Capital Improvement Plan
Many areas of the sidewalks in downtown are degrading over time, especially surrounding brick inlays that were installed as part of an
outdated standard detail used before passage of the ADA. Cracks and brick popͲouts are a safety hanjard and generate trip/fall complaints
at a much higher rate than other pedestrian facilities. These calls spur repeated temporary maintenance that doesnΖt solve the underlying
performance issues. The reconstruction will include ADA improvements, consideration of increased public realm space, and other
aesthetic integration aspects.
Broadway Ave, Ϯnd Street SE, and ϯrd Street SW.
Public Works
ϮϱϬ
Ward ϰ
Reconstruct downtown sidewalks on Broadway Ave, Ϯnd Street SE and ϯrd Street SW.
Public Safety
ϴ6ϬϬ
Downtown Sidewalk Experience Enhancement
Enhance Yuality of Life, Balance Public Infrastructure Investment
Design
Not Applicable
ϮϬϮϭ
Tyler S Niemeyer
Destination Medical Center
Ϭ
99
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Project Cost Breakdown Row Total:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
ϴϰϴ,ϯϳϱ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Construction
ϴϰϴ,ϯϳϱ
ϮϬϮϭ
Ϭ
Existing
ϴϰϴ,ϯϳϱ
Ϭ
Ϭϴϰϴ,ϯϳϱ
Ϭ
Ϭ
Ϭ
ϮϬϮ6
ϴϰϴ,ϯϳϱ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϴϰϴ,ϯϳϱ
Maintains and improves walkability of downtown. Addresses a public safety issue.
ϮϬϮϭ
ϴϰϴ,ϯϳϱ
ϮϬϮϱ
Ϭ
ϬϬ
Ϭ
ϴϰϴ,ϯϳϱ
Ϭ
Will greatly reduce ongoing temporary maintenance measures and decrease staff time needed to respond to high trip/fall rates.
ϱϬ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
State DMC Funds
Ϭ Ϭ
ϮϬϮϯ
100
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
Enhance the downtown experience for citinjens, visitors and businesses by creating an inviting, exciting and accessible river front area.
Destination Medical Center
City Administration
Ϯϴϯ
NA
Efforts to evolve and enhance the river front areas in and near the downtown area which would include connectivity to downtown,
development along the river front as well as amenities and activities.
Fiscal Responsibility & Sustainability, Social Equity
River Front Reimagined
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
Destination Medical Center CIP (BU ϴ6ϬϬ)
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
101
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
ϭ,ϬϬϬ,ϬϬϬ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Implementation
ϭ,ϬϬϬ,ϬϬϬ
ϮϬϮϭ
Ϭ
New
6,ϬϬϬ,ϬϬϬ
Ϭ
Ϭϭ,ϬϬϬ,ϬϬϬ
ϱ,ϬϬϬ,ϬϬϬ
Ϭ
ϱ,ϬϬϬ,ϬϬϬ
ϮϬϮ6
6,ϬϬϬ,ϬϬϬ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
6,ϬϬϬ,ϬϬϬ
The river front efforts would be in alignment with both the DMC and City development plans.
ϮϬϮϭ
6,ϬϬϬ,ϬϬϬ
ϮϬϮϱ
Ϭ
ϬϬ
Ϭ
ϭ,ϬϬϬ,ϬϬϬ
ϱ,ϬϬϬ,ϬϬϬ
Operating costs must be considered at the time the funds are being considered for investing in a related project.
Operating costs must be considered at the time the funds are being considered for investing in a related project.
ϳϱ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
State DMC Funds
ϱ,ϬϬϬ,ϬϬϬ Ϭ
ϮϬϮϯ
102
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
The information collected can help provide data to city teams, leadership and City Council to help with decisionͲmaking and prioritinjation
of managing assets, resources and services and identifying areas of opportunity.
Destination Medical Center
City Administration
ϮϴϮ
NA
A smart city is an urban area that uses different types of electronic Internet of things sensors to collect data and then use insights gained
from that data to manage assets, resources and services efficiently, in return using that data to better improve the operations across the
city. The consulting services will assist with multiple aspects of creating a project plan to place sensors, collect data, analynje information,
etc.
Compassion, Environmental Stewardship, Fiscal Responsibility & Sustainability, Public Safety, Social Equity
ϴ6ϬϬ
Smart Cities Consultation
Enhance Yuality of Life, Foster a TeamͲOriented Culture, Manage 'rowth and Development, Balance Public Infrastructure Investment
Destination Medical Center CIP (BU ϴ6ϬϬ)
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
103
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
Ϭ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Consulting or Study
Ϭ
ϮϬϮϭ
Ϭ
New
ϭϬϬ,ϬϬϬ
Ϭ
ϬϬ
ϭϬϬ,ϬϬϬ
Ϭ
ϭϬϬ,ϬϬϬ
ϮϬϮ6
ϭϬϬ,ϬϬϬ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϭϬϬ,ϬϬϬ
The project supports the DMC Development Plan as well as the cityΖs Strategic Plan.
ϮϬϮϭ
ϭϬϬ,ϬϬϬ
ϮϬϮϱ
Ϭ
ϬϬ
Ϭ
Ϭ
ϭϬϬ,ϬϬϬ
The consulting engagement will not actually result in physical assets, but rather recommendations for us to consider investing in.
ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
Sales Tax DMC
ϭϬϬ,ϬϬϬ Ϭ
ϮϬϮϯ
104
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
To achieve the vision and goals set forth in the Destination Medical Center (DMC) Development Plan.
Destination Medical Center
City Administration
Ϯϭϵ
NA
Located on Ϯnd street SW, St. MaryΖs Place establishes a civic square and monumental gateway at one of the primary entry points to
Rochester. The plan incorporates a circulator that connects the St. MaryΖs campus to the downtown. It also embraces its relationship to
the surrounding neighborhoods creating a town square that connects <utnjky Park to St. MaryΖs Park and the ,istoric Pill ,ill
neighborhood.
Fiscal Responsibility & Sustainability, Social Equity
St. MaryΖs Place Public Realm
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
City Administration
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
105
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
Ϭ
Ϭ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Architect/Design
Construction
Ϭ
ϮϬϮϭ
Ϭ
Existing
ϯ,ϯϬϬ,ϬϬϬ
ϯ,ϬϬϬ,ϬϬϬ
ϬϬ
ϯϬϬ,ϬϬϬ
Ϭ
ϯ,ϬϬϬ,ϬϬϬ
ϯϬϬ,ϬϬϬ
ϮϬϮ6
ϯϬϬ,ϬϬϬ
ϯ,ϬϬϬ,ϬϬϬ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϯ,ϯϬϬ,ϬϬϬ
DMC projects support the DMC Development Plan and take into consideration other City plans such as the comprehensive plan, bicycle
master plan, park master plan, etc.
ϮϬϮϭ
ϯ,ϯϬϬ,ϬϬϬ
ϮϬϮϱ
Ϭ
ϯ,ϬϬϬ,ϬϬϬ
Ϭϯ,ϬϬϬ,ϬϬϬ
Ϭ
Ϭ
ϯϬϬ,ϬϬϬ
As part of the design and implementation operations and maintenance costs will be considered and the City and DMC teams will evaluate
what sources are most appropriate to pay for any annual increase in operating costs.
ϱϬ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
State DMC Funds
ϯϬϬ,ϬϬϬ Ϭ
Ϭ
ϮϬϮϯ
106
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
The purpose of the 6th Street Bridge is to connect the Downtown Waterfront SE area to downtown to the west. With future
development planned for the former AMPI site, a 6th Street Bridge will permit future businesses and residents to the downtown area.
Over the South Fork of the umbro River
City Administration
Ϯϳ6
Ward Ϯ, Ward ϰ
The study, engineering and environmental development and construction of a vehicle bridge over the South Fork of the umbro River
connecting 6th Street SE to 6th Street SW at or near the intersection of 6th Street and South Broadway Avenue.
Environmental Stewardship
6th Street Bridge
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
DMC Corporation
Not Applicable
ϮϬϮϭ
Jarrett < ,ubbard
Destination Medical Center
Ϭ
107
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
ϭ,ϯϬϬ,ϬϬϬ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Consulting or Study
ϭ,ϯϬϬ,ϬϬϬ
ϮϬϮϭ
Ϭ
New
ϭ,ϯϬϬ,ϬϬϬ
Ϭϭ,ϯϬϬ,ϬϬϬ
Ϭ
Ϭ
ϮϬϮ6
ϭ,ϯϬϬ,ϬϬϬ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϭ,ϯϬϬ,ϬϬϬ
A pedestrian bridge connection is supported by the Rochester Downtown Mobility Plan.
The DMC Development plan states, ͞new 6th Street bridge connection will reduce intersection delay at Broadway and intersections
entering into downtown via ϰth Street SE and ϯrd Avenue SE/Civic Center Drive.͟
The TransitͲOriented Development (TOD) Station Area Planning study supports the development of a 6th Street Bridge to be supportive
of increased ridership onto Downtown Rapid Transit
ϮϬϮϭ
ϭ,ϯϬϬ,ϬϬϬ
ϮϬϮϱ
Ϭ
ϬϬ
Ϭ
ϭ,ϯϬϬ,ϬϬϬ
Annual regular maintenance
NATIONAL COOPERATIsE ,I',WAY RESEARC, PRO'RAM REPORT ϰϴϯ Ͳ Bridge LifeͲCycle Cost Analysis Page Ϯϵ
http://onlinepubs.trb.org/onlinepubs/nchrp/nchrpͺrptͺϰϴϯ.pdf
ϴϬ
ϬϬ
ϱϰ,ϬϬϬ
State DMC Funds
ϮϬϮϯ
108
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
To create a multiͲmodal gateway to downtown Rochester and DMC Development District and enhance economic development
opportunities.
Destination Medical Center
City Administration
ϮϮϳ
NA
This project is intended to begin the transformation of the Broadway Avenue corridor into a significant multiͲmodal gateway to
downtown Rochester and Destination Medical Center (DMC) Development District. It includes the complete reconstruction of North
Broadway from Civic Center Drive to ϭϯth St. North to serve all modes of transportation (walking, biking, bus and other vehicles).
Fiscal Responsibility & Sustainability, Public Safety, Social Equity
North Broadway Reconstruct
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
City Administration
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
109
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
ϵ,ϮϬϭ,ϯϮϱ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Construction
ϵ,ϮϬϭ,ϯϮϱ
ϮϬϮϭ
Ϭ
Ϭ
Existing
ϵ,ϮϬϭ,ϯϮϱ
Ϭ
Ϭ
Ϭ6,ϭϬϬ,ϬϬϬ
Ϭ
Ϭ
Ϭ
Ϭ
ϮϬϮ6
ϵ,ϮϬϭ,ϯϮϱ
ϯ,ϭϬϭ,ϯϮϱ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϯ,ϭϬϭ,ϯϮϱ
6,ϭϬϬ,ϬϬϬ
DMC projects support the DMC Development Plan and take into consideration other City plans such as the comprehensive plan, bicycle
master plan, park master plan, etc.
ϮϬϮϭ
ϵ,ϮϬϭ,ϯϮϱ
ϮϬϮϱ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϵ,ϮϬϭ,ϯϮϱ
Ϭ
Operating costs will likely initially decrease, but would be expected to increase marginally on average over the course of time as the
infrastructure ages.
ϳϱ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
State DMC Funds
Project Reserves
Ϭ Ϭ
ϮϬϮϯ
110
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
This project is driven by the need to support DMC growth. The project also reduces localinjed street flooding and sanitary sewer basement
backups that would occur with added runoff from DMC growth.
Destination Medical Center
City Administration
ϮϮϯ
NA
This project provides capacity upgrades to support growth in the St. MaryΖs Place district of Destination Medical Center (DMC). The
existing sanitary sewer and storm sewer located within the <utnjky Park Neighborhood is undersinjed and unable to carry the projected
flows from the
full development anticipated in and around St. MaryΖs ,ospital. Design has been completed. Construction is currently planned for ϮϬϮϭ.
Fiscal Responsibility & Sustainability
ϴ6ϬϬ
ϴ6ϭϭ
ϭϮth & ϭϯth Ave Sanitary & Storm Capacity Improvements
Manage 'rowth and Development
City Administration
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
111
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
ϯ,ϰϬϬ,ϬϬϬ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Construction
ϯ,ϰϬϬ,ϬϬϬ
ϮϬϮϭ
Ϭ
Ϭ
Ϭ
Existing
ϯ,ϰϬϬ,ϬϬϬ
Ϭ
Ϭ
Ϭ
ϬϮ,ϮϱϬ,ϬϬϬ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϮϬϮ6
ϯ,ϰϬϬ,ϬϬϬ
ϭϱϬ,ϬϬϬ
ϭ,ϬϬϬ,ϬϬϬ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϭϱϬ,ϬϬϬ
ϭ,ϬϬϬ,ϬϬϬ
Ϯ,ϮϱϬ,ϬϬϬ
DMC projects support the DMC Development Plan and take into consideration other City plans such as the comprehensive plan, bicycle
master plan, park master plan, etc.
ϮϬϮϭ
ϯ,ϰϬϬ,ϬϬϬ
ϮϬϮϱ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϯ,ϰϬϬ,ϬϬϬ
Ϭ
Operating costs are expected to increase marginally on average over the course of time.
ϭϬϬ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
Special Assessment Bonds
Operating Transfer ʹ From Sewer Utility
State DMC Funds
Ϭ Ϭ
ϮϬϮϯ
112
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
The concept of district energy has several benefits. It can replace less efficient systems and reduce our carbon footprint. A system such as
this would reduce cost and ongoing operations and maintenance fees, while providing an efficient, reliable, and carbonͲfree heating and
cooling source by ϮϬϯϬ. The concept could also work to improve aesthetics, provide more building space for programming instead of
mechanical equipment, reduce air pollution and emissions in Rochester, and the DES technology allows for further optiminjation with
renewable systems and other operational practices.
Destination Medical Center
City Administration
Ϯϴ6
NA
This project would add heating and cooling capacity to areas in the downtown Destination Medical Center district. Equipment evaluated
for this concept can create both heating and cooling energy simultaneously and in a very efficient manner.
Environmental Stewardship, Fiscal Responsibility & Sustainability, Public Safety
Downtown District Energy System
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
Destination Medical Center CIP (BU ϴ6ϬϬ)
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
113
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Project Cost Breakdown Row Total:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
ϮϬϬ,ϬϬϬ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Implementation
ϮϬϬ,ϬϬϬ
ϮϬϮϭ
Ϭ
New
Ϯ,ϬϬϬ,ϬϬϬ
Ϭ
ϬϮϬϬ,ϬϬϬ
ϭ,ϴϬϬ,ϬϬϬ
Ϭ
ϭ,ϴϬϬ,ϬϬϬ
ϮϬϮ6
Ϯ,ϬϬϬ,ϬϬϬ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
Ϯ,ϬϬϬ,ϬϬϬ
The project would be in alignment with long term strategies and the development plans of both the DMC and City of Rochester.
ϮϬϮϭ
Ϯ,ϬϬϬ,ϬϬϬ
ϮϬϮϱ
Ϭ
ϬϬ
Ϭ
ϮϬϬ,ϬϬϬ
ϭ,ϴϬϬ,ϬϬϬ
Operating costs and cost recovery shall be projected and considered as part of the implementation of this project.
ϱϬ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
State DMC Funds
ϭ,ϴϬϬ,ϬϬϬ Ϭ
ϮϬϮϯ
114
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
This project is driven by the need to support Destination Medical Center (DMC) growth in the downtown core. Added benefits include the
removal of a sanitary siphon that is experiencing additional maintenance due to the DMC growth.
Destination Medical Center
City Administration
ϮϮϱ
NA
This relief project diverts flows from Ϯnd Street SW to ϰth Street SW along ϯrd Avenue SW to provide added capacity to the
trunk sewers to the north of Ϯnd Street SW. Conceptual design is complete. Formal design planned for ϮϬϮϯ and construction planned
for ϮϬϮϰ.
Fiscal Responsibility & Sustainability
ϯrd Ave SW Sewer Capacity Bypass
Manage 'rowth and Development
City Administration
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
115
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
Ϭ
Ϭ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Architect/Design
Construction
Ϭ
ϮϬϮϭ
Ϭ
Ϭ
Existing
ϯ,ϭϬϬ,ϬϬϬ
ϭϬϬ,ϬϬϬ
Ϭ
ϬϬ
Ϭ
Ϭ
ϭϬϬ,ϬϬϬ
Ϭ
Ϭ
ϮϬϮ6
ϭϬϬ,ϬϬϬ
ϯ,ϬϬϬ,ϬϬϬ
Ϭ
ϯ,ϬϬϬ,ϬϬϬ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϭ,ϱϱϬ,ϬϬϬ
ϭ,ϱϱϬ,ϬϬϬ
DMC projects support the DMC Development Plan and take into consideration other City plans such as the comprehensive plan, bicycle
master plan, park master plan, etc.
ϮϬϮϭ
ϯ,ϭϬϬ,ϬϬϬ
ϮϬϮϱ
ϭϬϬ,ϬϬϬ
Ϭ
ϭ,ϱϬϬ,ϬϬϬ
ϭ,ϱϬϬ,ϬϬϬ
ϱϬ,ϬϬϬ
ϱϬ,ϬϬϬ
Ϭ
Ϭ
Ϭ
This project replaces existing infrastructure and therefore minimally impacts operating costs. Initially, this will actually decrease
maintenance costs currently being incurred on the older infrastructure.
ϭϬϬ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϯ,ϬϬϬ,ϬϬϬ
Ϭϯ,ϬϬϬ,ϬϬϬ
Ϭ
Operating Transfer ʹ From Sewer Utility
State DMC Funds
Ϭ Ϭ
Ϭ
ϮϬϮϯ
116
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
To provide the payment/payback of $ϭ,6ϬϬ,ϬϬϬ annually until the payback of $ϴ,ϬϬϬ,ϬϬϬ is complete (final payment will be in ϮϬϮϯ).
Destination Medical Center
City Administration
ϮϯϬ
NA
These funds represent Destination Medical CenterΖs (DMC) repayment of a loan from the City of Rochester that were used to initiate
efforts in the beginning years of DMC related to the Integrated Transit Studies (ITS) performed.
Fiscal Responsibility & Sustainability
ϴ6ϬϬ
Integrated Transit Study Repayment
Manage 'rowth and Development, Balance Public Infrastructure Investment
City Administration
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
117
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
ϭ,6ϬϬ,ϬϬϬ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Consulting or Study
ϭ,6ϬϬ,ϬϬϬ
ϮϬϮϭ
Ϭ
Existing
ϰ,ϴϬϬ,ϬϬϬ
ϭ,6ϬϬ,ϬϬϬ
Ϭϭ,6ϬϬ,ϬϬϬ
ϭ,6ϬϬ,ϬϬϬ
ϭ,6ϬϬ,ϬϬϬ
ϭ,6ϬϬ,ϬϬϬ
ϮϬϮ6
ϰ,ϴϬϬ,ϬϬϬ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϰ,ϴϬϬ,ϬϬϬ
DMC projects support the DMC Development Plan and take into consideration other City plans such as the comprehensive plan, bicycle
master plan, park master plan, etc.
ϮϬϮϭ
ϰ,ϴϬϬ,ϬϬϬ
ϮϬϮϱ
ϭ,6ϬϬ,ϬϬϬ
Ϭϭ,6ϬϬ,ϬϬϬ
Ϭ
ϭ,6ϬϬ,ϬϬϬ
ϭ,6ϬϬ,ϬϬϬ
These were transit studies that were conducted in order to inform the City and Destination Medical Center about a transit plan, modes of
travel and numerous other aspects.
ϰ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
Sales Tax DMC
ϭ,6ϬϬ,ϬϬϬ Ϭ
ϮϬϮϯ
118
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
Arrive Rochester takes a leadership role in implementing Travel Demand Management efforts. Aim to reduce the number of people
driving alone to work in Rochester to ease traffic congestion and improve air quality.
Destination Medical Center
City Administration
Ϯϯϳ
NA
Provide new programs to make it easier for commuters to travel in carpools, by bus, on foot or by bike.
Environmental Stewardship, Fiscal Responsibility & Sustainability
Arrive Rochester
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
City Administration
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
119
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
6Ϭ,ϬϬϬ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Implementation
6Ϭ,ϬϬϬ
ϮϬϮϭ
ϵϭ,ϬϬϬ
New
ϰϳϱ,ϬϬϬ
ϳϱ,ϬϬϬ
ϵϵ,ϬϬϬ6Ϭ,ϬϬϬ
6ϳ,ϬϬϬ
ϳϱ,ϬϬϬ
6ϳ,ϬϬϬ
ϮϬϮ6
ϰϳϱ,ϬϬϬ
ϴϯ,ϬϬϬ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϰϳϱ,ϬϬϬ
DMC projects support the DMC Development Plan and take into consideration other City plans such as the comprehensive plan, bicycle
master plan, park master plan, etc.
ϮϬϮϭ
ϰϳϱ,ϬϬϬ
ϮϬϮϱ
ϳϱ,ϬϬϬ
ϴϯ,ϬϬϬϳϱ,ϬϬϬ
ϵϵ,ϬϬϬ
6Ϭ,ϬϬϬ
6ϳ,ϬϬϬ
Not applicable as the programs do not generate additional operating costs or reduce any operating costs in general.
ϭϬϬ
ϵϭ,ϬϬϬ
ϵϵ,ϬϬϬ
ϵϵ,ϬϬϬ
ϴϯ,ϬϬϬ
ϵϭ,ϬϬϬϴϯ,ϬϬϬ
Ϭ
Sales Tax DMC
6ϳ,ϬϬϬ ϵϭ,ϬϬϬ
ϮϬϮϯ
120
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
Implementation of the circulator route was a top priority of the Integrated Transit Studies. The circulator route is intended to develop a
costͲeffective transitway that increases transit use among corridor residents, commuters, businesses, patients, students, and visitors.
Also, to catalynje and support housing and economic development along the corridor. Last, to support healthy, active communities and
encourage sustainability.
Destination Medical Center
City Administration
Ϯϯϰ
NA
The Rochester Downtown Transit Circulator will provide high quality downtown public transportation service for residents, commuters,
businesses, patients, students, and visitors that will support the City of Rochester and Destination Medical Center (DMC) district
transportation, economic development, and livability goals and substantially increase public transportation use downtown.
Environmental Stewardship, Fiscal Responsibility & Sustainability, Public Safety, Social Equity
ϴ6ϬϬ
Rapid Transit Implementation
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
City Administration
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
121
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
ϱ,ϰϱϮ,ϬϬϬ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Implementation
ϱ,ϰϱϮ,ϬϬϬ
ϮϬϮϭ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϭ,6ϵϰ,ϬϬϬ
New
ϭϭϬ,ϵϵϴ,ϬϬϬ
Ϭ
ϯϬ,ϳϬ6,ϬϬϬ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϮϬϬ,ϬϬϬ
Ϯϴ,6ϴϳ,ϳϳϱ
ϯϳ,ϵϵϱ,ϬϬϬ
ϯϬ,ϳϬ6,ϬϬϬ
Ϭ
ϵ,Ϭϭϳ,ϳϰϴ
ϭϯ,ϱϮ6,6ϮϮ
Ϭ
Ϭ
ϰ,ϬϰϬ,Ϯϳϳ
ϭϭ,ϰϭϬ,ϯϱϯ
ϮϬϮ6
ϭϭϬ,ϵϵϴ,ϬϬϬ
Ϯ,ϭϬϬ,ϴϬϬ
ϯ,ϭϱϭ,ϮϬϬ
Ϭ
Ϭ
Ϭ
Ϭ
ϯϱ,ϭϱϭ,ϬϬϬ
ϮϬϮ6ϮϬϮϰ
ϭϵ,ϭϮϱ,ϭϴϱ
ϮϬϮϮ
ϮϮϱ,ϬϬϬ
ϳϱϬ,ϬϬϬ
ϭϱϬ,ϬϬϬ
ϱ,ϳϳϯ,ϳϰϬ
ϱ6,Ϯϴ6,ϯϬϬ
DMC projects support the DMC Development Plan and take into consideration other City plans such as the comprehensive plan, bicycle
master plan, park master plan, etc.
ϮϬϮϭ
ϭϭϬ,ϵϵϴ,ϬϬϬ
ϮϬϮϱ
ϯ,ϴϬϳ,ϬϮϰ
ϯϬ,ϳϬ6,ϬϬϬ
Ϭ
ϭ,ϰϴϬ,ϰ6ϯ
Ϯϰ,ϭϱϮ,ϵϳϵ
Ϭ
ϰ,ϭϵϵ,6ϭϯ
6,Ϯϵϵ,ϰϭϵ
ϮϮϱ,ϬϬϬ
ϳϱϬ,ϬϬϬ
ϭϱϬ,ϬϬϬ
Ϯϱϯ,ϬϬϬ
ϭϴ,ϴϮϴ,ϵ6ϴ
Ϭ
ϱ,ϳϭϬ,ϱϯϰ
ϱ,ϰϱϮ,ϬϬϬ
ϯϳ,ϵϵϱ,ϬϬϬ
As part of the design and implementation, operations and maintenance costs will be considered.
ϱϬ
ϭ,6ϵϰ,ϬϬϬ
Ϭ
Ϭ
ϯϱ,ϭϱϭ,ϬϬϬ
ϭ,6ϵϰ,ϬϬϬϯϱ,ϭϱϭ,ϬϬϬ
Ϭ
Transit Aid County DMC
Transit Aid State DMC
Operating Transfer ʹ From Sewer Utility
Special Assessment Bonds
Water Utility
State DMC Funds
Federal Funds
ϯϳ,ϵϵϱ,ϬϬϬ ϭ,6ϵϰ,ϬϬϬ
ϮϬϮϯ
122
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
Provides public access to shower facilities ;and potentially laundry facilitiesͿ for those commuting via bicycle͕ those experiencing
homelessness͕ etc.
Destination Medical Center
City Administration
287
NA
Create hygiene stations in the DMC district for use by the public.
Compassion͕ Social EƋuity
Active Commuter Resource Center
Enhance Yuality of Life
Destination Medical Center CIP ;BU 8600Ϳ
Not Applicable
2021
Noloan L Schild
Destination Medical Center
0
123
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
50͕000
2023 2024 20252022
Construction
50͕000
2021
0
New
50͕000
0
050͕000
0
0
0
2026
50͕000
0
202620242022
50͕000
This project would be in alignment with long term strategies and development plans of both the DMC and City of Rochester.
2021
50͕000
2025
0
00
0
50͕000
The operating costs to be incurred will need to projected and considered as part of project implementation.
50
0
0
0
0
00
0
State DMC Funds
0 0
2023
Project Cost Breakdown Row Total:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
124
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
Encourages use of electric vehicles in an effort to reduce emissions and allows for those with electric vehicles to have adequate access to
charging stations.
Destination Medical Center
City Administration
Ϯϴϱ
NA
Install electric vehicle charging stations at strategic locations in the downtown/Destination Medical Center District.
Environmental Stewardship, Fiscal Responsibility & Sustainability
Downtown Electric sehicle Charging Stations
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
Destination Medical Center CIP (BU ϴ6ϬϬ)
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
125
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
ϭϬϬ,ϬϬϬ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Construction
ϭϬϬ,ϬϬϬ
ϮϬϮϭ
Ϭ
New
ϭϬϬ,ϬϬϬ
Ϭ
ϬϭϬϬ,ϬϬϬ
Ϭ
Ϭ
Ϭ
ϮϬϮ6
ϭϬϬ,ϬϬϬ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϭϬϬ,ϬϬϬ
The project would be in alignment the long term strategies and the development plans of both the DMC and City of Rochester.
ϮϬϮϭ
ϭϬϬ,ϬϬϬ
ϮϬϮϱ
Ϭ
ϬϬ
Ϭ
ϭϬϬ,ϬϬϬ
Ϭ
A method for cost recovery will be determined to cover the cost of operations.
ϮϬ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
Sales Tax DMC
Ϭ Ϭ
ϮϬϮϯ
126
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
To promote a connective greenway system throughout the downtown that encourages private investment and enhances the quality of
life for residents. To create an attraction that will help catalynje and organinje land use development. To decrease the number of single
occupancy vehicles needing to travel into downtown. To enhance the safety of bicyclist and pedestrians on downtown city streets.
Destination Medical Center
City Administration
Ϯϯ6
NA
Create an urban trail network composed of dedicated bike lanes and pedestrian paths around downtown.
Environmental Stewardship, Fiscal Responsibility & Sustainability, Public Safety, Social Equity
City Loop Implementation
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
City Administration
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
127
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
Ϭ
Ϭ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Architect/Design
Construction
Ϭ
ϮϬϮϭ
Ϭ
New
ϱ,ϬϬϬ,ϬϬϬ
ϰ,ϱϬϬ,ϬϬϬ
ϬϬ
ϱϬϬ,ϬϬϬ
Ϭ
ϰ,ϱϬϬ,ϬϬϬ
ϱϬϬ,ϬϬϬ
ϮϬϮ6
ϱϬϬ,ϬϬϬ
ϰ,ϱϬϬ,ϬϬϬ
Ϭ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϱ,ϬϬϬ,ϬϬϬ
DMC projects support the DMC Development Plan and take into consideration other City plans such as the comprehensive plan, bicycle
master plan, park master plan, etc.
ϮϬϮϭ
ϱ,ϬϬϬ,ϬϬϬ
ϮϬϮϱ
Ϭ
ϰ,ϱϬϬ,ϬϬϬ
Ϭϰ,ϱϬϬ,ϬϬϬ
Ϭ
Ϭ
ϱϬϬ,ϬϬϬ
Will be evaluated once the project is further defined
As part of the design and implementation operations and maintenance costs will be considered and the City and DMC teams will evaluate
what sources are most appropriate to pay for any annual increase in operating costs.
ϱϬ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϬϬ
Ϭ
State DMC Funds
ϱϬϬ,ϬϬϬ Ϭ
Ϭ
ϮϬϮϯ
128
Department:
Division:
Contact Person:
Location:
Project Category:
Department Priority:Ward:
Project Description:
Project Number:
CIP Business Unit:
What is the grant status for the project?:
Foundation Principles Supported:
Strategic Priorities Supported:
Purpose, Justification & Benefits:
Capital Improvement Plan
Will enhance mobility for citinjens, visitors, workers, etc. commuting to areas within the Destination Medical Center.
Destination Medical Center
City Administration
Ϯϴϰ
NA
The details of this transportation related project have not yet been determined, but the project and these funds represent a phase two
project implantation in relation to the Integrated Transit Studies. Funding years and amounts will continue to evolve as the development
of a phase II plan is finalinjed.
Environmental Stewardship, Fiscal Responsibility & Sustainability, Public Safety, Social Equity
ITS Implementation Phase II
Enhance Yuality of Life, Manage 'rowth and Development, Balance Public Infrastructure Investment
Destination Medical Center CIP (BU ϴ6ϬϬ)
Not Applicable
ϮϬϮϭ
Noloan L Schild
Destination Medical Center
Ϭ
129
Anticipated Funding Source
Funding Request Row Total:
Major Expense Category
Project Cost Breakdown Row Total:
Describe how operating cost increases/Decreases and include details such as personnel costs, materials, contracts, energy savings, etc.:
Describe how this project implements recommendations from other plans adopted by the City and related groups:
Project Cost Breakdown:
Department Funding Request:
If new infrastructure, discuss how the department will pay for the increased annual operating costs:
Total Current 6 Yrs
Is this request for new or existing infrastructure:
What is the expected useful life of the project/improvement (in years):
What is the estimated annual operating cost increase (Decrease) for this project ($):
Operations & Capital Asset Maintenance:
Total Current 6 Yrs
Ϭ
ϮϬϮϯ ϮϬϮϰ ϮϬϮϱϮϬϮϮ
Implementation
Ϭ
ϮϬϮϭ
Ϭ
ϰ,ϴϬϬ,ϬϬϬ
ϯ,ϮϬϬ,ϬϬϬ
New
Ϯϰ,ϬϬϬ,ϬϬϬ
Ϭ
ϳ,ϱϬϬ,ϬϬϬ
ϰ,ϱϬϬ,ϬϬϬ
ϯ,ϬϬϬ,ϬϬϬϬ
Ϭ
Ϭ
Ϭ
Ϭ
Ϭ
ϮϬϮ6
Ϯϰ,ϬϬϬ,ϬϬϬ
Ϭ
Ϭ
ϭ,ϬϬϬ,ϬϬϬ
ϮϬϮ6ϮϬϮϰϮϬϮϮ
ϳ,ϱϬϬ,ϬϬϬ
ϵ,ϵϬϬ,ϬϬϬ
6,6ϬϬ,ϬϬϬ
DMC projects support the DMC Development Plan and take into consideration other City plans such as the comprehensive plan, bicycle
master plan, park master plan, etc.
ϮϬϮϭ
Ϯϰ,ϬϬϬ,ϬϬϬ
ϮϬϮϱ
Ϭ
Ϭ
6ϬϬ,ϬϬϬ
ϰϬϬ,ϬϬϬ
Ϭ
Ϭ
Ϭ
ϭϱ,ϬϬϬ,ϬϬϬ
Ϭ
Ϭ
Operating costs and cost recovery shall be projected and considered as part of the development of the phase II plan and implementation
strategy.
ϳϱ
ϴ,ϬϬϬ,ϬϬϬ
ϭϱ,ϬϬϬ,ϬϬϬ
ϭϱ,ϬϬϬ,ϬϬϬ
ϭ,ϬϬϬ,ϬϬϬ
ϴ,ϬϬϬ,ϬϬϬϭ,ϬϬϬ,ϬϬϬ
Ϭ
State DMC Funds
Transit Aid State DMC
Transit Aid County DMC
Ϭ ϴ,ϬϬϬ,ϬϬϬ
ϮϬϮϯ
130
Special Assessment Bonds = a Abatement District = ad Olmsted County = c Electric Utility = eu f fr
Food & Beverage Tax = fb Local Gov't Aid = ga General Obligation Bonds = go Lodging Tax = lt ms os
Operating Trfs-fr General Fund = ot Operating Trfs-fr Sewer Utility = ow Operating Trfs-fr General Fund = ox Private Funds = p Project Reserves = r rb
Retained Earnings = re State Funds = s Sn/Sewer Availability Chg = sa Sales Tax DMC = sd State DMC Funds = sm st
Storm Water Mgmt Chg = sw Tax Levy = t Traffic Improvement Dist Chg = td Tax Increments = ti Operating Trfs - fr Other Funds = to Water Availability Chg = wa
Transit Aid County DMC = tc Transit Aid State DMC = ts wu Unfunded = u
2020
Sort Map #Project Description Proj #Total Budget CIP Bdgt Amts 2021 Priority 2022 Priority 2023 Priority 2024 Priority 2025 Priority 2026 Priority
0
0 Administrative
1 1 Contributions to DMC Corporation for DMCC expenses
8602 5,191,700 286,500 sd 268,750 sd 276,813 sd 285,117 sd 293,670 sd 302,480 sd 311,555 sd
1
2 2 Contributions to DMC Corporation for EDA expenses 8602 30,435,639 2,570,147 sd 2,235,776 sd 2,302,849 sd 2,371,935 sd 2,443,093 sd 2,516,386 sd 2,591,877 sd
2
3 3 City Project Management expenses
8614 7,707,761 660,524 sd 696,215 sd 713,620 sd 731,461 sd 749,747 sd 768,491 sd 787,703 sd
3
3
3
3
3
3
4 4 City of Rochester Administrative costs for DMC projects 8601 1,700,000 100,000 sd 100,000 sd 100,000 sd 100,000 sd 100,000 sd 100,000 sd 100,000 sd
4
5 5 Development Plan Update 1,250,000 750,000 sm 500,000 sm
5
5 3,300,741 3,393,282 3,488,513 3,586,510 4,187,357 3,791,135
5
6 Economic Redevelopment & Public Realm
6 6 Heart of the City 8625 19,271,265 10,622,325 sm 6,000,000 sm
6
6
7 7 Discovery Walk Design and Implementation 17,200,000 2,800,000 sm 7,000,000 sm 7,000,000 sm
7
7
8 8 Chateau Theatre Improvements 8624 10,926,802 100,000 sd 100,000 sd 100,000 sd 100,000 sd 100,000 sd 100,000 u 100,000 u
8
8
8
9 9 Sales Tax DMC - Repayment of loan from Flood Control Reserves; 7 year repayment
starting in 2018.8605 7,200,000 1,200,000 sd 1,200,000 sd 1,200,000 sd 1,200,000 sd
9
10 10 Strategic Redevelopment 7,000,000 7,000,000 sm
10
11 11
Downtown Sidewalk Experience Enhancement (ADA Improvements, Increase Public
Realm Space & Aesthetic Integration) 848,375 848,375 sm
11
11
12 12
River Front Reimagined New 6,000,000 1,000,000 sm 5,000,000 sm
12
13 13 Smart Cities Consultation 100,000 100,000 sd
13
14 14 St Marys Place Public Realm Implementation 3,300,000 300,000 sm 3,000,000 sm
14 23,148,375 13,700,000 4,300,000 100,000 100,000 100,000
14
15 Infrastructure
15 15 Construct 6th Street Bridge - Study, Design & Construction
New 1,300,000 1,300,000 sm
15
15
16 16 Reconstruct North Broadway Ave from Civic Center Drive to Zumbro River Bridge.
F d t b t f d f J2202 (TH63 t b k)
7326 20,000,000 4,000,000 r 6,100,000 r
16 898,675 sm 3,101,325 sm
16 1,600,000 ow
16 1,300,000 wu
16 1,400,000 a
16
17 17 SS1 12th & 13th Ave Sanitary and Storm Sewer Capacity Improvements from 2nd St SW
to 2nd St NW. (Project is without subway tunnel option).8611 6,150,000 2,250,000 sm
17 1,000,000 ow
17 150,000 a
17
17
17
18 18 Downtown District Energy System New 2,000,000 200,000 sm 1,800,000 sm
18
19 19 Construct sanitary sewer capacity bypass on 3rd Ave SW from 2nd St SW to 4th St SW
8626 3,100,000 50,000 ow 1,500,000 ow
19 50,000 sm 1,500,000 sm
19
19 14,101,325 1,800,000 100,000 3,000,000 - -
20 Transit
20 20 ITS Study Repayment 8,000,000 1,600,000 sd 1,600,000 sd 1,600,000 sd 1,600,000 sd
20
21 21 Arrive Rochester Implementation 985,000 260,000 sd 60,000 sd 67,000 sd 75,000 sd 83,000 sd 91,000 sd 99,000 sd
21
21
21
22 22 ITS Implementation: Rapid Transit (Includes St. Mary's Transit Station from 2021 going
forward; also includes 2nd Street Recon & Streetscape)8707 114,870,000 1,548,800 tc 2,100,800 tc 9,017,748 tc 4,199,613 tc 3,807,024 tc
22 2,323,200 ts 3,151,200 ts 13,526,622 ts 6,299,419 ts 5,710,534 ts
22 200,000 f 11,410,353 f 18,828,968 f 24,152,979 f 1,694,000 f
22 4,040,277 sm 253,000 sm 1,480,463 sm
22 150,000 wu
22 225,000 ow
22 750,000 a
22
23 23 Active Commuter Resource Center New 50,000 50,000 sm
23
24 24 Downtown electric vehicle charging stations New 100,000 100,000 sd
24
25 25 City Loop Implementation 5,000,000 500,000 sm 4,500,000 sm
25
26 26 ITS Implementation Phase 2 New 24,000,000 400,000 tc 3,200,000 tc 3,000,000 tc
26 600,000 ts 4,800,000 ts 4,500,000 ts
26 7,500,000 sm
26
26 7,262,000 40,162,000 36,881,000 36,234,000 9,785,000 15,099,000
26
Total Cost 303,686,542 34,020,171 47,812,441 59,055,282 44,769,513 42,920,510 14,072,357 18,990,135
Sources of Funds
Special Assessment Bonds a 2,300,000 150,000 a - a 750,000 a - a - a
Olmsted County c 250,000 - c - c - c - c - c - c
Federal f 56,286,300 200,000 f 11,410,353 f 18,828,968 f 24,152,979 f 1,694,000 f - f
Municipal State Aid for Streets ms - - ms - ms - ms - ms - ms - ms
Operating Transfer - fr Storm Water Utility os 212,500 - os - os - os - os - os - os
Operating Transfer - fr Sewer Utility ow 4,587,500 1,000,000 ow - ow 275,000 ow 1,500,000 ow - ow - ow
Private Funds p 500,000 - p - p - p - p - p - p
Project reserves r 10,900,000 6,100,000 r - r - r - r - r - r
State s - - s - s - s - s - s - s
Sales Tax 2013 st - - st - st - st - st - st - st
Sales Tax DMC sd 70,648,027 6,360,741 sd 6,460,282 sd 6,463,513 sd 3,769,510 sd 3,778,357 sd 3,890,135 sd
State DMC Funds sm 87,492,255 28,749,700 sm 18,640,277 sm 7,803,000 sm 2,980,463 sm 500,000 sm 7,500,000 sm
Storm Water Area Mgmt Charge sw - - sw - sw - sw - sw - sw - sw
Transit Aid County DMC tc 27,273,985 2,100,800 tc 9,017,748 tc 4,199,613 tc 4,207,024 tc 3,200,000 tc 3,000,000 tc
Transit Aid State DMC ts 40,910,975 3,151,200 ts 13,526,622 ts 6,299,419 ts 6,310,534 ts 4,800,000 ts 4,500,000 ts
Operating Transfer - Other Funds to 562,500 - to - to - to - to - to - to
Water Utility wu 1,562,500 - wu - wu 150,000 wu - wu - wu - wu
Total Sources of Funds 303,486,542 47,812,441 59,055,282 44,769,513 42,920,510 13,972,357 18,890,135
Unfunded Projects u 200,000 - - - - - 100,000 100,000
Total of NEW FUNDING requests 47,812,441 59,055,282 44,769,513 42,920,510 14,072,357 18,990,135
Total adjustments to prior years' funding authorizations - - - - - -
Total Cost 47,812,441 59,055,282 44,769,513 42,920,510 14,072,357 18,990,135
GO Revenue Bonds =
Sales Tax 2013 =
Water Utility =
Destination Medical Center 2021-2026 Capital Improvement Plan Schedule for Six Year Period
Federal Funds = Flood Control Reserves =
MN State Aid - Streets = Operating Trfs - fr Storm Water =
131
132
2015-2019 DMC Capital Plan Budget Reconciliation
To: DMCC Board of Directors
From: DMC EDA Staff
Date: August 21, 2020
Request of the DMCC board of directors:
• Approve the reconciliation of 2015-2019 DMC Capital Plan budgets
Background:
In the course of preparing updates to the DMC Development Plan, DMC EDA and City of Rochester staff
reviewed all DMC infrastructure projects and investments authorized in the DMC Corporation’s
2015-2019 annual capital plans. During this review, staff reconciled expenses during that period and
identified several approved projects that have not fully expended their allocated budgets. In some cases,
project costs were lower than budgeted. In others, annual changes to the DMC capital improvement
program, DMC Corp. board priorities, or less-than-favorable project bids resulted in projects being
postponed, redefined, or cancelled.
A detailed outline of each project and its associated budget, expenses, and proposed reconciliation
amount follows this memorandum.
Additionally, the DMC EDA recommends that the DMC Corp. require all DMC capital project budgets
undergo a similar annual reconciliation and that the results of the reconciliation be presented to the board
when it considers its annual funding request.
Next Steps:
• September 2020: Rochester City Council consideration
133
Phase 1 DMC CIP Reconciliation
Project List
8/21/2020
Project Description
Contributions to DMC Corporation for DMCC + DMC EDA 24,775,391 20,259,212 4,516,179
City of Rochester Administrative costs for DMC project 1,118,043 523,941 594,102
Olmsted County Staff Costs for ITS 0 168,754 -168,754
3,390,760 2,130,460 1,260,300
City Loop Plan 1,209,938 250,000 959,938
Transit Circulator Study 3,016,997 2,109,550 907,447
Chateau Theater - Maintenance & Operations 2,826,802 363,906 2,462,896
Chateau Theater - Acquisition + Capital Expenditures 6,900,000 6,923,439 -23,439
Downtown Street use and operations study 2,342,243 2,650,750 -308,507
Property & ROW Acquisition 0 359,240 -359,240
DMC funded portion of SS2 Cooke Park sanitary sewer 950,000 46,592 903,408
Property & right of way acquisition 2,259,240 0 2,259,240
Discovery Walk & 2nd Ave SW from 2nd Street SW to 6th 400,000 0 400,000
2nd Street SW from 11th Ave. to 16th Ave. - Street and area 200,000 0 200,000
Evaluation of Long Term CBD Maintenance, Operations and 100,000 0 100,000
ITS Implementation 4,450,000 0 4,450,000
TOTAL 53,939,414 35,785,844 18,153,570
Reconciliation
Transit/Transportation/Infrastructure Management
Completion of 2017 ITS studies and transit planning work
Approved
Budget
Actual Amount
Required
134
2021 WORK PLAN:
DMC EDA LEGISLATIVE RESPONSIBILITIES, OUTCOMES, AND GOALS
Facilitate Private
Investment
Evaluate
Development
Proposals
Implement
Development Plan Transactional Services Community Outreach
Programs Facilitate transactions Seek financial support Partner with others Administer planning
to implement plan
Marketing and
Promotion
Community and
Public Relations Pursue other funding General Advisory
Recommendations 2021 Outcome Strategic Priority Phase 2 (2025) Goal 2035 Goal
X X XXX XXCreate a measurement system to monitor progress toward Integrated Transit Studies (ITS) implementation
XXX XXX XXX
Create an economic development plan and strategy for transit‐oriented development (TOD), the West Transit
Village, and station area locations
X X X XXX XXX
Operate a successful and informative autonomous vehicle (AV) pilot
XXX X XXX XXX
Advance design, engineering process and overall development of the rapid transit circulator
XXX X XX X X
Create a downtown bike infrastructure strategy
XX XX XEstablish a long‐term Arrive Rochester transit management association (TMA) governance strategy
XXX XXXX
Develop a public‐private downtown parking strategy
XXX XXXX
Create a pedestrian access plan to connect to rapid transit to ensure safe, equitable access
XXX X XX X X
Include 20 business and property owner ideas to minimize impacts of construction
XXX XX X Maintain access to sidewalks during construction
XXX XXXX
100+ interactions with business and property stakeholders
XXX XXXX
Increase visitation in Heart of the City by 25%
XXXXXXXX Final Discovery Walk design completed and approved
X X XXX X Discovery Walk Construction begins
XXX X XX X X
Identify opportunities for home ownership in the DMC district
XXX X XX X X
Realize 30 units between 30‐50% AMI Realize 150 unit between 30‐50% AMI Realize 449 units between 30% to 50% AMI
XXX X XX X X
Realize 42 units between 50‐80% AMI Realize 210 units between 50‐80% AMI Realize 630 units between 50% to 80% AMI
XXX XXXX
10 higher education students in interning DMC district businesses, in addition to Mayo Clinic programs
XXX XXXX
5 high school students from the City of Rochester or region are hosted by businesses in Discovery Square for an
experiential learning opportunity
XXX X XX X X
Achieve targeted business and workforce goals: Women Workforce goal: 7%; Minority Workforce goal: 15%;
Targeted Business goal: 7%; Construction Business goal: 4%
XXXXXX XX X X
Two Discovery Square construction underway Develop 330,000 s.f. of Bio‐Med‐Tech space Develop 1.02M s.f. new bio‐med, health tech space
XX XXXX Complete West Transit Village master plan
XXX XXXX
Complete downtown waterfront plans (Riverfront Re‐imagined and south waterfront)
XXX XXXX
Work with stakeholder partners to complete UMR/education/recreation sub‐district plan
XXX XXXX
Benchmarking program includes 130 buildings Benchmarking program includes over 200 buildings
XXX XX XProvide monthly reports toward DMC greenhouse gas, energy and sustainability goals
X X X XXXX X
Provide and evaluate 12 sustainability series events and assist with management of Rochester Earthfest
XX XX XComplete Sustainability and Resiliency Task Force (SRTF) plan led by City of Rochester and begin project
implementation
Progress toward DMC and Rochester greenhouse gas, energy and sustainability
goals across sectors (commercial, industrial, residential)
Reduce: energy consumption by 25% below 2012 levels by 2030; potable water consumption below 2012 levels by 2030; total
waste generated by 30% below 2012 levels by 2030; drive‐alone mode share to 50% or less; DMC‐wide emissions per SF by 80%
below 2005 levels by 2050
XX XX XComplete 9 projects identified in Phase 1 of Strategic Energy Project Plan and begin work on Phase 2 projects Reduce district‐wide energy consumption by 20% below 2010 levels Reduce district‐wide energy consumption by 25% below 2010 levels by 2030
XXX X XX X X
Integrate members of underrepresented communities into economic recovery strategy planning America's City for Health Apply health in design process to 5 infrastructure projects Show quantifiable improvements in community health measures
XXX XXXX
For DMC Assistive Tech Challenge, deliver 10+ workshops, have 5+ Rochester applications, 20+ MN applications,
10+ applications from other states, and 2+ international applications
DMC Assistive Tech Challenge (ATC) enables formation of 10 new ATC‐related
businesses, creating 25 new jobs towards the goal of creating 510 Mayo and
non‐Mayo new jobs
XXX XXXX
Support the opening of 5+ startup businesses Develop 330,000 SF of Bio‐Med‐Tech space
XXX XXXX
Help retain and grow existing businesses by directly engaging with 25+ business operators within the DMC
district
XXX XXXX
Deliver 10+ entrepreneurism programs in collaboration with other organizations
X X XX XXXX X
Secure at least 4 new bioscience businesses in Discovery Square
200+ new jobs created by recruiting 20 new bio‐ med‐tech businesses into
Discovery Square toward the goal of creating 510 Mayo and non‐Mayo new
jobs in bio‐med‐tech
X X X XXXX X
Add new target marketing audiences including Digital Health, Entrepreneurs and Retail, Dining and
Entertainment
X X X XXXX X
Generate a minimum of 150 business and economic development leads per quarter
X X X XXXX X
Continue to build greater state, national and international awareness
X X X XXXX X
Drive qualified traffic to www.dmc.mn, increasing engagement, lead generation and movement through the
sales funnel
XXXXXXIncrease earned media coverage by 10% using various communication tactics
XX XX XRetail, Dining, Entertainment (RDE) current COVID‐19 assessment and markets study conducted
XX XX XRDE recruitment/retention strategy developed, with a focus on Heart of the City and Discovery Square that
supports residents, visitors and workers
XXXXXXIncrease community participation DMC general and targeted engagement activities by underrepresented
communities by 100%
XXXXXXIncrease the number of strategic community engagement collaborations/activities with targeted audiences,
including seniors/retirees, young families, S.E. MN residents, underrepresented communities, and small business
owners
XXX XXXX
Create/collaborate on projects that support a world class destination to enhance the quality of the experience for
patients, visitors and residents in Rochester, including projects related to patient and visitor arrival, end‐of‐first‐
day support, and wayfinding; and resident needs based on 2021 research.
XXX XXXX
Collaborate with stakeholders to establish experience measurement progress benchmarked against original
2015 data
XXX X XX X X
Through collaboration, integrate equity into DMC project and program development Integrate health equity and social equity lens to DMC internal operations and
external efforts
Transportation Reduce drive‐alone mode share from 71% to 58%Reduce drive‐alone mode share to 50% or less
Common Ground
Attract more than $5 billion in private investment
Achieve highest quality patient, visitor, resident experienceDiscovery Walk construction completed, activiies take place regularly, new
development is being considered
Demonstrate the economic and experience value of Heart of the City public
space investment by the following measures: increase pedestrian traffic in the
Peace Plaza area by 50%; Businesses report increased revenue; Visitors and
community members report that they are more likely to visit downtown
Housing
Sustainability
Experience and Engagement
Workforce
Business Development and Marketing
Transformative Projects
Show quantifiable improvements in the availability of housing in DMC District, inclusive of housing type and affordability
100 interns placed annually in bio‐med‐tech businesses, with 10% transitioning
into employment in Rochester Create 35,000‐45,000 new jobs, including 3,230 in bio‐med‐tech
Reduce energy consumption by 25% below 2012 levels by 2030
Reduce DMC‐wide emissions per SF by 22% below 2005 levels by 2025
Women Workforce Participation: 9%; Minority Workforce Participation: 15%; Targeted Business Goal: 7%; Construction Targeted Business Goal: 4%
Attract more than $5 billion in private investmentMore than $1 billion of new private development, consistent with development
plan, underway
Demonstrate the economic and experience value of Heart of the City public
space investment by the following measures: increase pedestrian traffic in the
Peace Plaza area by 50%; Businesses report increased revenue; Visitors and
community members report that they are more likely to visit downtown Experience: Achieve highest quality patient, visitor, resident experience
Programming supports the formation of 20 new startup companies and 100+
new jobs, toward the goal of creating 510 Mayo and non‐Mayo new jobs in bio‐
med‐tech
Create 35,000‐45,000 new jobs, including 3,230 in bio‐med‐tech
Attract more than $5 billion in private investment
More than $1 billion of new private development, consistent with development
plan, underway
Retail strategy implemented in DMC district
Engagement: Build a community of stakeholders that see themselves in the DMC visionCommunity reports higher understanding of the DMC initiative and its
importance to local community
135
136
Destination Medical Center Economic Development Agency
&
City of Rochester DMC Project Management Team
2021 Workplan
Updated: August 11, 2020
137
Table of Contents
1. EXECUTIVE SUMMARY
2.CITY OF ROCHESTER DMC PROJECT MANAGEMENT RESPONSIBILITIES
3.DMC EDA STATUTORY ROLE AND RESPONSIBILITIES
4.WORKPLAN OUTCOMES TO ACHIEVE 2021 STRATEGIC PRIORITIES AND DMC GOALS
5.OPERATING BUDGETS
1.Executive Summary
In 2021, the Destination Medical Center (“DMC”) initiative will focus on pursuing the strategic priorities endorsed by the
Destination Medical Center Corporation Board of Directors and the City of Rochester Common Council in order to achieve the
goals of the DMC initiative.
Anchored by the DMC Development Plan and influenced by the engagement and participation of our stakeholders, the
Destination Medical Center Economic Development Agency (“DMC EDA”) and City of Rochester DMC project management team
will continue to pursue the goals of the DMC initiative.
DMC GOALS
•Create a comprehensive strategic plan with a compelling vision that harnesses the energy and creativity of the entire
community
•Leverage the public investment to attract more than $5 billion in private investment to Rochester and the region
•Create approximately 35,000 – 45,000 new jobs, with workforce development strategies that support that growth
•Generate approximately $7.5 - $8.0 billion in new net tax revenue over 35 years
•Achieve the highest quality patient, companion, visitor, employee, and resident experience, now and in the future
2021 STRATEGIC PRIORITIES
•Transportation
•Common Ground
•Housing
•Workforce
•Transformative Projects
•Sustainability
*COVID-19 Recovery and Resiliency
Additionally, the DMC EDA and City of Rochester DMC project management team have incorporated significant business
development, marketing, experience, and community engagement initiatives into the 2021 workplan in order to support these
strategic priorities. The workplan outlines the objectives and defines the resources necessary to advance the 2021 DMC
strategic priorities.
2.City of Rochester DMC Project Management Team Responsibilities
In January 2019, the Destination Medical Center Corporation approved a proposal to assign new and existing DMC- related
project management responsibilities to DMC-dedicated City of Rochester staff. For example, the City of Rochester DMC Project
Management team supports the DMC initiative in these areas:
•Project delivery
•WMBE
•Rapid transit
•Subdistrict public project construction management, including Heart of the City and Discovery Walk
138
3.DMC EDA Statutory Role and Responsibilities
The DMC EDA assists the Destination Medical Center Corporation (“DMCC”) and the City of Rochester (“City”) in
implementing the development planning and promotion, development services, and marketing, outreach and
communication activities required to achieve the goals of the DMC development plan.
The DMC legislation identified several key responsibilities of the DMC EDA in addition to its role as an advisory agency to
the DMCC and City:
•Drafting and implementing the development plan, including soliciting and evaluating proposals for
development and evaluating and making recommendations to the DMCC and the City regarding those
proposals
•Seeking financial support for the DMCC, the City, and projects
•Partnering with other development agencies and organizations, the city, and the county in joint efforts to
promote economic development and establish a destination medical center
•Supporting and administering the planning and development activities required to implement the development plan
•Developing and updating the criteria for evaluating and underwriting development proposals
•Providing transactional services in connection with approved projects
•Working with the corporation to acquire and facilitate the sale, lease, or other transactions involving land and real
property
•Assisting the DMCC or City and others in applications for federal grants, tax credits, and other sources of
funding to aid both private and public development
•Facilitating private investment through development of a comprehensive marketing program to global interests
•Developing patient, visitor, and community outreach programs
•Preparing and supporting the marketing and promotion of DMC
•Preparing and implementing a program for community and public relations
139
4.Workplan To Achieve 2021 Strategic Priorities and DMC Goals
STRATEGIC PRIORITY: TRANSPORTATION
Create the integrated transportation infrastructure necessary to provide access to and through downtown
Rochester and encourage additional opportunity for development and investment.
2035 Goal Phase 2 (2025) Goal 2021 Outcome
Reduce drive-
alone mode
share
to 50% or less
Reduce drive-alone
mode share
from 71% to 58%
Create a measurement system to monitor progress toward Integrated
Transit Studies (ITS) implementation
Create an economic development plan and strategy for transit-oriented
development (TOD), the West Transit Village, and station area locations
Operate a successful and informative autonomous vehicle (AV) pilot
Advance design, engineering process and overall development of the
rapid transit circulator
Create a downtown bike infrastructure strategy
Establish a long-term Arrive Rochester transit management association
(TMA) governance strategy
Develop a public-private downtown parking strategy
Create a pedestrian access plan to connect to rapid transit to ensure
safe, equitable access
STRATEGIC PRIORITY: COMMON GROUND
Design and develop public spaces and amenities to incentivize additional private investment, create unique
experiences, and increase downtown density.
2035 Goal Phase 2 (2025) Goal 2021 Outcome
Attract
more than
$5 billion in
private
investment
Demonstrate the economic and
experience value of Heart of the
City public space investment by
the following measures:
•Increase pedestrian traffic in
the Peace Plaza area by 50%
•Businesses report increased
revenue
•Visitors and community
members report that they are
more likely to visit downtown
Include 20 business and property owner ideas to minimize
impacts of construction
Maintain access to sidewalks during construction
100+ interactions with business and property stakeholders
Increase visitation in Heart of the City by 25%
Discovery Walk construction
completed, activities take place
regularly with increased
involvement by underrepresented
community members,
new development is being
considered
Final Discovery Walk design completed and approved
Discovery Walk Construction begins
Stakeholder-supported Business Forward plan adopted
140
STRATEGIC PRIORITY: HOUSING
Contribute to a robust mix of housing infrastructure in the DMC District that creates density, sustains
additional commercial and entertainment activity, develops a greater sense of community, and provides for
our growing workforce.
2035 Goal Phase 2 (2025)
Goal 2021 Outcome
Show quantifiable improvements in the availability of housing in
DMC District, inclusive of housing type and affordability
Identify opportunities for home ownership in
the DMC District
Realize 449 units between 30% to 50%
AMI
Realize 150
units between
30-50% AMI
Realize 30 units between 30-50% AMI
Realize 630 units between 50% to 80%
AMI
Realize 210
units between
50-80% AMI
Realize 42 units between 50-80% AMI
STRATEGIC PRIORITY: SUSTAINABILITY
Foster the culture, best practices, and development processes necessary to create a more healthy,
sustainable community that elevates Rochester as a market for investment, development, and workforce
recruitment and retention.
2035 Goal Phase 2 (2025) Goal 2021 Outcome
Reduce energy consumption by 25%
below 2012 levels by 2030 and
DMC-wide emissions per SF by 80%
below 2005 levels by 2050"
Benchmarking program includes
over 200 buildings Benchmarking program includes 130 buildings
Reduce DMC-wide emissions per
SF by 22% below 2005 levels by
2025
Provide monthly reports toward DMC
greenhouse gas, energy
and sustainability goals
Provide and evaluate 12 sustainability series
events and assist with management of
Rochester Earthfest
Reduce:
•Energy consumption by 25%
below 2012 levels by 2030
•Potable water consumption
below 2012 levels by 2030
•Total waste generated by 30%
below 2012 levels by 2030
•Drive alone mode share to 50%
or less
•DMC-wide emissions per SF by
80% below 2005 levels by 2050
Progress toward DMC and
Rochester greenhouse gas,
energy and sustainability goals
across sectors (commercial,
industrial, residential)
Complete Sustainability and Resiliency Task
Force (SRTF) plan led by City of Rochester and
begin project implementation
Reduce district-wide energy
consumption by 25% below 2010
levels by 2030
Reduce district-wide energy
consumption by 20% below 2010
levels by 2025
Complete 9 projects identified in Phase 1 of
Strategic Energy Project Plan and begin work
on Phase 2 projects
141
STRATEGIC PRIORITY: WORKFORCE
Contribute to our innovative workforce by supporting projects and programs that recruit and retain bio-
med-tech students, employees, employers, and entrepreneurs and encourages the sustainable growth of
our regional construction and building trades economy.
2035 Goal Phase 2 (2025) Goal 2021 Outcome
Create 35,000-45,000 new jobs, including
3,230 in bio-med-tech
100 interns placed annually in bio-med-
tech businesses, with 10% transitioning
into employment in Rochester
10 higher education students
in interning DMC district
businesses, in addition to
Mayo Clinic programs
5 high school students from
the City of Rochester or
region are hosted by
businesses in Discovery
Square for an experiential
learning opportunity
Achieve targeted business and workforce goals:
Women Workforce Participation: 9%
Minority Workforce Participation: 15%
Targeted Business Goal: 7%
Construction Targeted Business Goal: 4%
Achieve targeted business
and workforce goals:
Women Workforce goal: 7%
Minority Workforce goal: 15%
Targeted Business goal: 7%
Construction Business goal: 4%
STRATEGIC PRIORITY: TRANSFORMATIVE PROJECTS
Pursue high-impact, market-changing development opportunities that advance the DMC Goals and Mission
and maximally leverage DMC resources.
2035 Goal Phase 2 (2025) Goal 2021 Outcome
Develop 1.02M SF
new bio-med, health
tech space
Develop 330,000 SF of Bio-Med-Tech
space Two Discovery Square construction underway
Attract more than
$5 billion in private
investment
More than $1 billion of new private
development, consistent with
development plan, underway
Complete West Transit Village master plan
Complete downtown waterfront plans
(Riverfront Re-imagined and south waterfront)
Work with stakeholder partners to complete
UMR/education/recreation sub-district plan
STRATEGIC PRIORITY: AMERICA’S CITY FOR HEALTH
Ensure that public infrastructure investment supports a more healthy community, citizenry, and built and
natural environments.
2035 Goal Phase 2 (2025) Goal 2021 Outcome
Show quantifiable improvements in
community health measures
Apply health-in-design process to 5
infrastructure projects
Integrate members of underrepresented
communities into economic recovery
strategy planning
142
STRATEGIC PRIORITY: EXPERIENCE AND COMMUNITY ENGAGEMENT
Achieve the highest quality patient, visitor, and community member experience both now and in the future.
2035 Goal Phase 2 (2025) Goal 2021 Outcome
Engagement: Build a
community of
stakeholders that see
themselves in the DMC
vision
Community reports
higher understanding
of the DMC initiative
and its importance to
local community
Increase community participation DMC general
and targeted engagement activities
by underrepresented communities by 100%
Increase the number of strategic community engagement
collaborations/activities with targeted audiences, including
seniors/retirees, young families, S.E. MN residents,
underrepresented communities, and small business owners
Achieve the highest quality
patient, companion, visitor,
employee, and resident
experience
Achieve the highest
quality patient,
companion, visitor,
employee, and resident
experience
Create/collaborate on projects that support a world class
destination to enhance the quality of the experience for
patients, visitors and residents in Rochester, including projects
related to patient and visitor arrival, end-of-first-day support,
and wayfinding; and resident needs
based on 2021 research.
Collaborate with stakeholders to establish experience
measurement progress benchmarked against original 2015 data
Integrate health and
social equity in DMC
operations and projects
Through collaboration, integrate equity into DMC project and
program development
143
STRATEGIC PRIORITY: BUSINESS DEVELOPMENT AND MARKETING
Execute business development and marketing activity to secure private investment, recruit and retain new
businesses and entrepreneurs, develop our workforce, and achieve the goals of the DMC Development Plan.
2035 Goal Phase 2 (2025) Goal 2021 Outcome
Create 35,000-
45,000 new jobs,
including 3,230 in
bio-med-tech
DMC Assistive Tech Challenge (ATC) enables
formation of 10 new ATC-related businesses,
creating 25 new jobs toward the goal of creating
510 Mayo and non-Mayo new jobs
For DMC Assistive Tech Challenge, deliver
10+ workshops, have 5+ Rochester
applications, 20+ MN applications, 10+
applications from other states, and 2+
international applications
Develop 330,000 SF of Bio-Med-Tech space Support the opening of 5+ startup businesses
Programming supports the formation of 20 new
startup companies and 100+ new jobs, toward
the goal of creating 510 Mayo and non-Mayo
new jobs in bio-med-tech
Help retain and grow existing businesses by
directly engaging with 25+ business operators
within the DMC district
Deliver 10+ entrepreneurism programs in
collaboration with other organizations
200+ new jobs created by recruiting 20 new bio-
med-tech businesses into Discovery Square
toward the goal of creating 510 Mayo and
non-Mayo new jobs in bio-med-tech
Secure at least 4 new bioscience businesses
in Discovery Square
Attract
more than
$5 billion in
private
investment
More than $1 billion of new private development,
consistent with development plan, underway
Add new target marketing audiences
including Digital Health, Entrepreneurs and
Retail, Dining and Entertainment
Generate a minimum of 150 business and
economic development leads per quarter
Continue to build greater state, national
and international awareness
Drive qualified traffic to www.dmc.mn,
increasing engagement, lead generation and
movement through the sales funnel
Increase earned media coverage by 10%
using various communication tactics
Retail developments
active across all DMC
subdistricts Retail strategy implemented in DMC district
Retail, Dining, Entertainment (RDE)
current COVID-19 assessment and markets
study conducted
RDE recruitment/retention strategy
developed, with a focus on Heart of the City
and Discovery Square that supports
residents, visitors and workers
144
5.Operating Budgets
The budget, developed to achieve the strategic objectives identified in the workplan, has been
prepared by DMC EDA and DMC City of Rochester Project Management teams with the advice of DMC
Corporation and DMC EDA board members and City of Rochester elected and administrative leaders.
•The 2021 DMC EDA funding request to the Destination Medical Center Corporation of $2,235,776,
which represents a year-over-year decrease in funding of $334,370, or approximately 15%.
•The 2021 DMC EDA funding contributed by Mayo Clinic towards the operational, project, and program
expenses of the DMC EDA totals $1,314,970, continuing the same DMC funding support provided by
Mayo Clinic in 2020.
•The 2021 DMC City of Rochester Project Management team funding request to the Destination Medical
Center Corporation is $696,215, which represents a year-over-year increase in funding of $35,691, or
approximately 5%.
2020 DMC Funding 2021 DMC Funding YOY DMC Funding Change ($)
1 Employee Services $580,808 $609,658 $28,850
$580,808 $609,658 $28,850
2 Rents and Leases $0 $2,500 $2,500
3 Adv, Publishing, & Printing $0 $7625 $7,625
4 Contractual Mtce & Repair $0 $38,000 $38,000
5 Expert and Professional Services $0 $8000 $8,000
6 Communications $0 $1,880 $1,880
7 Travel/Training/Business Mea $12,500 $6,650 -$5,850
8 Subscriptions/Bks/Membership $0 $5,075 $5,075
9 Office Supplies $0 $2,100 $2,100
10 Other Charges $0 $14,727 $14,727
11 Miscellaneous $15,900 $0 -$15,900
12 Professional Development $5,000 $0 -$5,000
13 Office $3,900 $0 -$3,900
14 Information Technology $42,416 $0 -$42,416
$79,716 $86,557 $6,841
TOTAL BUDGET $660,524 $696,215 $35,691
Subtotal
2021 DESTINATION MEDICAL CENTER CITY OF ROCHESTER PROJECT MANAGEMENT BUDGET
Staff Costs
Subtotal
Operational Costs
145
2020 DMC Funding 2021 DMC Funding YOY DMC Funding Change ($) 2020 Mayo Clinic Funding 2021 Mayo Clinic Funding
YOY Mayo Clinic Funding
Change ($)Total 2021 Budget
1 Payroll $809,396 $833,678 $24,282 $998,775 $741,560 -$257,215 $1,575,238
2 Benefits $140,809 $145,033 $4,225 $0 $0 $0 $145,033
3 Payroll Expenses $6,831 $9,620 $2,789 $0 $0 $0 $9,620
4 Transportation/Transit
Subsidy $8,446 $9,600 $1,154 $0 $0 $0 $9,600
5 Reimbursements $0 $0 $0 $0 $0 $0 $0
$965,481 $997,931 $32,450 $998,775 $741,560 -$257,215 $1,739,491
6 Rent and Utilities $1,400 $1,200 -$200 $122,695 $128,830 $6,135 $130,030
7 Equipment
Rentals/Furniture $0 $0 $0 $0 $0 $0 $0
8 Office
Supplies/Consumables $20,000 $18,000 -$2,000 $0 $0 $0 $18,000
9 Room Rental $0 $0 $0 $0 $0 $0 $0
10 Postage, and Shipping $1,500 $1,500 $0 $0 $0 $0 $1,500
11 Website Drafting/Hosting $18,310 $19,200 $890 $0 $0 $0 $19,200
12 IT Hardware, Software and
Support $25,939 $35,200 $9,261 $0 $0 $0 $35,200
13 Miscellaneous Costs $2,546 $2,784 $238 $0 $0 $0 $2,784
$69,695 $77,884 $8,189 $122,695 $128,830 $6,135 $206,714
14 Print & Collateral $40,000 $45,000 $5,000 $0 $0 $0 $45,000
15 Outreach and Local Events $107,000 $45,000 -$62,000 $0 $98,580 $98,580 $143,580
16 Subscriptions and
Memberships $5,000 $10,561 $5,561 $0 $0 $0 $10,561
17 Conferences, Meetings,
Travel & Participation $92,000 $23,500 -$68,500 $0 $0 $0 $23,500
18 Economic Development $563,200 $409,100 -$154,100 $193,500 $219,000 $25,500 $628,100
$807,200 $533,161 -$274,039 $193,500 $317,580 $124,080 $850,741
19 Legal Services $45,000 $41,400 -$3,600 $0 $0 $0 $41,400
20 Website Management and
CRM $32,770 $15,500 -$17,270 $0 $25,000 $25,000 $40,500
21
Marketing
Communications &
Advertising
$435,000 $447,500 $12,500 $0 $0 $0 $447,500
22 Strategic Public Relations $65,000 $0 -$65,000 $0 $62,000 $62,000 $62,000
23 Contracted Support Staff $65,000 $35,000 -$30,000 $0 $40,000 $40,000 $75,000
24 Financial Reporting
Services $35,000 $28,400 -$6,600 $0 $0 $0 $28,400
$677,770 $567,800 -$109,970 $0 $127,000 $127,000 $694,800
25 Insurance & Taxes $50,000 $59,000 $9,000 $0 $0 $0 $59,000
26 Miscellaneous Costs /
Contingency $0 $0 $0 $0 $0 $0 $0
Subtotal $50,000 $59,000 $9,000 $0 $0 $0 $59,000
TOTAL BUDGET $2,570,147 $2,235,776 -$334,370 $1,314,970 $1,314,970 ($0)$3,550,746
Miscellaneous Costs
2021 DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY BUDGET
Economic Development
Subtotal
Professional Services
Subtotal
Subtotal
DMC EDA Staff Costs
Subtotal
DMC EDA Operational Costs
146
DMCC
2020 Budget Worksheet and
Proposed 2021 Budget
Proposed
2014 2015 2016 2017 2018 2018 2019 2019 2020 2020 2021
Account Description Actual Actual Actual Actual Budget Actual Budget Actual Budget Actual 7/20 Budget
DMC Corporation
Revenues -5,416,447 -3,602,320 -2,288,340 -2,471,264 -2,852,106 (2,581,654) 1,161,491
Interest Earned 6 (14) 6
Building Rent 3,173 21,232 18,907 32,558 35,000 24,050 35,000 34,017 35,000 8,190 36,750 (3)
Rents and Leases 3,173 21,232 18,907 32,558 35,000 24,050 35,000 34,017 35,000 8,190 36,750
Audit Services 0 2,839 3,000 2,897 3,000 3,000 3,000 3,150 3,500 3,300 4,000 (4)
Legal Consultants 455,165 324,144 217,195 172,584 250,000 160,503 225,000 146,785 200,000 71,203 (1)(2)180,000 (5)
Accounting Consultants 0 1,144 1,000 1,800 1,500 1,050 2,000 1,100 2,000 1,150 2,000
Other Expert & Professnl Srvc 21,927 13,913 17,333 11,145 40,000 7,994 35,000 10,418 20,000 2,053 20,000
Expert & Professional Services 477,092 342,040 238,528 188,426 294,500 172,547 265,000 161,452 225,500 77,706 206,000
Travel and training 10,508 976 538 0 5,000 272 5,000 322 5,000 153 5,000
Business meal expenses 0 35 0 1,000 0 1,000 1,000 1,000
Travel/Training/Business Meals 10,508 976 573 0 6,000 272 6,000 322 6,000 153 6,000
Comprehensive Liability Ins 4,713 17,601 15,303 16,136 20,000 14,171 20,000 13,607 20,000 10,874 20,000
Insurance ‐ Misc others
Insurance and Bonds 4,713 17,601 15,303 16,136 20,000 14,171 20,000 13,607 20,000 10,874 20,000
Contractual Services
Contractual Services
Professional & Contracted Srvcs 495,486 381,850 273,311 237,120 355,500 211,040 326,000 209,398 286,500 96,922 268,750
Other Supplies
Supplies
Materials and Supplies 0 0 0 0
Interest 54 13 19 100 27 20 4
Other Charges 25 25 100 25 25
Other Charges 54 38 44 200 52 0 45 0 4 0
Expenditures 495,486 381,903 273,349 237,164 355,700 211,093 326,000 209,443 286,500 96,926 268,750
Other Financing Uses
DMC EDA Corporation - Net Revs - Exps -4,920,961 -3,220,416 -2,014,991 2,234,105 2,496,406 2,370,576 2,571,406 1,052,444 2,570,147 1,156,493
City DMCC Project Management 660,524 420,858
Keep It Local Grants - COVID-19 Response - 49,078
City Support Expenses 0 125,000 0
Total DMCC & EDA 2,471,269.43 2,852,106 2,581,668.57 2,897,406.00 1,261,886.77 3,517,171.00 1,723,355.28 268,750.00
(1) This amount reflects expenses from January - May, 2020
(2) The amount of fees due or unbilled as of July 31, 2020 is $14,123.81
(3) This amount represents a 5% increase for 2021
(4) The DMCC is issuing an RFP for audit servies in 2021. This amount represents a 14% increase for 2021
(5) This amount reflects a 10% decrease for 2021
1259557.xls
148
E.
DESTINATION MEDICAL CENTER CORPORATION
RESOLUTION NO. ___-2020
Approving the 2021 DMCC Funding Request and the Extension of Working Capital Loan
and Authorizing Transmittal to the City of Rochester
BACKGROUND RECITALS
WHEREAS, the Destination Medical Center Corporation (“DMCC”) must adopt an
annual Funding Request and Five Year Capital Plan. The DMCC Funding Request includes the
DMCC annual budget, the Destination Medical Center Economic Development Agency (“EDA”)
annual budget and work plan, and support costs incurred by the City of Rochester; and
WHEREAS, on February 26, 2015, the DMCC adopted Resolution No. 26-2015,
approving the form of and authorizing the Chair and Treasurer to execute, amend, and take other
actions to implement the working capital loan documents to provide for advance funding of DMCC
and EDA operations (collectively, the “Loan Documents”); and
WHEREAS, the DMCC has completed the required annual reconciliation of the advances
to the DMCC and the DMCC eligible expenses and has prepared a DMCC Request for Extension
of the Working Capital Loan for 2021 in the amount of $1000, as such amount may be adjusted
by the City pursuant to Section 2.8(c) of the Working Capital Loan Agreement (DMCC-City)
effective April 1, 2014, as amended; and
WHEREAS, the EDA has submitted an EDA Request for Extension of the Working
Capital Loan for 2021, requesting that the Loan Documents be extended for 2021 in the amount
of $75,000, as such amount may be adjusted by the City pursuant to Section 2.8(c) of the Working
Capital Loan Agreement (DMCC-EDA), effective April 1, 2014, as amended, and has provided
the required annual reconciliation of advances and eligible expenses paid from such advances; and
WHEREAS, the DMCC and EDA Requests for Extension of the Working Capital Loan
for 2021 are attached as Exhibit A.
RESOLUTION
NOW, THEREFORE, BE IT RESOLVED, by the Destination Medical Center Board of
Directors that the 2021 DMCC Funding Request, and the Five Year Capital Plan, each on file with
the DMCC, are approved. Further, the DMCC hereby approves the projects set forth in the first
year of the Five Year Capital Plan as public infrastructure projects within the meaning of
Minnesota Statutes Section 469.40, Subdivision 11, and consistent with the Development Plan,
adopted on April 23, 2015, as amended; provided that 1) final approval of each of the capital
projects will be subject to a later specific approval by the DMCC upon final determination of
scope, costs and availability of funds; and 2) staff is directed to provide an annual reconciliation
of budget amounts and expenditures for each of the capital projects.
149
2
BE IT FURTHER RESOLVED, the EDA Request for Extension of the Working Capital
Loan for 2021, and the DMCC Request for Extension of the Working Capital Loan for 2021,
attached as Exhibit A and on file with the DMCC, are approved.
BE IT FURTHER RESOLVED, that the Chair and Treasurer are hereby authorized and
directed to transmit this Resolution to the City of Rochester and to take such actions as are
necessary or convenient to effectuate the 2021 DMCC Funding Request, the Five Year Capital
Plan, and the extension of the Loan Documents, including, but not limited to, the authority to
execute, deliver, and perform, in the name of and on behalf of the DMCC, the DMCC Request for
Extension of the Working Capital Loan for 2021 and the Loan Documents to which the DMCC is
a party, with such modifications, additions, deletions, or other changes as the Chair and Treasurer
may deem necessary or appropriate to accomplish the requested extension, all which may be
performed without further action of this Board.
1261764-2.DOCX
150
EXHIBIT A
DMCC REQUEST FOR EXTENSION OF WORKING CAPITAL LOAN
FOR 2021
To: City of Rochester, Minnesota (the “City”)
1. The undersigned authorized representative (the “Representative”) of the Destination
Medical Center Corporation (“DMCC”) hereby authorizes and requests an extension of the
Term of the Working Capital Loan Agreement (DMCC-City), dated April 30, 2015, as
amended, by and between the City and the DMCC (the “Agreement”) and renewals of the
DMCC Note and the EDA Note, in the amount and on the date specified below, in order to
pay certain DMCC Eligible Expenses and to provide the EDA Tranche to pay certain EDA
Eligible Expenses, pursuant to the terms and conditions of the Agreement. Capitalized
terms not otherwise defined herein shall have the meanings given them in the Agreement.
2. The Representative certifies that (i) attached as Attachment 1 is a true and correct annual
reconciliation of the DMCC Tranche Advances made through June 30, 2020 and the
DMCC Eligible Expenses paid from such Advances, as required by Section 2.6 of the
Agreement; (ii) each item for which the DMCC sought payment in Attachment 1 was a
DMCC Eligible Expense; and (iii) the Advances received by the DMCC have not exceeded
the limitations set out in Section 2.4(a) of the Agreement.
3. The Representative further certifies that attached as Attachment 2 is a true and correct copy
of the EDA Request for Extension of the Working Capital Loan for 2021.
4. The DMCC hereby requests an extension of the Agreement Term and renewals of the
DMCC Note and the EDA Note, in the amount of $1,000.00 as the DMCC Tranche
Advance and in the amount of $75,000.00 as the EDA Tranche Advance, as such amounts
may be adjusted by the City pursuant to Section 2.8(c) of the Agreement, for payment of
DMCC Eligible Expenses and, as to the EDA Tranche, for payment of EDA Eligible
Expenses.
5. The Representative further certifies that no portion of the amount requested in paragraph 4
above constitutes a DMCC Excess Request under Section 2.3 of the Agreement.
6. The Representative further certifies that this statement and all exhibits and attachments hereto,
and documents furnished in connection herewith, shall be conclusive evidence of the facts
and statements set forth herein and shall constitute full warrant, protection, and authority to
the City for its actions taken pursuant hereto.
Dated: ________________, 2020
Authorized DMCC Representative
1257388-2.DOCX
151
ATTACHMENT 1: RECONCILIATION OF DMCC TRANCHE ADVANCES
Through June 30, 2020
152
ATTACHMENT 1
153
ATTACHMENT 2: EDA REQUEST FOR EXTENSION OF THE
WORKING CAPITAL LOAN FOR 2021
154
DESTINATION MEDICAL CENTER ECONOMIC DEVELOPMENT AGENCY
Approving the 2021 DMC EDA Funding Request and the Extension of Working Capital Loan
BACKGROUND RECITALS
WHEREAS, the Destination Medical Center Corporation (“DMCC”) must adopt an annual
Funding Request and Five Year Capital Plan. The DMCC Funding Request includes the DMCC annual
budget, the Destination Medical Center Economic Development Agency (“EDA”) annual budget, and
support costs incurred by the City of Rochester; and
WHEREAS, the EDA has submitted an EDA Request for Extension of the Working Capital Loan,
that the Loan Documents be extended for 2021 in the amount of $75,000, as such amount may be adjusted
by the City pursuant to Section 2.8(c) of the Agreement, and has provided the required annual
reconciliation of advances and eligible expenses paid from such advances.
RESOLUTION
NOW, THEREFORE, BE IT RESOLVED, by the Destination Medical Center Economic
Development Agency Board of Directors that the 2021 EDA Funding Request and the EDA Request for
Extension of the Working Capital Loan for 2021, are approved.
_________________________________
Jeffrey Bolton
President
ATTACHMENT 2
A2-1 155
A2-2 156
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &&SPWUHFHLYDEOHIURP(YHQWVDFFRXQW
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
2XWVWDQGLQJ&KHFN (5&RG\FKHFN
2XWVWDQGLQJ&KHFN (5FKHFN
2XWVWDQGLQJ&KHFN DUQROGV
2XWVWDQGLQJ&KHFN GDWDVPDUW
2XWVWDQGLQJ&KHFN (5FKHFN
&UHGLW&DUG &UHGLWFDUGQHHGWRPDNHDSD\PHQWIRUWKLV
&UHGLW&DUG &UHGLWFDUGFUHGLWRQDFFRXQW
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
$GYDQFH7RWDOUHFRQFLOHG
A2-3 157
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
2XWVWDQGLQJ&KHFN (5FKHFN36
2XWVWDQGLQJ&KHFN $UQROGV
2XWVWDQGLQJ&KHFN 6PLWK6FKDIHU
2XWVWDQGLQJ&KHFN 'DWD6PDUW
2XWVWDQGLQJ&KHFN $UQROGV
2XWVWDQGLQJ&KHFN (5FKHFN.%
2XWVWDQGLQJ&KHFN (5FKHFN/&
&UHGLW&DUG PLQSPW
%DQNFKDUJH %DQNIHHWUDQVIHUIXQGVIURP(YHQWV
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
$GYDQFH7RWDOUHFRQFLOHG
A2-4 158
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
&UHGLW )LGHOLW\FUHGLWEDFNRQ7$5
&UHGLW 36(5UHGXFHGE\DIWHUVXEPLWWLQJ7$5FUHGLWEDFNRQ7$5
2XWVWDQGLQJ&KHFN 6PLWK6FKDIHU(YHQWVWUDQVIHU
2XWVWDQGLQJ&KHFN (5/&
2XWVWDQGLQJ&KHFN 'DWD6PDUW
2XWVWDQGLQJ&KHFN (5/&
2XWVWDQGLQJ&KHFN $UQROGV
2XWVWDQGLQJ&KHFN
&UHGLW&DUG
%DQNFKDUJH
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
$GYDQFH7RWDOUHFRQFLOHG
A2-5 159
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
3D\UROO)LGHOLW\
%OXH&URVV%OXH6KLHOG
0LWHO
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
2XWVWDQGLQJ&KHFN )LGHOLW\
2XWVWDQGLQJ&KHFN 6WDSOHV
2XWVWDQGLQJ&KHFN 'DWD6PDUW
2XWVWDQGLQJ&KHFN $UQROGV
3D\DEOH &DVKIORZ
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
$GYDQFH7RWDOUHFRQFLOHG
A2-6 160
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
3D\DEOH $UQROGVGRXEOHSD\PHQWUHGXFHRQQH[W7$5
2XWVWDQGLQJ&KHFN 6PLWK6FKDIHU
2XWVWDQGLQJ&KHFN 0HWUR6DOHV
2XWVWDQGLQJ&KHFN 'DWD6PDUW
2XWVWDQGLQJ&KHFN $UQROGV
2XWVWDQGLQJ&KHFN (5
2XWVWDQGLQJ&KHFN (5
2XWVWDQGLQJSD\PHQW &&SD\PHQW
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
$GYDQFH7RWDOUHFRQFLOHG
A2-7 161
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
3D\DEOH $UQROGVGRXEOHSD\PHQWUHGXFHRQQH[W7$5
2XWVWDQGLQJ&KHFN (5
2XWVWDQGLQJ&KHFN (5
2XWVWDQGLQJ&KHFN (5
3D\DEOHWR(YHQWVFKHFNLQJ IRUFDVKIORZ
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
$GYDQFH7RWDOUHFRQFLOHG
A2-8 162
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
3D\DEOH
2XWVWDQGLQJ&KHFN (5
&KHFNFOHDUHG 6PLWK6FKDIHUUHQWFKHFNGRXEOHSD\PHQWFOHDUQH[WPRQWK
2XWVWDQGLQJ&KHFN (5
3D\DEOHWR(YHQWVFKHFNLQJ IRUFDVKIORZ
&&307 SD\PHQWEFDWFUHGLWOLPLW
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
$GYDQFH7RWDOUHFRQFLOHG
A2-9 163
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROOWUDQVIHUIURP(YHQWV
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
3D\DEOH
2XWVWDQGLQJ&KHFN (5
&KHFNFOHDUHG 6PLWK6FKDIHUUHQWFKHFNGRXEOHSD\PHQWFOHDUQH[WPRQWK
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
$GYDQFH7RWDOUHFRQFLOHG
A2-10 164
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
$RQWHPSGHSRVLWV
$RQWHPSGHSRVLWV
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
3D\DEOH
2XWVWDQGLQJ&KHFN (5
2XWVWDQGLQJ&KHFN $UQROG
V
2XWVWDQGLQJ&KHFN (5FKHFNV
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
&&&PLQSPW
$GYDQFH7RWDOUHFRQFLOHG
A2-11 165
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
&OHDUHGFKHFN
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
&KHFN $UQROGV
&&& VWPW
$GYDQFH7RWDOUHFRQFLOHG
A2-12 166
'0&('$
2SHUDWLQJ$FFRXQW
5HFRQFLOLDWLRQRI%DQN%DODQFHWR$GYDQFH7RWDO
%DQN%DODQFH'DWH
%DODQFHSHU%DQN
$GG
$GYDQFHLQWUDQVLWIRUH[SHQVHFOHDUHGEDQN
RUH[SHQVHVQRW\HWUHTXHVWHG
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
5HFHLYDEOH )LGHOLW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
5HFHLYDEOH &LW\SD\UROO
3D\UROO
%OXH&URVV%OXH6KLHOG
0LWHO
&OHDUHGFKHFN
/HVV
$GYDQFHIRUH[SHQVHVQRWFOHDUHG
0LVF &&& UHPDLQLQJFUHGLWFDUGFUHGLW
$GYDQFH7RWDOUHFRQFLOHG
A2-13 167
168
Transportation
To: DMCC Board of Directors
From: DMC Economic Development Agency
Date: August 21, 2020
Request of the DMCC board of directors:
• Endorse Rapid Transit initiative described in the Federal Transit Administration (FTA) application summarized
below
• Adopt five-year CIP that incorporates the funds necessary to support the local share of the Rapid Transit
funding
Background:
TRANSPORTATION STRATEGY:
The Integrated Transportation Study (ITS), adopted by DMCC and Rochester City Council in 2018 recommended
development of a robust multimodal transportation system. Based on market demand studies, forecasts for
downtown growth, and an understanding of the city’s street and infrastructure capacity, the following model
was developed:
RAPID TRANSIT CIRCULATOR:
To achieve the goal of increasing the number of transit riders, the DMCC and City of Rochester, with support
from Olmsted County, established a vision for a transit line connecting the Graham Park area with the
downtown and St. Marys areas and ultimately to Cascade Lake. This alignment provides connection to jobs,
entertainment, park space, housing, and parking infrastructure.
DMCC and Rochester City Council directed staff to advance a grant application to the Federal Transit
Administration in its 2020 application cycle, the deadline for which is August 28, 2020. The grant application
seeks 49% of the capital costs to be covered by the Federal government, with the remaining portion paid by
local sources (primarily DMC State and County Transit Aid). Click here to view the draft grant application.
To meet the August submittal deadline, it was determined that the Rapid Transit program will develop in two
phases. The first phase consists of the Second Street corridor, connecting Cascade Lake to the Government
Center. This will achieve many of the goals for the Transit system, such as providing a much better ridership
experience, reducing pressure on downtown parking, providing better transit access to residents of nearby
neighborhoods, and reducing single occupancy vehicles on Second Street.
169
The second phase, which travels north and south along Broadway, will advance once there is consensus around
the details for the terminus on this leg of the route.
Key Characteristics:
• Three-mile Bus Rapid Transit line with 8 stations
• Business access and transit (BAT) lanes.
• Saint Marys Transit Station and pedestrian access tunnel.
• Electric vehicles.
• Weekday schedule: 5am-11pm, service every 5 minutes from 6-9 am and 3-6 pm.
• Service every 10 minutes other times, including weekends.
• Weekend schedule 8 am – 11 pm.
ADDITIONAL TRANSPORTAITON UPDATES:
Downtown Rochester will continue to add new parking infrastructure, but continued employment, visitation, and
residential growth is expected to exceed parking supply. Developing an efficient and effective transportation
management system, “mobility hubs” adjacent to the downtown core, and extending Rochester’s robust
pedestrian trail network into downtown are all core strategies to addressing ongoing growth. In 2020-2021,
transportation activities include:
• Completing design and continuing construction of transit and infrastructure projects and the pedestrian
trail system
• Integrating Second Street SW/Saint Marys Campus public realm and transportation designs
• Communicating transportation planning and improvements to community and measuring the successful
implementation of the transportation plan
• Participating in autonomous vehicle pilot program
• Engaging with developers and the City of Rochester to consider system-wide parking solutions
• Identifying strategies that encourage alternative commuting habits and participating in the “Arrive
Rochester” transportation management association
Mission, Vision, and/or Goals:
The transportation element of the DMC Development Plan serves as a guiding investment strategy based on
sound market analysis and full integration with the 20-year DMC development program.
Work plan or capital improvement budget implications:
The 2020 DMC CIP includes $3.872 million for transit circulator development.
Approvals, milestones, and decision points:
February
2019
Transit hub
locations
approved
May 2019
Approval of
Locally
Preferred
Alternative
September
2019
Budget
Approval for
FTA
Application
May 2020
DMCC board
phasing and
boundary
modification
discussion
August 2020
DMCC
review of
FTA
submission
170
ROCHESTER RAPID TRANSIT
SMALL STARTS APPLICATION INFORMATION
ABOUT THE RAPID TRANSIT PROJECT
Rochester Rapid Transit is an approximately three-mile bus rapid transit
(BRT) route that will run from the West Transit Village to downtown
Rochester via 2nd Street SW, with stations at 19th Avenue, Saint Mary’s
Hospital, 6th Avenue, 2nd Avenue, 1st Avenue, and on 4th Street near 3rd
Avenue. Rapid Transit stations will include shelter, heat, level boarding,
real-time passenger information, and off-board fare payment. At the
Saint Marys Hospital station, a transit center will be constructed on the
north side of 2nd Street SW along with a pedestrian tunnel connecting
the hospital and transit center.
Rapid Transit will likely operate in business access and transit (BAT) lanes
for most of its length and transit signal priority will be implemented along
the route. The direction of travel for the loop has yet to be determined.
The rapid transit service will use seven electric articulated vehicles of an
11-bus fleet with unique branding. Depot chargers located at the existing
Rochester Public Transit operations and maintenance garage will charge
vehicles overnight.
ROCHESTER RAPID TRANSIT
SMALL STARTS APPLICATION INFORMATION
ABOUT THE RAPID TRANSIT PROJECT
Rochester Rapid Transit is an approximately three-mile bus rapid transit (BRT)
route that will run from the West Transit Village to downtown Rochester via 2nd
Street SW, with stations at 19th Avenue, Saint Mary’s Hospital, 6th Avenue, 2nd
Avenue, 1st Avenue, and on 4th Street near 3rd Avenue. Rapid Transit stations
will include shelter, heat, level boarding, real-time passenger information, and
off-board fare payment. At the Saint Marys Hospital station, a transit center
will be constructed on the north side of 2nd Street SW along with a pedestrian
tunnel connecting the hospital and transit center.
Rapid Transit will likely operate in business access and transit (BAT) lanes for
most of its length and transit signal priority will be implemented along the
route. The direction of travel for the loop has yet to be determined. The rapid
transit service will use seven electric articulated vehicles of an 11-bus fleet with
unique branding. Depot chargers located at the existing Rochester Public
Transit operations and maintenance garage will charge vehicles overnight.
Rochester Rapid Transit
by the numbers:
• 3 Miles
• 8 Stations
• Service every 5
minutes during peak
periods, every 10
minutes other times
• Estimated opening day
ridership: 11,000 trips
• Cost to construct: $114
million
• Annual cost to
operate: $2.82 million
ROCHESTER RAPID
TRANSIT
BY THE NUMBERS:
3 Miles
8 Stations
Service every 5 minutes during
peak periods, every 10 minutes
other times
Estimated opening day
ridership: 11,000 trips
Cost to construct: $114 million
Annual cost to operate:
$2.82 million
171
SMALL STARTS OVERVIEW
The Federal Transit Administration funds transit capital investments such as bus rapid transit through its Capital
Investment Grants Program. Within the Capital Investment Grants Program, FTA has three funding streams:
Core Capacity, New Starts, and Small Starts. Small Starts is for projects with capital costs of less than $300
million and federal funding requests lower than $100 million. Rochester Rapid Transit is a Small Starts Project.
Federal law requires transit agencies seeking Capital Investment Grants funding to complete a series of steps
over several years. The law also requires projects’ characteristics and project sponsors’ finances to be rated by
FTA at various points in the process.
The Small Starts application that the City of Rochester will submit this August will allow FTA to rate the project.
Projects that receive an overall rating of “medium” or better are eligible for federal funds. The timeline for receipt
of federal funds is uncertain and at the discretion of the federal government. A higher rating does not necessarily
mean that a grant award will be made sooner. Available funds, political persuasion, and the mix of projects in the
queue are all factors in the timing of the grant.
SMALL STARTS APPLICATION
To develop a rating of the project, FTA requires local
project sponsors, such as the City of Rochester, to
submit an application that responds to two sets of
criteria as set forth in transportation law:
• Project justification criteria: These criteria
measure the anticipated benefits and costs
of implementing the Rapid Transit project.
They include mobility improvements (project
ridership), environmental benefits, congestion
relief, economic development effects, land use,
and cost-effectiveness.
• Local financial commitment criteria: These
criteria measure the extent to which the City of
Rochester has stable and dependable financing
sources to construct, maintain, and operate the
transit system while continuing to maintain and
operate RPT.
Each criterion is rated by FTA on a five-point scale,
from low to high. Summary project justification and
local financial commitment ratings are prepared
and combined to arrive at an overall project rating.
172
PROJECT JUSTIFICATION CRITERIA
FTA will determine the project’s ratings based on project data submitted by the City of Rochester. Each criterion
is explained in more detail below and includes the project team’s estimated rating based on project information
gathered to-date and the consultant team’s prior experience on FTA Capital Investment Grants. Each of the six
criteria are weighted equally (16.66 percent) in the total project justification score. Estimates are not a guarantee
of rating outcomes.
Mobility
improvements
(16.66%)
This criterion measures annual ridership on the project. Trips taken by
transit dependent persons are counted twice. Trips on the project that
are transfers from other bus routes also count.
Estimated
rating:
Medium-
Low
Environmental
benefits
(16.66%)
This criterion measures the dollar value of the anticipated direct and
indirect benefits to human health, safety, energy, and the air quality.
These benefits are computed based on the change in vehicle miles
traveled (VMT) resulting from implementation of the proposed project.
Estimated
rating:
Medium-
Low
Congestion
relief
(16.66%)
FTA evaluates congestion relief based on the number of new weekday
transit trips resulting from implementation of the project. This is an indirect
measure of roadway congestion relief resulting from implementation of
a transit project, but it serves as an indicator of potential cars taken off
the road.
Estimated
rating:
Medium
Cost
effectiveness
(16.66%)
FTA measures cost effectiveness on Small Starts projects by dividing the
annualized federal share of the project’s capital cost by the total annual
trips on the project. (The federal share of the capital cost is 49%.)
Estimated
rating:
Medium-
High
Land use
(16.66%)
FTA rates a project’s land use based on existing conditions:
• Corridor and station area development and development character
• Station area pedestrian facilities, including access for persons with
disabilities
• Corridor and station area parking supply
• The proportion of legally-binding affordability- restricted housing
within the project’s station areas to the proportion of legally-binding
affordability-restricted housing in Olmsted County
Estimated
rating:
Medium-
Low
Economic
Development
(16.66%)
This criterion measures the extent to which the transit project is likely
to induce additional, transit-supportive development in the future. It is
based on a qualitative examination of local plans and policies to support
economic development proximate to the project. Preparation of the TOD
plans in 2019-2020, New Rapid Transit for a Growing Equitable Rochester,
was key to a strong rating on this criterion.
Estimated
rating:
Medium
Overall Project Justification Rating Medium
173
LOCAL FINANCIAL COMMITMENT CRITERIA
FTA will determine the project’s local financial commitment rating based on a financial plan and 20-year cashflow
submitted by the City of Rochester. Each local financial commitment criterion is explained in more detail below
and includes the project team’s estimated rating based on Rochester Public Transit and City of Rochester financial
information gathered to-date. Estimates are not a guarantee of rating outcomes.
Current
Condition
(25%)
FTA will base the rating for this criterion on RPT’s average fleet age, current
asset to liability ratio, and to a lesser extent, recent bond ratings and recent
service history.
Estimated
rating:
Medium-
High
Commitment of
Funds
(25%)
FTA’s rating on this criterion is based on the percentage of funds (both
capital and operating) that the City and its partners have committed or
budgeted versus those considered only planned or unspecified.
Estimated
rating:
Medium-
High
Reliability/
Capacity
(50%)
To rate the project on this criterion, FTA will evaluate the reasonableness
of the capital cost estimate and the capital and operating planning
assumptions, adequacy of meeting state of good repair needs, and the
City’s financial capacity to withstand cost increases or funding shortfalls.
Estimated
rating:
Medium-
High
FTA Funding
If the FTA Capital Investment Grant comprises less than 50% of the capital
cost of the project, the financial rating is increased one level. Rochester
requests 49% of the capital cost from FTA.
Overall Financial Rating High
ESTIMATED OVERALL RATING
Combining the medium rating on the project justification criteria and the high rating on the local financial
commitment criteria results in an overall rating estimate of medium-high. The estimated ratings are based upon
review of FTA’s guidance and experience working with communities and agencies on FTA Capital Investment
Grant projects. This estimate is not a guarantee of rating outcomes.
PROJECT NEXT STEPS
Preliminary engineering on the project is underway and several major project decisions are on the horizon.
• The project team has been working on the design of business access and transit (BAT) lanes on 2nd Street.
This fall, the team will reach out to property/business owners along the alignment that may be affected by
changes in access or parking as a result of the implementation the BAT lanes.
• A traffic analysis is underway for the entire corridor. Later this fall, public meetings, neighborhood meetings,
and small-group meetings will be held virtually (and in-person if possible) to share the outcomes of the traffic
analysis with interested residents.
• This fall, an increased public engagement effort will be implemented which will include assembling a group
of interested residents and stakeholders to participate in the station architecture and design process.
• The environmental review process (NEPA), which includes an assessment of traffic impacts on surrounding
neighborhoods, will begin this fall.
174
2020 2021 2022 2023 2024 2025
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Rochester Rapid Transit Timeline and Milestones July 2020
TestingTesting
Co design process starts
Public engagement on station architecture and design
Public engagement on guideway design
Public engagement on tra c changes
Con rm loop direction
Con rm platform locations
30% design plans complete
Submit application Project rating published*Application resubmittal**Small Starts Grant Agreement***
*If project receives a rating of medium or better it is eligible for a Small Starts grant. Timing of the Small Starts grant is at the discretion of the federal government.
**Only if project has changed substantially.
***Award of the Small Starts grant is at the discretion of the federal government. Date shown is an estimate.
Publish environmental document
Opening
Day
FTA Capital Investment Grant Program: Small Starts FTA Capital Investment Grant Program: Small Starts
Final DesignFinal Design
ConstructionConstruction
Traffi c AnalysisTraffi c Analysis
Station Architecture and DesignStation Architecture and Design
National Environmental Policy Act ProcessNational Environmental Policy Act Process
Submit class of action to FTA
Preliminary DesignPreliminary Design
BRT Guideway DesignBRT Guideway Design
Prepare Small Starts readiness package
Public engagement on environmental document contents
Public engagement on environmental fi ndings
175
176
F.
DESTINATION MEDICAL CENTER CORPORATION
RESOLUTION NO. ___-2020
Approving Downtown Rapid Transit Small Starts Funding Application
Submittal to the Federal Transit Administration’s Capital Investment Grant
Program
BACKGROUND RECITALS
By Resolutions 87- and 89-2019, the Destination Medical Center CorporationA.
(“DMCC”) considered the route alignment and mode for the Downtown Rochester Rapid Transit
Project (“the Project”) and adopted a locally preferred alternative (“Locally Preferred
Alternative”) for route and alignment (2nd Street and Broadway) and mode (bus rapid transit, or
“BRT”), subject to approval by the City of Rochester (the “City”). The City subsequently
approved the Locally Preferred Alternative on November 18, 2019 and submitted a request to the
Federal Transit Administration (“the FTA”) to enter the Project Development phase as part of the
FTA Capital Investment Grant Program. On February 10, 2020, the Project was granted entry
into the FTA Project Development phase.
On May 4, 2020, the City approved a phased implementation strategy for theB.
Locally Preferred Alternative. The first phase of the refined Locally Preferred Alternative consists
of BRT from the Mayo West Lot to downtown Rochester. On May 28, 2020, the DMCC
approved a phased implementation of the Locally Preferred Alternative.
By Resolution 98-2020, the DMCC initiated a boundary modification process toC.
adjust the development district, the geographic area in the City, identified in the Development
Plan (adopted on April 23, 2015, as amended) in which public infrastructure projects are
implemented as the Destination Medical Center development district (“the Development District”)
to include the route and transit village location for Phase 1 of the Locally Preferred Alternative,
known as the West Transit Corridor.
Staff from the City and the Destination Medical Center Economic DevelopmentD.
Agency (“EDA”) were directed to advance a Small Starts grant application to the FTA in its 2020
application cycle, and now recommend it for approval.
The City approved the Downtown Rapid Transit Small Starts Funding ApplicationE.
(the “Application”) on August 17, 2020.
RESOLUTION
NOW THEREFORE, BE IT RESOLVED, by the Destination Medical Center
Corporation Board of Directors that it approves submittal of an application for funding of the
Downtown Rapid Transit Locally Preferred Alternative, to the FTA Small Starts Program, subject
177
to approval by the Rochester City Council, which approval was granted on August 17, 2020. The
Application is dated August 28, 2020, and is on file with the EDA and City offices.
BE IT FURTHER RESOLVED, that the DMCC ratifies and supports the Project and
the Locally Preferred Alternative, as evidenced by the allocation of funding in its Five-Year
Capital Improvement Plan of even date.
BE IT FURTHER RESOLVED, that staff from the City and EDA are requested to
establish regular milestones for reporting the benchmarks and progress of the Application process
to the DMCC.
BE IT FURTHER RESOLVED, that the further evaluation, analysis, planning and
design with respect to the Downtown Rochester Rapid Transit Locally Preferred Alternative,
including preparation for and submission to the FTA, are deemed to be arising from and in
furtherance of the Integrated Transit Studies, and the DMCC approves this work as a public
infrastructure project within the meaning of Minnesota Statutes Section 469.40, subdivision 11,
and consistent with the Development Plan.
BE IT FURTHER RESOLVED, that the Chair or Secretary is authorized to take such
actions as are necessary and appropriate to effectuate the terms of this Resolution and the timely
progression of the Application and approval process.
1261891-4.DOCX
2
178
Heart of the City
To: DMCC Board of Directors
From: DMC Economic Development Agency
Date: August 21, 2020
Request of the DMCC board of directors:
• No Action Requested
Background:
2020 Peace Plaza Construction
Restoration of its public space, Peace Plaza and the adjacent street, has been in the planning stage for
several years. It is a transformative common ground project that includes improved safety, accessibility,
universal design elements, sustainability, integrated art, and improved infrastructure to enhance the overall
user experience.
Work started on the Heart of the City Phase One Construction on April 6, 2020. Prior to construction
beginning, a hyper-local focused strategy to reach potential local and regional sub-contractors was put into
place. As a result of this initiative, 40% of the bid packages were awarded to Rochester-based businesses
and a total of 92% were from Minnesota. Original bids, including construction procedures designed to
minimize disruption to existing businesses, came in well in excess of the original project budget.
Subsequently, bid documents were rewritten and the project rebid with certain components treated as
optional additional alternates pending review of all bids. Both Rochester City Council and DMCC authorized
the inclusion of the add-alternative for a snow melt system, requiring an additional $1.6 million
expenditure over original budget. Source of funds for $1.6 million is the CIP.
Business Forward Construction
DMC EDA, City of Rochester, and other partners have been working with Heart of the City property owners,
business operators, and community stakeholders to design a construction process intended to minimize
negative impact on nearby businesses through improved construction communications, scheduling, and
pace. As previously shared, there is a cost premium associated with implementing a “business forward”
approach of approximately 8% of project costs. These additional expenses have been absorbed in the
overall project costs listed above.
Business Forward is a construction strategy that focuses on encouraging pedestrian traffic and supporting
the local businesses. It is a priority for the project team and extremely important for the vitality of Heart of
the City during the disruption. While preparing for construction, the project team met with the businesses
and landowners in the area to understand their needs during construction. The information gathered from
many stakeholders, including the Rochester Downtown Alliance and Rochester Chamber of Commerce,
informed the Business Forward Strategy.
Business Forward principles include:
• Access, Safety and Smart Micro -Construction Phasing
• Communication
• Activation and Programming
These principles are being applied in ways that are mindful of the social-distancing and other safety
precautions necessary to avoid COVID-19 transmission.
179
Since the start of the construction, the team has continually evaluated ways to accelerate the schedule:
1. Earthwork and utility crews have been working 60+ hours per week through the duration of the project.
2. The project required 2 – 3 utility crews to be working simultaneously on the different areas of the
project (2nd Street, Peace Plaza, and 1st Avenue). This allowed work to be completed simultaneous to one
another and would have taken an average of 2.5 times as long if it were bid with one crew.
3. The rock trencher was an innovative solution that drastically reduced the time, sound and dust for the
extensive rock removal.
6. Micro-phasing to support the business forward initiative which has been accelerated to finish areas of
the project this year that were originally planned to be completed next year.
These improvements, plus continual aggressive planning will have a dramatic impact on the final
completion dates benefiting the local businesses and community. The team feels that the following dates
are achievable with a favorable winter.
Project Component Original Schedule New Schedule
• Second Street Completion 09/28/2020 08/25/2020
• First Avenue South 07/28/2021 03/01- 07/01/2020
• First Avenue North 08/20/2021 12/23/2020
• Peace Plaza 08/13/2021 06/15/2021
Chateau Theatre
The Chateau Theatre is now open to the public. The operator, EDG, is abiding by the Governor’s executive
orders and limiting the number of patrons in the building. EDG is working with city staff, Mayo Clinic, DMC
and other local organizations to adjust programming during this time. It is anticipated that the Chateau will
host a local art bazaar and other acceptable socially distanced activities.
Galleria/University Square
Preliminary discussions have been initiated with the owners of Galleria/University Square around strategies
to advance the DMC vision of connecting Mayo Civic Center to Mayo Clinic’s Gonda building via street level
public realm.
Fulfilling the DMC Vision, Mission, and/or Goals:
Heart of the City subdistrict is a long-standing priority for the DMC Corp. board. It is home to many hotels,
restaurants, entertainment venues, and medical facilities, many of which have been undergoing
reinvestment. Transformation of the public realm, Peace Plaza, will be an asset to the downtown core,
improve the patient, visitor and resident experience, and help spur future investment.
Work plan or capital improvement budget implications:
This project is funded via state GSIA funds generated through the DMC initiative, approved by both DMCC
and Rochester City Council.
Approvals, milestones, and decision points:
2016
Heart of City
redesign
commenced
2018
Schematic
design
approved, CIP
authorized
2019
Construction
documents
completed
and bidding
initiated
2020
Contracts
awarded.
Request for
additional
spending.
2021
Anticipated
completion
180
Discovery Square
To: DMCC Board of Directors
From: DMC Economic Development Agency
Date: August 21, 2020
Request of the DMCC board of directors:
• No action requested
Background:
• Economic Development Activities
o Continue business development and recruitment activities to pitch Discovery Square as the
best place in Minnesota for companies that want to grow.
o Medical Alley has been working with DMC and others to develop a start-up initiative program
in Rochester.
• Discovery Walk
o On June 15, 2020, the Rochester City Council approved the scope of services with Coen+Partners
for development documentation, construction documents, bidding, community engagement
and construction administration. Groundbreaking planned for Q4 or 2021.
o The Design Team includes DMC, City of Rochester, Coen+Partners, Knutson Construction as
owner’s representative, EZ Fabricating, Latent Design, Kimley-Horn, White Space Design and
community co-designers from under-represented communities
o A call for regional artists (Olmsted County) for art integration within overall design has been
initiated with up to four artists to be selected.
o Stakeholder engagement continues with businesses and neighborhood associations
• Discovery Square 2
o Mortenson working aggressively to advance DS2 with an anticipated groundbreaking in
Sept/Oct 2020
o Development Assistance Agreement and establishment of TIF District approved on April 20th
o Finalizing parking solution with various stakeholders parking solution, working with various
stakeholders.
o Tenant recruitment plans and discussions continue with potential tenants.
• One Discovery Square
o 90% leased, some of the remaining space being fitted out as turn-key space.
• Entrepreneurship activities
o DMC part of the SE Minnesota Entrepreneurship grant award from Launch MN initiative.
o The DMC Assistive Tech Challenge held on June 2, 2020. Had 34 applications from seven states,
one US territory, and Canada. Event had 156 Zoom viewers and 20 Facebook live viewers,
overall 42% of viewers were from outside of Minnesota. Open division winner was Recruitable
IDD Employment from Bethel University. Professional division winner was Braze Mobility from
Toronto)
181
• Discovery Square residential and retail activities
o The Maven now leasing - residential and retail space.
o The Residence Discovery Square now leasing - residential and retail space.
o The Hue (formerly “324 Apartments”) under construction, Minnwest Bank first retail tenant.
Fulfilling the DMC Mission, Vision, and/or Goals:
Discovery Square is a new address for the future of bio-medical, research and technology innovation and
a keystone to the DMC economic development strategy. The sub-district borrows from Mayo Clinic’s
integrated care model to create an integrated district founded in the principles of translational
medicine.
Technology and innovation are core to the DMC economic strategy. Our vision is to promote an
economic development structure that fosters advancement and growth of the medical, research,
innovation, education, entrepreneurial and general business environment in Rochester.
By attracting new businesses, supporting the launch and development of new startup businesses, and
creating new public realm space, we aim to diversify the local economy, create jobs, generate new tax
revenue, and create a place that fosters a vibrant community and attracts the workforce of the future.
Work plan or capital improvement budget implications:
The current DMC work plan describes a variety of initiatives supported by DMC 2020 operating and CIP
funds, including the design documentation of Discovery Walk.
Approvals, milestones, and decision points:
November
2017
One
Discovery
Square
ground-
breaking
October 2019
Discovery
Walk CIP
approved for
Design doc.
February
2020
Discovery
Square 2
approved
May 2020
Discovery
Square
Update
2020/2021
Discovery
Walk RFP
approval
182
I am pleased to provide you with the Destination Medical Center Economic Development Agency July 2020 Monthly
Report. This monthly report highlights projects and activities within the DMC District, economic development, finances,
sustainability, experience, marketing & communications, and community engagement.
-Lisa Clarke, Executive Director
July 2020
Visitor Info Booth
in Heart of the City
183
'HYHORSPHQW3URMHFWs in the DMC District
1
184
2
'HYHORSPHQW3URMHFWs in the DMC District
185
Finance
Economic Development
•In response to COVID-19 the DMC EDA team has completed operational cost reductions and budget management.
Work continues with resource allocation and prioritization.
Sustainability
July 2020 Updates
3
•Berkman Apartments- Completed June 2020.
•Wells Fargo Renovation- Completed spring 2020.
•Hyatt House- Anticipated completion spring 2021.
•Discovery Square Two- Funding approved, anticipated ground breaking September/October 2021
•Titan Hilton Hotel- Completed spring 2019.
•The Maven on Broadway - Completed summer 2019.
•One Discovery Square- Completed summer 2019.
•Hotel Indigo- Hotel completed early 2020, restaurant under construction.
•Transportation- While retaining prior approved Locally Preferred Alternative for the Rapid Transit route, the DMC Corporation board on May 26, 2020 adopted a
phased implementation strategy along with initiating the boundary modification process to adjust the DMC Development District to include route and transit village
location for Phase I. Route: connecting a, (Phase I) transit village at Mayo Clinic-owed property near Cascade Lake to a, (Phase II) transit village potentially at
Olmsted County-owned property. Mode: high amenity rapid transit (electric bus vehicles). Staff continue the engineering and environmental analyses and
formalizing agreements with property owners with the intent to submit a Federal Transit Administration grant application by September 4, 2020.
•Heart of the City phase one construction work started on April 6, 2020. Prior to construction starting a hyper-local focus strategy to reach potential local and
regional sub-contractors was put into place. Rochester City Council authorized the inclusion of the add alternative for the snow melt system ($1.6m) for both the
sidewalk and roadway within the project conditional of the DMC Corp. board approval on additional CIP funding. This action was supported by the board at the
May 2020 DMC Corp. board meeting. DMC continues to lead a robust engagement strategy to minimize negative impact on nearby businesses.
•Discovery Walk continues to move forward with design documentation work with Coen+Partners, DMC and City staff. City For Health initiative has been meeting
regularly with under-represented communities for a series of co-design activities intended to incorporate their needs into the Discovery Walk design. The
Discovery Walk next steps toward completion of design and construction documents was approved at a City Council meeting in June, 2020.
•Chateau Theatre construction and installation of exhibits have been completed. Chateau Theatre has reopened after being temporary closed due to COVID19 .
DMC funded project updates:
•Energy Integration Committee (EIC) – The EIC continues to work on the projects identified in the strategic project plan including the 2nd
partners, a large-scale solar installation led by RPU and completing analyses on two downtown district energy studies.
•Voluntary Energy Benchmarking - The DMC and City released a summary energy benchmarking report in February 2020 on the inaugural
program. The 2020 participants are working to submit data. The goal is to have 120 buildings participate this year.
•Sustainability Series – In July, DMC invited a speaker from HGA architects, Lauren Piepho, to provide a presentation on mass timber, its
applicability to development projects in the United States and beneficial environmental impacts. 35 people attended the virtual
presentation.186
Traffic to DMC.MN:
•July traffic showed 4,872K visits and 8,612K pageviews
•Top pages: Home page, Heart of the City, Maps, Events, What is DMC?
•Top 5 states: Minnesota, New York, Illinois, District of Columbia, California
•Top 5 cities outside of Rochester: Minneapolis, New York, Chicago, Washington, Little Rock
Social Media:
Marketing &
Communications
•The DMC Team continues to meet with community members and groups on numerous topics. Most recently the DMC Team has
started to focus on conversations with different community groups regarding Rochester’s recovery strategy (in partnership with
other organizations). During these conversations, DMC is documenting feedback and sharing the feedback with other
organizations as well.
•Engagement specific to the Heart of the City construction continues. Weekly Zoom stakeholder meetings are held to provide
construction updates and identify opportunities for improvement when working with business in the impacted area. A weekly
newsletter is also published with important construction and Business Forward updates, and links to community partner resources.
DMC, City of Rochester, Rochester Downtown Alliance, Rochester Area Chamber of Commerce and Mayo Clinic are all in
attendance to listen and take feedback on impact of construction and COVID in the downtown area.
•DMC is working with the Rochester Downtown Alliance and Experience Rochester to provide additional visitor and community
member support in and around the downtown area. A temporary information booth has been installed to provide extra help to
visitors of Rochester. Additional seating, cleaning, and programing have been implemented on the west side of the Peace Plaza,
including the Heart of the City construction site.
Community
Engagement
Experience
4
Newsletter:
July 2020 Updates
•Two newsletters were delivered to 3,941 subscribers in July. The average
open rate was 24.4% (industry average: 21.8%) and the average click rate
was 5.0% (industry average: 2.2%).
DMC Marketing Campaign:
•July Digital Display
1.1M impressions; 668 clicks and average click through rate of 0.06%
•July Paid Search
9,212 impressions; 347 clicks and average click through rate of 3.77%.
Blog
•Six blogs were published in July.
•Social media channels that saw growth in June included Facebook (+2),
Twitter (+25) LinkedIn (+27) and Instagram (+34)
Media News Stories:
•In July, 44 DMC- related stories were published in the media and 228 social
media mentions.
Highlights:
•RecruitABLE Job Board
•Rochester Developing Long-Range Plans for AMPI, KMART Sites
•Sustainable Building with Mass Timber
•Rochester Ready Embraces City Mask Requirement
•How Quick Collaboration Led to Downtown Rochester’s Creative Outdoor Dining
•Downtown Rochester Gets Daily Cleaning
187
188
Organizational Response to COVID-19
To: DMCC Board of Directors
From: DMC EDA Staff
Date: August 21, 2020
Overview:
Current environment and key assumptions
• Economic recovery will be measured in months and/or years
• The global pandemic has affirmed Rochester’s and Mayo Clinic’s position as the global center
for health care and research
• Continued local, state, and federal stimulus programs could provide resources for jobs and
public infrastructure investment
• DMC is an economic development initiative; our efforts should focus on economic recovery and
resilience
• Proactive efforts by DMC complement community, regional, state and federal responses
• DMC should do what it can to blunt the harsh effects of this economic crisis and ensure that
our economy is in the best possible position when it subsides
DMCC Executive Committee direction
• Accelerate job creation
• Keep our foot on the gas
• Support economic recovery and resilience
Development Plan Five Year Update
• Progress in Phase 1 (2015-2019)
• DMC Phase 1 Priorities: Heart of the City, Discovery Square, Transportation
• DMC Goals
• Possible COVID-19 impacts on update to plan
DMC EDA operations and work plan
• Operations
o Staff safety
o Cost reductions and budget management
• Work Plan
o Reprioritization based on key assumptions, direction from DMCC executive committee,
and available staff and budget resources
o Assessment and redeployment of DMC EDA budget resources
o Development of new and innovative strategies and tactics to achieve work plan objectives
and continue to establish DMC as a leader in economic recovery and resiliency
189
Recent Activities Include:
Initial COVID funding has been provided to purchase Jersey barriers. Due to the regulations on
decreased occupancy levels in restaurants and bars expanding outdoor dining has been a create
solution to serving more customers. The Jersey barriers were provided to several downtown
restaurant and bars in order to provide an innovative solution for safe seating outdoors.
190
Destination Medical Center Economic Development Agency
&
City of Rochester DMC Project Management Team
2020 Workplan
Updated:
August 14, 2020
191
Table of Contents
1. EXECUTIVE SUMMARY
2. CITY OF ROCHESTER DMC PROJECT MANAGEMENT RESPONSIBILITIES
3. DMC EDA STATUTORY ROLE AND RESPONSIBILITIES
4. WORKPLAN OUTCOMES TO ACHIEVE 2020 STRATEGIC PRIORITIES AND DMC GOALS
1. Executive Summary
In 2020, the Destination Medical Center (“DMC”) initiative will focus on pursuing the strategic priorities endorsed by the
Destination Medical Center Corporation Board of Directors and the City of Rochester Common Council in order to achieve the
goals of the DMC initiative.
Anchored by the DMC Development Plan and influenced by the engagement and participation of our stakeholders, the
Destination Medical Center Economic Development Agency (“DMC EDA”) and City of Rochester DMC project management team
will continue to pursue the goals of the DMC initiative.
DMC GOALS
• Create a comprehensive strategic plan
• Leverage the public investment to attract more than $5 billion in private investment
• Create approximately 30,000 new jobs
• Generate up to $8.0 billion in new net tax revenue over 35 years
• Achieve the highest quality patient, companion, visitor, employee, and resident experience
2020 STRATEGIC PRIORITIES
• Transportation
• Common Ground
• Housing
• Workforce
• Transformative Projects
• Sustainability
Additionally, the DMC EDA and City of Rochester DMC project management staff have incorporated significant business
development, marketing, experience, and community engagement initiatives into the 2020 workplan in order to support these
strategic priorities. The workplan outlines the objectives and defines the resources necessary to advance the 2020 DMC
strategic priorities.
2. City of Rochester DMC Project Management Team Responsibilities
In January 2019, the Destination Medical Center Corporation approved a proposal to assign new and existing DMC-
related project management responsibilities to DMC-dedicated City of Rochester staff. The City of Rochester DMC
Project Management team supports the DMC initiative in these areas:
• WMBE and Targeted Business Outreach and Compliance
• Subdistrict development
• Transportation infrastructure and multi-modal transit
• Housing
• Experience
• Grant development
192
3. DMC EDA Statutory Role and Responsibilities
The DMC EDA assists the Destination Medical Center Corporation (“DMCC”) and the City of Rochester (“City”) in
implementing the development planning and promotion, development services, and marketing, outreach and
communication activities required to achieve the goals of the DMC development plan.
The DMC legislation identified several key responsibilities of the DMC EDA in addition to its role as an advisory agency
to the DMCC and City:
• Drafting and implementing the development plan, including soliciting and evaluating proposals for
development and evaluating and making recommendations to the DMCC and the City regarding those
proposals
• Seeking financial support for the DMCC, the City, and projects
• Partnering with other development agencies and organizations, the city, and the county in joint efforts to
promote economic development and establish a destination medical center
• Supporting and administering the planning and development activities required to implement the development
plan
• Developing and updating the criteria for evaluating and underwriting development proposals
• Providing transactional services in connection with approved projects
• Working with the corporation to acquire and facilitate the sale, lease, or other transactions involving land and
real property
• Assisting the DMCC or City and others in applications for federal grants, tax credits, and other sources of
funding to aid both private and public development
• Facilitating private investment through development of a comprehensive marketing program to global interests
• Developing patient, visitor, and community outreach programs
• Preparing and supporting the marketing and promotion of DMC
• Preparing and implementing a program for community and public relations
193
4. Workplan To Achieve 2020 Strategic Priorities and DMC Goals
STRATEGIC PRIORITY: TRANSPORTATION
Create the integrated transportation infrastructure necessary to provide access to and through downtown
Rochester and encourage additional opportunity for development and investment.
2035 Goal Phase 2 (2025)
Goal 2020 Outcome
Reduce drive- alone
mode share to 50%
or less
Reduce drive-
alone mode share
to 58%
Create Integrated Transit Studies implementation monitoring system
Identify five Transit-Oriented Development sites and partners
Evaluate suitability of autonomous vehicles as a transit option
Advance development of transit line
Complete City Loop implementation and location plan
Promote additional mobility modes, including last-mile & micro-mobility
options
Establish long-term Arrive Rochester TMA governance strategy
Increase Arrive Rochester TMA business and individual participation
STRATEGIC PRIORITY: COMMON GROUND
Design and develop public spaces and amenities to incentivize additional private investment, create unique
experiences, and increase downtown density.
2035 Goal Phase 2 (2025) Goal 2020 Outcome
$5.6 billion of
private investment
$1 billion+ of new private
development underway
Facilitate/support Community and Education subdistrict
development efforts
Advance Saint Marys Place transit corridor
and pedestrian experience planning
Completion of Peace Plaza
renovation
Renovation of first phase of Heart of the City’s Peace Plaza
significantly underway
Heart of the City property owners report minimal business
disruption
Achieve highest
quality patient,
visitor, resident
experience
Discovery Walk construction
completed, activities take
place regularly,
New development is being
considered
Discovery Walk stakeholder group engaged and supportive
of activities and outcomes
Discovery Walk design and construction documents completed,
construction bids received
STRATEGIC PRIORITY: HOUSING
Contribute to a robust mix of housing infrastructure in the DMC District that creates density, sustains
additional commercial and entertainment activity, develops a greater sense of community, and provides for
our growing workforce.
2035 Goal Phase 2 (2025)
Goal 2020 Outcome Status
Show quantifiable
improvements in the
availability of housing in
DMC District - inclusive of
housing type and
affordability.
Will identify
metrics in 2019
housing study
Document progress towards identified housing goal from 2019
affordable housing study; include targets for affordable, senior and
student housing
194
STRATEGIC PRIORITY: WORKFORCE
Contribute to our innovative workforce by supporting projects and programs that recruit and retain bio-
med-tech students, employees, employers, and entrepreneurs and encourages the sustainable growth of
our regional construction and building trades economy.
2035 Goal Phase 2 (2025) Goal 2020 Outcome Status
Create 30,000 new
jobs, including 3,230 in
bio-med-tech
100 interns placed annually in
bio-med- tech businesses, with
10% transitioning
into employment in Rochester
Students placed in Discovery Square businesses
Ensure compliance
with specific
requirements of the
DMC Act
Attain state MBE/WBE targets
for SE MN
Operationalize MBE/WBE
program for all DMC projects
STRATEGIC PRIORITY: TRANSFORMATIVE PROJECTS
Pursue high-impact, market-changing development opportunities that advance the DMC Goals and Mission
and maximally leverage DMC resources.
2035 Goal Phase 2 (2025) Goal 2020 Outcome Status
Develop 1.02M SF
new bio-med,
health tech space
Develop 330,000 SF of Bio-
Med-Tech space
Affordable Discovery Square startup
and bridge space available
Discovery Square Two design complete
and construction underway
$5.6 billion of private
investment
$1 billion+ of new private
development underway Advance Downtown Waterfront redevelopment
planning
Five new private
development
projects underway At least one new private development project underway
STRATEGIC PRIORITY: AMERICA’S CITY FOR HEALTH
Ensure that public infrastructure investment supports a more healthy community, citizenry, and built and
natural environments.
2035 Goal Phase 2 (2025) Goal 2020 Outcome Status
Show quantifiable
improvements in
community health measures
Apply health in design
process to 5
infrastructure projects
Apply replicable health in design process to
Discovery Walk
STRATEGIC PRIORITY: EXPERIENCE AND COMMUNITY ENGAGEMENT
Achieve the highest quality patient, visitor, and community member experience both now and in the future.
2035 Goal Phase 2 (2025) Goal 2020 Outcome Status
Achieve highest quality
patient, visitor, resident
experience
Will identify metrics in
proposed experience
master plan
Sustain and grow community support for
the DMC Development Plan
Create strategies, programs and services that support
a world class destination and enhance the experience
for patients, visitors and residents
195
STRATEGIC PRIORITY: SUSTAINABILITY
Foster the culture, best practices, and development processes necessary to create a more healthy,
sustainable community that elevates Rochester as a market for investment, development, and workforce
recruitment and retention.
2035 Goal Phase 2 (2025) Goal 2020 Outcome Status
Reduce energy consumption by 25%
below 2012 levels by 2030
Benchmarking program
includes over 200
buildings. City Council
is reviewing an energy
disclosure
policy.
Benchmarking program includes 120
buildings
Reduce DMC-wide
emissions per SF by
22% below 2005
levels by 2025
Create key metrics collection schedule to
monitor progress towards DMC's
greenhouse gas, energy and
sustainability goals
Provide 12 sustainability series in 2020
and lead in management of Earthfest
celebration
Reduce:
• Energy consumption by 25%
below 2012 levels by 2030
• Potable water consumption
below 2012 levels by 2030
• Total waste generated by 30%
below 2012 levels by 2030
• Drive alone mode share to 50% or
less
• DMC-wide emissions per SF by 80%
below 2005 levels by 2050
Progress toward DMC
and Rochester GHG,
energy and
sustainability goals
across sectors
(commercial,
industrial, residential)
Engage in up to 3 national conferences
and 20 local and regional meetings to
learn sustainability and energy use best
practices
Reduce district-wide energy
consumption by 25% below 2010
levels by 2030
Reduce district-wide
energy consumption
by 20% below 2010
levels by 2025
Complete 9 projects identified in Phase
1 of Strategic Energy Project Plan and
evaluate— and if applicable, advance—
two district
energy possibilities in DMC District
196
STRATEGIC PRIORITY: BUSINESS DEVELOPMENT AND MARKETING
Execute business development and marketing activity to secure private investment, recruit and retain new
businesses and entrepreneurs, develop our workforce, and achieve the goals of the DMC Development Plan.
2035 Goal Phase 2 (2025) Goal 2020 Outcome Status
Achieve highest quality
patient, visitor, resident
experience
Discovery Square organizations and their
staff are integrated into the Rochester
community
Comprehensive communications plan is
used to on-board and assimilate new
Discovery Square-based businesses
Create 30,000 new
jobs, including 3,230
in bio-med-tech
Assistive Technology Challenge (ATC)
enables formation of 10 new ATC-related
businesses, creating 25 new jobs towards
the 5-year goal of creating 510 Mayo and
non-Mayo new jobs in bio-
med-tech
ATC2.0 completed in spring; ATC3.0
initiated in fall
Programming supports the formation
of 20 new startup companies and 100+
new jobs, towards the 5-year goal of
creating 510 Mayo and non- Mayo
new jobs in bio-med-tech
Partner with other organizations to
support entrepreneurial programming
200+ new jobs created by recruiting 20
new bio- med-tech businesses into
Discovery Square, towards the 5-year
goal of creating 510 Mayo and
non-Mayo new jobs in bio-med-tech
New businesses operate in Discovery
Square
$5.6 billion of private
investment
More than $1 billion of new private
development, consistent with
development plan, underway
Drive qualified traffic to dmc.mn and
generate qualified leads by executing
an integrated marketing campaign to
targeted regional, national and
international
audiences
Secure two national media placements
and a minimum of one national
speaking engagement and showcase
the DMC model to a minimum of two
regional audiences by executing a
comprehensive communications plan
Five new development proposals
introduced and approved
Retail developments
active across all DMC
subdistricts
Retail strategy implemented throughout
DMC district and downtown Rochester
Retail strategy completion and initial
implementation
Ensure compliance with specific requirements of the DMC Act WMBE, Targeted Business Utilization,
Prevailing Wage, American-made Steel
LEGISLATIVE REQUIREMENTS
2035 Goal Phase 2 (2025) Goal 2020 Outcome Status
Ensure compliance with specific requirements of the DMC Act Update Development Plan
197
198