total (Rounded '000) STAFF COSTS Payroll Escalation 1.25%    Payroll $70,667 $70,667 $70,667 $70,667 $70,667 $80,667 $80,667 $80,667 $80,667 $80,667 $80,667 $80,667 $918,000   Other Expenses, Benefits, Vacations, Deductions 40% $28,267 $28,267 $28,267 $28,267 $28,267 $32,267 $32,267 $32,267 $32,267 $32,267 $32,267 $32,267 $367,200  Total  Staff Costs (Rounded to Nearest '000)$98,933 $98,933 $98,933 $98,933 $98,933 $112,933 $112,933 $112,933 $112,933 $112,933 $112,933 $112,933 $1,285,000 MONTHLY OPERATING COSTS Rent, Utilities, Office & Equipment Expenses $12,358 $12,358 $12,258 $12,258 $12,508 $12,508 $12,508 $12,508 $12,509 $12,509 $12,359 $12,359 $149,000 Payroll Expenses $628 $628 $628 $628 $628 $628 $628 $628 $628 $628 $628 $628 $8,290 Website, Drafting and Graphics Support $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $45,000 Micellaenous Costs $1,667 $1,667 $1,667 $1,667 $1,667 $1,667 $1,667 $1,667 $1,667 $1,667 $1,667 $1,667 $20,000 Subtotal (Rounded To Nearest '000)$18,000 $18,000 $18,000 $18,000 $19,000 $19,000 $19,000 $19,000 $19,000 $19,000 $18,000 $18,000 $222,000 TOTAL EST. MONTHLY EXP. (EST. ADVANCED FUNDS) $116,933 $116,933 $116,933 $116,933 $117,933 $131,933 $131,933 $131,933 $131,933 $131,933 $130,933 $130,933 $1,507,000 MARKETING COSTS Advertising, Marketing, Print & Collateral $150,000 Subcriptions/Professional Organization Memberships $6,000 Conferences, Meetings, Travel, Sponsorships & Programs $85,000 Micellaneous  Costs $20,000 Subtotal $261,000 EDA BOARD MEETINGS & COMMUNITY MEETINGS  Room Rentals (Board Meetings  & Community Meetings)$9,000 Micellaenous Costs $3,000 Subtotal $12,000 SERVICE PROVIDERS Legal  $75,000 Public Relations & Communications $180,000 Marketing  & Advertising $75,000 Finanical & Reporting Consultants (e.g. tax, audit, econ‐fiscal, etc.)$125,000 Other Contracted Services $100,000 Subtotal $555,000 OTHER COSTS AND EXPENSES Insurance & Taxes $150,000 Micellaneous  Costs / Contingency $30,000 Subtotal $180,000 TOTAL $2,515,000 ESTIMATED MONTHLY EXPENSES ‐ 2015 The proposed EDA operating budget for calendar year 2015 is outlined below. *Note: This budget assume the Preliminary Development Plan is complete in December 2014 and that additional planning services are not required in the 2015 calendar year. If the schedule is extended, or such services are required, the budget will need to be modified to address these specific needs. Note: This budget does not include the additional costs identified for professional services contingency and web services. EDA Proposed Capital Improvement Plan 22 PRELIMINARY – FOR REVIEW AND COMMENT The DMC Development Plan is targeted to completed in February 2015 and a 5 Year Capital Improvement Plan is anticipated to be incorporated and approved at that time. The Development Plan is updated every 5 years in accordance with the DMC Law. The Capital Improvement Plan will be updated every year in accordance the agreements between the City, DMCC and EDA. DMC 2015 OPERATING BUDGET & EDA WORK PLAN  CAPITAL IMPROVEMENT PLAN DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY (EDA) UPDATE - TARGETED BUSINESS STRATEGY REPORT DATE: SEPTEMBER 11, 2014 In July 2014, the DMCC Board requested that representatives of the DMCC, EDA and City continue to work together to advance the strategies related to targeted business initiatives associated with the DMC Initiative. Since that time, the following has been accomplished: Adoption of Interim City M/WBE Policy On July 21, 2014 the Common Council of the City of Rochester unanimously approved an interim M/WBE policy related to the potential financing of DMC projects in the City of Rochester. A copy of the adopted policy is attached with this report. The City policy will be reviewed upon the completion of the draft DMC targeted business strategy to ensure coordination among efforts. Meeting with Department of Human Rights Representatives of the City, DMCC and EDA met with the Commissioner of the Minnesota Department of Human Rights and with representatives of the Governor’s Office to collect information on trends, programs and other considerations that may influence the development of strategies related to the DMC targeted business programs. Interviews and Information Collection with Stakeholder Groups Representatives of the City, DMCC and EDA met with stakeholder groups to understand the programs and activities that are already occurring in the local / regional market and identify potential groups to partner with in the future. The groups included: Randy Johnson : Workforce Development, Inc. Arianna Bush : Workforce Development, Inc. Dr. Jim Gross : Rochester Community and Technical College Paul Fleissner : Olmsted County Community Services Heidi Walsh : Olmsted County Community Services Kolloh Nimley : Council on Black Minnesotans Edward McDonald : Council on Black Minnesotans Donavan Bailey : NAACP W.C. Jordan : NAACP Rebecca Sedarski : Chicano Latino Affairs Council Julissa Viveros : Latino Economic Development Center Jerry Williams : Rochester Chamber of Commerce/Supplier Diversity Initiative Kevin Lindsey : Commissioner, Minnesota Department of Human Rights Recommended Next Steps The recommended next steps in the process are: • Workgroup to continue to meet and advance strategic plan based on data collected to date. • Workgroup to meet with representatives of the DMCC Board to vet strategies • Provide preliminary recommendations to DMCC Board at November meeting DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY (EDA) MONTHLY UPDATE REPORT REPORT DATE: SEPTEMBER 11, 2014 MASTER PROJECT BUDGET The following is a summary of the sources and uses of funds included in the current payment application. This summary represents the approximately $7.3 M portion of the budget and/or expenses that are managed and reported by the EDA. The balance of funding (approximately $886,000 for a total budget of $8.205 M) is DMCC and City of Rochester funding and managed outside of the EDA budget. • A summary of the sources and uses of funds as of Map #5 (July) is included above. A detailed cost report is also attached with this update. • MAP #1 - #5 are processed. Map #6 (August) was submitted to City/DMCC on September 10, 2014. • The 2015 DMC Operating Budget and EDA Work Plan have been submitted to the DMCC for review and approval at the September 11, 2014 DMCC Board Meeting. If approved, the budget will be forwarded to the City of Rochester to review during its budget process in the fall 2014. • The EDA is operating within budget and no major budgetary risks for the 2014 calendar year are known at this time. MASTER PROJECT SCHEDULE / DEVELOPMENT PLAN PROCESS • The DMC Development Plan remains on schedule. The major phases of work include the following: − Creative Analysis Phase: Completed in June 2014 − Options Phase: Target Completion in September 2014 − Preliminary Plan Phase: Target Completion in November 2014 (Strategies) and December 2014 (Full Draft). Once approved by the DMCC Board, the plan will be submitted to the City of Rochester. − 60-Day City of Rochester Review Process: Target – January 2015 – February 2015 − Targeted approval of the Development Plan: February 2015 • A Milestone Schedule for the 2014 (Remaining) / 2015 calendar years is attached. • An outline of the major topics to be considered at EDA and DMCC Board Meetings in the coming months is attached with this report. • The next DMCC Board Meeting and DMCC/EDA Working Session will be held on November 13, 2014. PROJECT FINANCE / FINANCIAL MANAGEMENT • The EDA, DMCC and City have executed a term sheet outlining the major terms and conditions of the Amendment to Advance Funds. The full contracts are under negotiation. • The City and DEED are working to finalize their agreement related to the flow of funds. The deadline for completion is September 2014. SOURCES OF FUNDS City Contribution $7,319,000.00 40 Development Costs $1,494,819.20 50 Financing Costs 60 Other Project Costs 90 Project Contingency Remaining Budget $5,824,180.80 TOTAL SOURCES $7,319,000.00 $7,319,000.00 USES OF FUNDS TOTAL USES DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY (EDA) MONTHLY UPDATE REPORT DEVELOPMENT PLAN – PROCESS/DESIGN/PLANNING • The EDA has advanced plans from the conceptual phase and established the program/phasing models for the project. In turn, these models are becoming the basis of the economic-fiscal analysis and financial framework for the project. The EDA is evaluating the options within the financial framework to establish the draft finance plan and business strategies for the DMC Initiative. The advancement of the planning concepts and an overview of the financial framework will be discussed at the EDA/DMCC Joint Board Session. • The EDA has continued meetings with the City Technical Committee and met with the City’s Comprehensive Plan Team on August 6, 2014. This City is embarking on the comprehensive plan process, which is estimated to be completed over an 18-24 month period. The EDA Team will continue to coordinate with the Comprehensive Plan Team through the completion / approval of the Development Plan. • The EDA Planning team is in the process of meeting with City staff and departments to vet the concepts as they advance and identify/resolve potential issues going forward. Meetings will continue through the completion of the plan in 2014. • The EDA held briefings for City Council and County Board members on August 5, 2014. In general, both the City Council and County Board responded favorably to the concepts presented in the Creative Analysis. They were particularly interested in further analysis of the demand models and proposals for mode shift to transit options. They uniformly stressed the importance of grounding the plan in an economic model and framework that not only considered the cost to build proposed projects but also the costs to operate/maintain the project. The planning team is currently finalizing the requested analysis and is advancing the financial framework / economic analysis. Meetings are being set up to continue briefings with the City Council and County Board in October, 2014. • The planning team continued to meet with stakeholder groups including working with Mayo Clinic to coordinate strategic planning for bio-science initiatives. The EDA also met with representatives from the surrounding neighborhoods to understand concerns related to potential direct impacts of the DMC Plan on these residential areas. COMMUNITY INPUT PROCESS • The EDA retained a community input consultant to advice on the process as the plan advances over the next several months. This consultant is the same consultant working on the City’s Comprehensive Plan which provides for the opportunities for increased synchronization between the two processes. • The EDA continues on-going outreach activities including website updates, blogs, a bi-weekly newsletter and presentations within the community and the region. • A public forum is being held September 11, 2014, 6:30 pm – 9:00 pm. TARGETED BUSINESS /WORKFORCE • The EDA continues its work with the City of Rochester and DMCC Board to establish a planning framework for targeted business and workforce initiatives. • The City of Rochester has approved an interim M/WBE strategy which establishes targeted workforce goals of 4% minority and 6% women owned businesses. These targets are based on MNDOT’s standards for the SE Minnesota region. OPERATIONS • EDA is continuing the search process for Executive Director. • EDA submitted a budget for the 2015 calendar year and is in the process of launching EDA operations to prepare for permanent staff (e.g. establishing benefits, identifying office space, etc.) DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY (EDA) MONTHLY UPDATE REPORT KEY CONSIDERATIONS/IDENTIFIED RISKS  Advancement of Plan Concepts. In September the planning team needs feedback from EDA/DMCC Boards and direction from EDA on advancement of the following, which serve as the foundation of the Development Plan:  Guiding Principals  DMC Districts and Conceptual Plan  Program and Phasing Models  Primary Transit Strategies and Framework  DMC Development District Boundary  Coordination with Comprehensive Plan. The comprehensive plan is in its initial phases. The DMC Development Plan will be largely complete before the comprehensive plan completes is initial analysis. Coordination between the two planning teams is critical but there could be unknown issues that impact the timing of the plan. Both teams are committed to coordination to resolve and/or mitigate any potential issues.  Third Party Impacts. Potential impacts from third parties (state agencies, political climate, etc.) could impact the schedule; EDA is already experiencing this with inability to hire permanent staff.  Execution of Agreements. The City/DEED Agreement and Working Capital Loan Agreements between City, DMCC and EDA are currently being negotiated. The EDA is coordinating its retention of permanent staff to coincide with the completion of these agreements and has shifted expected retention of full staff from 2nd/3rd quarter of this year to the end of the year. MAJOR ACCOMPLISHMENTS LAST 60 DAYS: The following provides an outline of the tasks completed in the last 60 days. • Draft Guiding Principles • Final Creative Analysis and Draft Options For Master Plan • Draft Transit Framework • Preliminary Market Analysis & Program Recommendations • Framework/Methodology for Economic-Fiscal Baseline • Framework for Financial Models • Coordination with City Comprehensive Plan Team and City/EDA Technical Team • Draft DMC 2014 Budget and EDA Work Plan • Stakeholder Discussions On Targeted Business/Workforce Initiatives • Community Conversations on June 12th • Second Public Forum on July 10th • Working Capital Loan Term Sheet Complete MAJOR TASKS TO BE COMPLETED OVER NEXT 60 DAYS: The following provides an outline of the anticipated tasks to be completed in the next 60 days. • Conceptual Master Plan • Conceptual Transit Plan • Conceptual Infrastructure Plan • Economic-Fiscal Analysis • Initial Finance Plan / Finance Strategy • Draft Marketing Plan • Draft Business Plan • Draft Operations Plan (5 Years) • Draft Targeted Business Framework • DMCC Board Meetings on November 13th • 3rd Public Forum on November 13th • Working Capital Loan Complete DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY (EDA) MONTHLY UPDATE REPORT COST REPORT DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY (EDA) MONTHLY UPDATE REPORT MILESTONE DATES The following provides an outline of the major milestone dates for the project known as of the date it was issued. This milestone schedule is not meant to be a comprehensive document and does not represent all meetings/calls, actions, tasks or deadlines associated with the project. The schedule is subject to change without notification. Calendar Year 2014 (Remaining) Date Milestone Schedule September 10th City Technical Committee Meeting (Review of Documents) Due Date: EDA Payment Application #6 to DMCC for Approval (City Copied) September 11th DMCC Board Meeting Joint Working Session of EDA-DMCC Boards Public Forum September 23rd Preferred Date #1 – DMCC/EDA Best Practice Trip (Return on 26th) September 30th Preferred Date #2 – DMCC/EDA Best Practice Trip (Return on 3rd) Due Date: Execution of City Agreement with DEED October 8th City Technical Committee Meeting (Incudes Joint Meeting with City Staff and City Departments) October 10th Due Date: EDA Payment Application #7 Submitted to DMCC for preliminary review/approvals November 10th Due Date: EDA Payment Application #8 Submitted to DMCC for preliminary review/approvals November 12th City Technical Committee Meeting November 13th DMCC Board Meeting EDA/DMCC Joint Planning Session Public Forum December 10th Due Date: EDA Payment Application #9 Submitted to DMCC for preliminary review/approvals December 17th DMCC Board Meeting to Approval Preliminary Draft Plan (Tentative - Date to Be Confirmed) Calendar Year 2015 Date Milestone Schedule January 5th Due Date: EDA Payment Application #10 Submitted to EDA for preliminary review/approvals January 10th Due Date: EDA Payment Application #10 Submitted to DMCC for preliminary review/approvals January 31st Target Date: EDA completes Annual Report for review by DMCC Board, DMCC Board submits February 15th (See Below) February 1st Due Date: Additional budget recommendations from DMCC to City (if budget is not approved in previous year) February 3rd Due Date: EDA Payment Application #11 Submitted to EDA for preliminary review/approvals February 10th Due Date: EDA Payment Application #11 Submitted to DMCC for preliminary review/approvals February 15th Due Date: DMCC/City Submit Annual Report to DEED February 25th DMCC Board Meeting to Adopt Plan (Note: Meeting Needs to Be Scheduled/Date Confirmed) March 3rd Due Date: EDA Payment Application #12 Submitted to EDA for preliminary review/approvals March 10th Due Date: EDA Payment Application #12 Submitted to DMCC for preliminary review/approvals March 1st Target Date: Completion of McGladry Review of Mayo Clinic Investments March TBD EDA Board Meeting: Any Final Actions on Development Plan / Approval of 2014 Investment Certification March 5th Due Date: EDA Payment Application #12 Submitted to EDA for preliminary review/approvals March 10th Due Date: EDA Payment Application #12 Submitted to DMCC for preliminary review/approvals April 1st Due Date: Submittal of 2014 Certification of Investment to DEED April 5th Due Date: EDA Payment Application #13 Submitted to EDA for preliminary review/approvals April 10th Due Date: EDA Payment Application #13 Submitted to DMCC for preliminary review/approvals May 5th Due Date: EDA Payment Application #14 Submitted to EDA for preliminary review/approvals May 10th Due Date: EDA Payment Application #14 Submitted to DMCC for preliminary review/approvals June 5th Due Date: EDA Payment Application #15 Submitted to EDA for preliminary review/approvals June 10th Due Date: EDA Payment Application #15 Submitted to DMCC for preliminary review/approvals July 5th Due Date: EDA Payment Application #16 Submitted to EDA for preliminary review/approvals July 10th Due Date: EDA Payment Application #16 Submitted to DMCC for preliminary review/approvals July 15th Due Date: DMCC report to DEED – Open Appointments, Annual Report Compilation DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY (EDA) MONTHLY UPDATE REPORT August 1st Due Date: 2016 EDA Operating Budget Submittal to DMCC Due Date: DEED Certification of Amount of GSIA August 5th Due Date: EDA Payment Application #17 Submitted to EDA for preliminary review/approvals August 10th Due Date: EDA Payment Application #17 Submitted to DMCC for preliminary review/approvals September 1st Due Date: DMCC to Submit 2016 DMC Budget Request to the City of Rochester (Note includes DMCC, EDA and City Budgets) Due Date: DEED to Provide GSIA Funding to City September 5th Due Date: EDA Payment Application #18 Submitted to EDA for preliminary review/approvals September10th Due Date: EDA Payment Application #18 Submitted to DMCC for preliminary review/approvals October 5th Due Date: EDA Payment Application #19 Submitted to EDA for preliminary review/approvals October 10th Due Date: EDA Payment Application #19 Submitted to DMCC for preliminary review/approvals November 5th Due Date: EDA Payment Application #20 Submitted to EDA for preliminary review/approvals November 10th Due Date: EDA Payment Application #20 Submitted to DMCC for preliminary review/approvals December 5th Due Date: EDA Payment Application #21 Submitted to EDA for preliminary review/approvals December 10th Due Date: EDA Payment Application #21 Submitted to DMCC for preliminary review/approvals DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY (EDA) MONTHLY UPDATE REPORT OUTLINE OF DISCUSSIONS / ACTIONS AT DMCC BOARD MEETINGS & EDA/DMCC WORKING SESSION The following is a preliminary list of the items that may be discussed during the scheduled board meetings. Please note, this outline is preliminary in nature and is subject to change without notification. September • 2015 EDA Operating Budget and Work Plan (DMCC) • Review Concept Plans (Options) – Select Direction for Preliminary Development Plan • Preliminary Draft of Phasing Strategies • Economic / Fiscal Baseline Methodologies • Approach to Targeted Business Framework / Next Steps November • Preliminary Draft of Master Plan/Infrastructure Plan/Transportation Plan • Preliminary Draft of Business Development Strategy • Preliminary Draft of Marketing Strategy • Preliminary Draft of Communications/Community Input Strategy • Preliminary Draft of Finance Plan • Preliminary Draft of Funding Agreements December • EDA/DMCC Approval of Preliminary Development Plan January/February • City Approvals – Process TBD February • DMCC Approval of Final Plan