Loading...
HomeMy WebLinkAbout2025 Year-End Action Plan Report 2025 Year-End Update 2025 Action Plan | Year-End Update Action Plan Overview The City of Rochester’s Action Plan, first implemented in 2021, serves as our roadmap for success. It outlines current initiatives aimed at advancing City Council's Strategic Priorities:  Economic Resilience  Housing Access  Inclusive Growth Management  Responsible Environmental Stewardship  Transformational Capital Projects Benefits of the Action Plan include:  Shared Vision  Communication & Collaboration  Accountability & Transparency Completed: 1 On Target: 79 Delayed: 3 Off Target: 0 Not Started: 11 Total: 93 2025 Action Plan | Year-End Update Action Plan Alignment Our Action Plan supports the City’s Strategic Priorities by translating them into specific, actionable steps. Each action item aligns with a priority, ensuring coordinated efforts across all departments. This alignment allows us to effectively track progress, measure success, and adapt to new challenges and opportunities, driving meaningful improvements in our community. 2025 Action Plan | Year-End Update Action Plan Highlights Updates:  Permitting Modernization: Accela moved to the Cloud + new roofing and siding permit implemented.  Regulatory Improvements: Administrative Fee Ordinance implemented + Film Permit license in development.  Chateau Theatre: Operating Analysis competed + City Council direction received; operational strategy and renovation estimates underway.  Equitable Procurement: Disparity Study actions incorporated into purchasing policy with improved tracking tools advancing. Updates:  Housing Stability: 15 rehabilitation loans completed + 378 housing units created or preserved.  Lead Service Line Replacement: First construction contract awarded + 20 lines replaced; next phase bidding May 2026.  Permitting Efficiency: 88% of residential permit reviews completed within two weeks.  Homeless Outreach: Outreach navigator connected 26 individuals to housing, treatment, and support services. Chateau Theatre Economic Resilience Housing Access Lead Service Line Replacement 2025 Action Plan | Year-End Update Updates:  Transportation Planning: Mode Shift Coordinator position filled.  Transit Optimization: Increased route frequency + redesigned routes + improved rider guide usability.  Infrastructure Investment: Secured $1M in federal funding for East Zumbro sewer improvements.  TIF Modernization: Comprehensive Tax Increment Financing (TIF) Management Plan underway + policy updates expected summer 2026. Updates:  Renewable Energy Progress: Wind power agreements executed (~2-3 energy supply) + 20MW battery storage authorized.  Advanced Metering: System launched Jan 2026 + pilot deployment underway.  Energy Efficiency: Exceeded MN ECO Act targeted with 17.4M kWh saved in 2025.  Electric Vehicle (EV) Infrastructure: Charging rate policy implemented + regional grant partnerships advancing. Inclusive Growth Management Public Transit Dashboard Responsible Environmental Stewardship EV Infrastructure 2025 Action Plan | Year-End Update Updates:  LINK Bus Rapid Transit: Construction ~27% complete + fleet delivery expected late 2026.  6th Street Bridge + Riverfront: Design nearing 90% + major permits advancing.  Downtown Geothermal Project: Wells installed + system startup completed with early energy reductions (48% City Hall | 69% Art Center | 63% Library | 10% Civic Center) + final work continuing into 2026.  North Broadway Phase 2: Construction ahead of schedule + completion anticipated June 2026. Other Highlights  Language Line + Pay Differential Program: Expanded language access services + language line now available across six departments and 311.  Organizational Services Integration: Fleet integration nearing completion + enterprise IT and Safety recommendations being finalized for leadership review.  Air Quality Monitoring: Public-facing sensor network established with citizen science component + standardized maintenance procedures implemented.  Urban Forestry Program: New arborist position added to accelerate pruning efforts + Boulevard Tree Master Plan grant secured.  RCTC Recreation Partnerships: Expanded community access with new morning pickleball + basketball programming options. Community engagement and enhanced Rochester Sports Center partnership to be considered Spring of 2026. Transformational Capital Projects 6th Street Bridge Rendering 2025 Action Plan | Year-End Update Full Action Plan The following pages include a comprehensive table of our full action plan. Items are organized by Strategic Priority, by goals, and then tactics. Want to learn more? Explore our website at www.rochestermn.gov/priorities for details on our Strategic Priorities, past Action Plan updates, DEI Action Plan, and Legislative Priorities. Action Plan (2025 Year-End Update) Items Lead Department Current: Status Current: Update Start Date End Date 1 Economic Resilience 2 Develop a cohesive city economic development strategy and staffing model that complements key economic development partners 3 Role & Staffing: Clarify the City’s economic development role and explore staffing that supports the City’s role. Review how we can enhance collaboration with Rochester's existing economic development ecosystem, including Destination Medical Center, Rochester Area Economic Development Inc., Small Business Development Center, Collider, the emerging biolab, Mayo Clinic Accelerator, Discovery Square, and others. Admin On Target We began meeting with community partners in August 2025 to map Rochester’s economic development ecosystem. This work will document existing programs, identify gaps, and define shared goals between the City and community partners. 11/03/25 Ongoing 4 Regulatory Commitment: Evaluate existing and future regulations and licensing to reflect community needs, support the City’s strategic priorities, and encourage investment in Rochester. City Clerk On Target In 2025, we implemented a new Administrative Fee Ordinance that brings all license types under the Administrative Citation process and establishes a framework for regulation through hearing officers. The process governs fines for licensing violations and creates a more proactive regulatory approach that aligns with City standards while minimizing disruption to license holders' operations. We also began developing a new Film Permit license class to support Rochester's goal of becoming a film- ready community and promote tourism through film production. 10/01/25 Ongoing 5 Business Retention and Expansion: Develop a proactive business retention strategy focused on small, minority and locally-owned businesses. Admin On Target Beginning February 1, 2026, we will advance this work through the City’s Economic Mobility efforts. In Q1 & Q2 2026, we will collaborate to establish a formal business retention framework and implementation strategy focused on outreach, data tracking, and support tools for small, minority-, and locally owned businesses. 06/01/26 Ongoing 6 Equitable Economic Development: Implement recommendations from the Disparity Study with a focus on actions that will increase small, minority and locally-owned business participation that is more reflective of contractor availability. Continue to evaluate city procurement goals and policies to address contracting disparity. Admin On Target We prioritized actions that can be implemented immediately and incorporated them into the purchasing policy in collaboration with the Finance Department. We are also transitioning to new software that will improve tracking of Targeted Business Utilization and make it easier for contractors to access certified Disadvantaged Business Enterprises. Ongoing Ongoing 7 Implement a tourism strategy that enhances evening and weekend economic activity 8 Events: Support free and inclusive cultural experiences that bring people together, strengthen Rochester’s evening and weekend economy, and foster community vitality. Continuously refine event offerings to ensure strong public engagement and activation of community spaces. Public Music On Target We expanded and refined our event offerings to increase public engagement, focusing on free and inclusive programs that activate parks and downtown spaces. Attendance, community participation, and partner interest continue to grow as we strengthen Rochester’s evening and weekend economy. Ongoing Ongoing 9 Trails: Develop a strategy to plan, prioritize, fund, construct and maintain local and regional trail connections. Parks & Rec Delayed We planned to evaluate trail conditions to help prioritize funding and integrate the results into the annual work plan; however, the Public Works assessment has been delayed. Routine trail maintenance has continued as scheduled. 04/01/26 12/01/26 10 Park Development and Investment: Complete an update to the Parks Master Plan that prioritizes park features and amenities that enhance positive user experiences for community members and visitors. Review parkland dedication to ensure sustainable park and trail investment and other financing options that allow investment in parks to support implementation of the plan. Review existing partnerships and policies with different associations to ensure community access, sliding fee schedules, and a balanced financial partnership. Evaluate programmatic gaps and solutions for meeting those gaps in new or existing facilities. Parks & Rec On Target The Parks and Recreation System Plan update was reviewed as part of the 2026–2027 budget planning process. Over the next three quarters, we will develop the project scope of work, with a request for proposals anticipated in early 2027 and plan updates occurring throughout 2027. 06/01/26 12/31/27 Page 1 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 11 Regional Sports and Recreation Assets: Develop final cost estimates and financing options for Phase Two of the Regional Sports and Recreation Complex. Evaluate utilization and renovation needs of existing assets such as the Rec Center, Sports Center located at RCTC, National Volleyball Center, and others to maximize community and visitor use concurrent with progress on the new complex. Parks & Rec On Target We have seen increased attendance in Parks & Recreation drop-in programming following focused marketing and awareness efforts. We continue to meet with RCTC to update agreements and expand community access, and RCTC is now offering morning drop-in pickleball and basketball for the community. 12/08/25 Ongoing 12 Marketing: Consider expanding destination marketing efforts through our Destination Marketing Organization. Evaluate the best approach to market sports centric tourism and passive recreation-based tourism, emphasizing Rochester's historic district. Admin Not Started Internal coordination is underway to develop a clear plan and timeline for advancing this work. Discussions are focused on defining next steps, roles, and milestones to support effective implementation. Ongoing Ongoing 13 Chateau: Develop final strategy for needed renovations, programmatic evolution, and preferred approach to operations needed to support this goal. Admin On Target We completed an operating analysis in 2025, with recommendations for capital investments and operator partnerships presented at the February 12, 2026 Study Session. City Council provided direction on next steps. We are now working with the current operator and Experience Rochester to refine a programmatic and operational proposal while securing construction cost estimates for targeted building renovations. 14 Optimize City services and assets to support Economic Resilience 15 Bio Business Center: Evaluate the long-term future of the Bio Business Center for economic resilience or potential adaptive reuse. Admin On Target In Q1 2026, we are releasing an RFQ for leasing services and reviewing upcoming lease renewals. At the same time, we will evaluate market conditions and analyze options to inform recommendations on long-term use, economic resilience, and potential adaptive reuse strategies. 02/01/26 09/01/26 16 Economic Vitality Investments: Ensure that the Economic Vitality Fund investments targeted toward economic development support the Economic Resilience strategic priority. Focus partner investment efforts on economic diversification. Community Development On Target We began meeting with community partners in August 2025 to map Rochester’s economic development ecosystem. Once completed, this work will support partners in identifying shared goals to inform a cohesive economic development strategy, including future funding recommendations. 08/06/25 05/01/26 17 Housing Access 18 Promote construction of owner occupied homes 19 Regulatory Environment: Continue to evaluate regulatory alignment around single family home construction to mitigate cost while still ensuring neighborhood quality. Initial areas of evaluation include boulevard trees, connection charges, and other items learned as part of the affordable single family home initiative in Northwest Rochester. Community Development On Target Permit review timelines remain strong: a. 88% of residential permit reviews were completed in two weeks or less b. 89% of commercial permit reviews were completed in three weeks or less 09/18/25 Ongoing 20 Home Ownership Innovation: Explore condos and small-scale ownership models as alternatives to traditional single-family homes. Support efforts to construct multigenerational housing within newly constructed single family homes. Community Development Not Started Housing outcomes for this period include: a. 0 condominium units constructed by the private sector b. 0 multigenerational housing units financially supported c. 58 for-sale townhome units constructed by the private sector 03/01/26 03/01/27 21 Legislative Environment: Pursue state legislative solutions that align state and local priorities for housing with state investment in local infrastructure. Engage legislatively to reduce tax disincentives to platting lots. Legislative On Target We partnered with the League of Minnesota Cities housing task force and policy committees to advance housing priorities within the 2026 legislative platform and continue coordinating with partners on strategic legislative pathways. 06/02/25 05/18/26 22 Ensure vital neighborhoods that support infill, adaptive reuse, and accessible housing 23 Accessory Dwelling Units: Reevaluate ADU program requirements and barriers (e.g., connection fees, owner occupancy). Community Development On Target We continued evaluating Accessory Dwelling Unit requirements and potential barriers. Current metrics include: a.0 new ADU units constructed by priivate sector b. 0 ADUs financially supported 01/01/26 01/01/27 Page 2 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 24 Short Term Rentals: Evaluate existing short term rental requirements including geographic dispersion, tax classification, lodging tax contribution, and other areas while balancing economic and neighborhood impacts. Community Development On Target We are preparing updates to mapping tools to better illustrate geographic dispersion, ownership patterns, and property values for single-family rentals and short-term rentals. The updated mapping application has not yet launched. Current metrics include: a. 557 short-term rental units b. Short-term rentals represent 2% of total rental units c. Single-family rentals represent 14% of total rental units d. 55% of single-family rental units are owned by a company e. 6% of single-family rental units are owned by a non-local company 06/01/26 12/31/26 25 TIF Policy & Accessible Housing: Align Tax Increment Financing (TIF) policy and related incentives to encourage the development of accessible housing. Create a framework for reliably classifying and tracking accessible units. Admin On Target City Council approved an agreement with Ehlers to develop a comprehensive Tax Increment Financing (TIF) Management Plan. The plan will evaluate each active district’s key dates, obligations, cash flow and amortization, administrative and pooling impacts, effects on the general tax base, compliance requirements, and opportunities to optimize TIF use. Updates and policy recommendations are anticipated in summer 2026. Internal coordination and external discussions have begun to establish a framework for classifying and tracking accessible housing units. Development of a formal inventory, including review of units identified through the Electronic Plan Review system, is expected to begin in 2026. 09/01/26 Ongoing 26 Rental Inspections and Code Enforcement: Evaluate the potential for proactive code enforcement, integrated code enforcement, efficiency in rental inspections, tall grass and weeds policy, and other innovations. Community Development On Target We have not yet launched the pilot neighborhood courtesy inspection sweep. Rental licenses are currently distributed across inspection cycles: a. 1-Year Cycle: 341 licenses (14.60%) b. 2-Year Cycle: 927 licenses (39.70%) c. 3-Year Cycle: 373 licenses (15.97%) d. 4-Year Cycle: 694 licenses (29.72%) 06/01/26 Ongoing 27 Lead Service Line Replacement: Continue implementation of the Lead Service Line Replacement Program to help homeowners replace lead service lines and reduce potential lead exposure in drinking water. RPU On Target In 2025, we began the first phase of the multi-year replacement program, awarding the first construction contract in September 2025. To date, 20 service lines have been replaced, with work under this contract anticipated to be completed in June 2026. We are preparing plans and construction documents for a second replacement project anticipated to bid in May 2026. Currently, about 1.2% of water services are identified as lead or galvanized and require replacement, while 5.9% remain classified as "Unknown" and are actively being investigated. 01/06/25 11/10/28 28 Wastewater Lateral Replacement: Explore programs similar to service assured that take into account the complexities of sewer system liability. Public Works On Target We conducted research on programs used in other cities and evaluated options available to the City. A report summarizing findings and recommendations is currently being drafted. 09/01/25 12/31/26 29 Housing Financing: Better understand micro- and macro-level financing challenges as it related to the purchase, renovation, and construction of housing. Identify relevant solutions that can be implemented locally. Community Development Not Started Work on this initiative has not yet begun. Staff plan to establish key market data metrics, including interest rates, average home prices, renovation costs, construction costs, and lending trends. Stakeholder engagement with local banks, credit unions, housing developers, and nonprofit partners will be initiated to identify barriers and opportunities. Trend-tracking metrics will also be developed to compare local construction costs and housing market conditions with regional, state, and national trends. 05/01/26 01/31/27 30 Support County and non-profit efforts to effectively provide resources to persons experiencing housing instability 31 Facilities: Support County and non-profit service provider efforts to align services and thoughtfully locate facilities. Community Development On Target We have not yet initiated a formal review of new facilities locations.09/18/25 Ongoing 32 Public Safety: Focus on the City’s role as a public safety provider to create a safe and welcoming community for all to support Housing Access, Economic Resilience, and Inclusive Growth Management. Police On Target In March 2025, we added a homeless outreach navigator focused on assisting individuals experiencing homelessness who have frequent interactions with police. To date, the navigator has helped 26 individuals transition into substance use treatment, housing, court-ordered treatment, and/or mental health services. Ongoing Ongoing 33 Support Individual Housing Stability Efforts: Provide options to mitigate housing instability through utility programs, housing rehab, engagement in Any Path Home, Housing Coalition, HRA, and related efforts. Community Development On Target We advanced coordination through Any Path Home by helping establish formal Case Conferencing, a multi-organization review of a By Name List, and a shared guidebook for consistent intake practices. In 2025, we completed 15 single-family rehabilitation loans and supported the creation or preservation of 378 housing units through Housing Coalition funding. 09/18/25 Ongoing Page 3 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 34 Optimize City services and assets to support Housing Access 35 City Parcels: Evaluate city parcels for disposition that supports economic resilience and housing access. Key parcels include the Regional Sports and Recreation Center (north outlot for residential, South outlots for commercial), various Riverfront properties, Badger Farms, Silver Lake Power Plant, and the Traffic Operations Building. Admin On Target In 2025, two near-term parcels were disposed of through right-of-way vacation. Excess land at Fire Station #2 advanced through an RFP process for broker services and is now moving forward with marketing and sale. We continue planning and evaluation for other priority parcels, including the Regional Sports and Recreation Center outlots and Riverfront properties. 03/01/27 05/01/28 36 Permitting: Focus on continuous improvement to streamline enterprise-wide permitting, inspections, licensing, development review, housing construction, and business navigation. Community Development On Target In 2025, we migrated the Accela permitting and licensing platform from on-premises servers to Accela’s cloud environment to ensure continued compatibility with future system updates. We also introduced new permit types for residential window, roof, and siding replacements, with a streamlined application and inspection process that includes same-day approvals for roofing and siding and options for virtual inspections. Prior to implementation, we hosted Business Forward seminars to gather input and help onboard businesses new to the permitting process. 10/20/25 Ongoing 37 Economic Vitality Investments: Ensure that the Economic Vitality Fund investments focused on housing support the Housing Access strategic priority. Community Development On Target We supported 286 housing units through Economic Vitality Fund investments.09/18/25 Ongoing 38 Inclusive Growth Management 39 Integrate active transportation, transportation, and transit efforts to support Inclusive Growth Management 40 Staffing: Work to build transportation planning capacity and coordination within the Development Services and Infrastructure Team. Utilize 311 and the community survey to better understand resident transportation needs and perceptions. Community Development On Target The Mode Shift Coordinator position has been filled and relocated to the Community Development Department. 11/01/25 Ongoing 41 Mode Shift and Travel Demand Management: Focus on coordination with Mayo Clinic to ensure that the goals of LINK Rapid Transit are realized. Develop a travel demand management framework in partnership with Mayo Clinic that can be extended to other employers. Community Development On Target We identified data indicators by reviewing existing transportation tools and secured outside funding to install two additional pedestrian and bicycle counters. We are also pursuing a State grant to support development of a Travel Demand Management framework in partnership with Mayo Clinic. 01/01/26 09/30/26 42 Transit Optimization: Evaluate and prioritize our existing transit services in the context of significant post-pandemic ridership decline, declining external funding, ability to influence Greenhouse Gas (GHG) emissions, and promote inclusive growth management. Ensure that this optimization is reflected in future Transit Development Plan updates and the forthcoming request for proposals for transit operations. Transit & Parking On Target Spring service changes reflect a high level of external collaboration and include increased route frequency, conversion from loop to two-way service, and route realignments. Budget analysis is ongoing to reduce capital project costs while maintaining efficient service delivery. The rider transit guide is being updated to improve usability, with a shift to a condensed booklet format that can be easily adapted for online use to enhance the overall rider experience. Ongoing Ongoing 43 ADA Transition Plan: Update the 2013 ADA Transition Plan to align with this strategic priority. Public Works On Target Work to update the Transition Plan is ongoing. We are currently updating data sets to provide an accurate status snapshot and are developing communication and engagement tools to support implementation. In addition, we will be reviewing all parking lots within the park system for compliance with striping standards and signage requirements. 09/01/25 07/15/26 44 Ensure strategic investments are integrated with inclusive land use planning to support development that is land, tax, and service efficient Page 4 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 45 Infrastructure: Annually review and align electric, water, sewer, storm sewer, and transportation infrastructure to ensure that investments are maximized and construction impact is minimized. Prioritize investments in the East and West Zumbro Sewer Areas. Advocate for the state bonding request for the East Zumbro Sewer Area. Public Works On Target East Zumbro: Coordination across City teams secured $1,000,000 in federal funding to support sewer and water improvements in the East Zumbro Sewershed. State bonding assistance remains a top legislative priority for 2026. West Zumbro: Phases 1 and 2 are complete, Phase 3 is under construction, and Phase 4 is in design and permitting with construction anticipated in 2026–2027. Infrastructure Coordination: Engineering teams continue meeting regularly to prioritize capital improvement projects and coordinate schedules across City infrastructure work. 09/01/25 07/01/27 46 Growth Areas: Regularly review and assess growth areas to inform land use and infrastructure investments. Community Development On Target We completed updates to the Comprehensive Plan and Growth Management Map in 2025. 09/01/25 12/31/26 47 Annexation: Develop annexation priorities that align with existing market need and approved plans. Evolve existing or develop new orderly annexation agreements with surrounding townships. Community Development On Target We mapped existing Orderly Annexation Agreements and confirmed five active township agreements. 12/01/25 02/01/27 48 Financial: Discuss and evaluate tools to help the community understand the fiscal and service impacts of development. Community Development On Target Improved Action Plan Update: We engaged Urban3 to complete a Fiscal Impacts Analysis to better understand how development patterns influence infrastructure costs. The analysis will build on the Revenue Analysis that began in fall 2025. 10/01/25 12/01/26 49 Services: Develop a plan to finance, construct, and operate Fire Station 6, provide final direction on the implementation of the Library’s Master Plan, and address deferred maintenance on existing police training facilities with a focus on shared training spaces. Fire On Target The Library Master Plan was approved by the Library Board in August 2025 and adopted by City Council in November 2025. Site analysis has been completed at the Badger Site for a potential Fire Station 6 location, with the Rochester Fire Department reviewing operational metrics and plans underway to market excess land to developers in 2026. Police training updates are also progressing, with City Council scheduled to consider a purchase agreement for the Heartland Gun Club on March 2, 2026. If approved, closing is anticipated in July 2026, and the facility would replace the current outdoor range while supporting expanded partnerships for regional law enforcement training. 07/01/25 Ongoing 50 Maintenance: Consider ongoing and one-time investments to support the maintenance of existing infrastructure particularly for City facilities, public spaces, and streets. Admin On Target The 2026 budget process included additional funding for facility replacement through the Capital Improvement Program and the allocation of excess lodging tax revenues beyond the City’s commitment to operate the Mayo Civic Center. Ongoing Ongoing 51 Support Infill and Transit Oriented Development 52 Incentives and Policies: In addition to aligning the TIF policy, create additional financial and non-financial incentives to help prioritize infill and transit oriented development. Evaluate other policies that prioritize development in areas with existing infrastructure (e.g. parking minimums). Community Development Not Started We eliminated downtown parking minimum requirements to encourage infill development and support transit-oriented growth. 04/01/26 12/31/26 53 Maximize Link Investment: Prioritize development in and around LINK stations including the West Transit Village and East Terminus. Ensure that existing and future development are effectively connected to the stations. Review the potential for an updated traffic study two years after the project is implemented to assess any future improvements needed. Community Development Not Started The Link Bus Rapid Transit route is not yet constructed, so this work has not started. Once implemented, we will track development near station areas such as the West Transit Village and East Terminus and evaluate the need for a follow-up traffic study. 01/01/26 12/31/26 54 Optimize City services to support Inclusive Growth Management 55 One Water, One Team: Consider further integration of water reclamation, sewer collection, water treatment, water distribution, flood control, and stormwater services into one team. Admin Not Started This project has not yet started.01/01/27 Ongoing 56 Integrated Utility Planning: Ensure ongoing planning and collaboration to ensure that power supply planning, sewer, wastewater, and water supply planning maximizes investments and ensures efficient future growth. Public Works On Target We are coordinating across departments to align utility planning efforts, including collaboration with RPU’s Water Plan and Community Development’s Growth Management Map amendments. Current work includes planning for a coordinated sewer and water extension along Country Club Road SW to support future development and improve system capacity. 09/01/25 12/31/26 Page 5 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 57 Organizational Services: Align and integrate organizational services such as Finance, Information Technology, Communications, Facilities, Safety, GIS, Fleet, and similar functions across the enterprise. The focus will be on enhancing services provided to the public; making the best use of public dollars; reducing duplicative or low-impact work; increasing clarity and consistency across departments; and allowing departments to focus more on strategy and people. Admin On Target Fleet integration is nearing completion. At the Forward Team’s request, City IT and RPU IT are developing a recommendation for integrating IT, which is being finalized for leadership review. Additional evaluations are underway related to safety and One Water. The Forward Team is also preparing a recommendation to City Council to update the City’s financial policies, including potential integration of organizational services. Ongoing Ongoing 58 Toolkit Optimization: Move toward full use and integration of the change management, project management, and communications & engagement tool kits within the organization. Admin Not Started We are conducting preliminary discussions to optimize the organization’s toolkit. A survey will be distributed to gather input and identify opportunities to expand toolkit use, including virtual and in-person trainings. 01/01/26 12/31/26 59 Responsible Environmental Stewardship 60 Reduce greenhouse gas emissions associated with transportation 61 Active Transportation: Encourage the use of active transportation options for both commuting and recreational trips. Create support facilities to help meet the needs of active commuters. Continue to refine the framework for the responsible use of private scooters and Lime Scooters including designated corrals in the Downtown area. Evaluate a variety of financial strategies to invest in trails including reviewing our park dedication ordinance to allow investments in both park and trail development. Community Development On Target Park dedication review is anticipated in 2027 concurrent with the Park System Plan update, with information gathering underway in 2026 to support future trail investment discussions. We are also transitioning Lime scooter coordination to the new Mode Shift Coordinator and have begun working with Lime to establish a parking pin audit and designated downtown corral plan. 12/01/25 Ongoing 62 City Fleet Electrification: Identify resources and implementation strategies to electrify the City’s fleet while ensuring the financial viability of the Equipment Revolving Fund. Public Works On Target We are advancing plans to electrify the City’s fleet while protecting the long-term health of the Equipment Revolving Fund. Near-term work includes developing a Citywide EV Charging Rates Policy and completing an internal plan to guide how chargers are installed, used, and expanded. About $40,000 in federal funding remains, and we are evaluating options that meet grant requirements and operational needs. To support long-term sustainability, we added a fleet management percentage fee and continue coordinating across departments to advance responsible fleet electrification. 09/01/25 12/31/26 63 Community Transportation Electrification: Work to encourage private electric vehicle charging infrastructure solution to make charging convenient. Monitor the implementation and adjust as public and private vehicle electrification infrastructure evolves. Public Works On Target We applied for electric vehicle charging grants in partnership with Olmsted County and Rochester Community and Technical College to expand charging infrastructure. In 2025, we conducted research on charging rates, usage, and availability and drafted an electric vehicle charging rate policy, which was approved by City Council and implemented in January 2026. 09/01/25 12/31/26 64 Reduce greenhouse gas emissions associated with building energy consumption 65 Power Supply Resource Plan: Monitor and support the implementation of the RPU 100% Net Renewable Energy by 2030 resource plan goal. Determine acceptable risk mitigation measures that might be necessary with the changing tax credit environment; evolving financial viability; and ability to build or contract enough locally produced renewable energy to meet the community’s needs. RPU On Target We made significant progress toward the 2030 renewable energy target by executing power purchase agreements with three wind projects that will provide approximately two-thirds of our energy needs and allow us to bank Renewable Energy Certificates (RECs). We also secured about two-thirds of our capacity needs, including City Council authorization for 20 megawatts (MW) of battery storage. We continue monitoring risks related to tax credits, project viability, and contract performance while pursuing additional renewable energy opportunities beyond 2030. 07/29/24 12/31/30 Page 6 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 66 Energy Savings: Continue to explore energy efficiency and decarbonization projects that have a reasonable return on time and capital. Facilities On Target Phase 2 of the Downtown Building Energy Transition project came online in December 2025, connecting the Mayo Civic Center, Rochester Public Library, Rochester Civic Theatre, and Rochester Art Center to an electrified geothermal thermal energy network. These facilities are now aligned with Rochester Public Utilities’ renewable and carbon-neutral goals, with natural gas systems retained only as backup. Early results show significant reductions in energy use intensity across key facilities, including a 48% reduction at City Hall, 69% at the Rochester Art Center, 63% at the Rochester Public Library, and 10% at the Mayo Civic Center (through April 1, 2025). The new Maintenance Center will be fully electrified using Darcy Geothermal systems, and Fire Station 3 is currently out to bid, with plans to fully electrify the HVAC system if approved. Ongoing Ongoing 67 Advanced Metering: Successfully complete the implementation of advanced metering. Facilitate training and education on how customers can best use the information to manage their energy footprint. RPU On Target This project remains on track for budget and schedule. Configuration, integration, and testing were completed in 2025, and the system successfully went live on January 10, 2026. The next phase includes a three-month pilot deployment of 500 electric meters and 50 water meters in Northwest Rochester to evaluate technical performance, operations, customer experience, security, and communication network coverage. If successful, mass deployment is anticipated to begin in May 2026, with electric meter replacement occurring over approximately two years and water meter replacement over three years. N/A 06/01/29 68 Commercial Benchmarking: Continue to refine the data collection and dissemination for commercial buildings over 50,000 square feet. RPU On Target Buildings over 100,000 square feet were required to submit energy benchmarking data through the ENERGY STAR Portfolio Manager platform by June 1, 2025, supported by implementation of the MyMeter benchmarking tool. Extensive outreach included virtual presentations, targeted communications, onsite visits, and one-on- one support to help customers connect accounts and submit data. Of the 137 required buildings, 86 complied, with 57 remaining outstanding. In 2026, the State requirement expands to buildings over 50,000 square feet, adding an estimated 126 additional properties. 01/02/26 07/01/26 69 Commercial and Residential Energy Efficiency and Beneficial Electrification: Maximize programming and direct investments through RPU’s Energy Advisors in alignment with the MN Eco Act, Sustainability Division, and City partners to support carbon free options including geothermal, heat pumps, and energy efficient appliances. RPU On Target We achieved the 1.5% energy savings target required by the MN ECO Act in 2025, reaching 17,432,734 kWh in savings compared to a goal of 17,219,195 kWh. These results were driven by strong participation in Conserve & Save rebate programs led by RPU Energy Advisors, including incentives for heat pumps, geothermal systems, and energy-efficient appliances. 01/02/26 12/31/26 70 City Facilities: Integrate B3 and Energy Star standards during new construction or material renovation of City facilities to the maximum extent possible. Ensure that projects are designed in conjunction with the facilities team to ensure that building automation, energy efficiency, and other standards are reflected. Facilities On Target The Maintenance Center continues to follow the Sustainable Buildings program, and Fire Station 3 is being designed with electrified systems and high-performance equipment. We are also refining standard specifications to strengthen energy efficiency requirements. Ongoing Ongoing 71 Enhance and Effectively Maintain Rochester’s Natural Resources 72 Urban Forest: Implement options to maintain our urban tree canopy through accelerated pruning, empowering property owners to maintain trees, rethinking boulevard trees, and substantial tree planting initiatives. Parks & Rec On Target In 2025, we offered educational opportunities to help homeowners adopt proper tree care practices. In 2026, a new arborist will join the team to accelerate pruning efforts, and a grant-funded Boulevard Tree Master Plan will be developed to guide long-term boulevard tree management. Ongoing Ongoing 73 Air Quality: Ensure real-time air quality data continues to be publicly available, monitored, and is actionable. Public Works Complete We drafted a memorandum of agreement with Air Quality Action members and developed a citizen science component. We also created standard operating procedures to maintain air quality sensors and the public website, ensuring equipment is calibrated, deployed, and data is shared with the community. 09/01/25 12/31/26 74 Water Quality: Finalize the Comprehensive Surface Water Master plan and prioritization of its recommendations. Public Works Delayed This project has been postponed to prioritize higher-priority work aligned with City Council goals, including development reviews, Bold Forward Unbound coordination, and Capital Improvement Program projects. 12/31/25 Page 7 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 75 Drinking Water Supply & Water Quality: Finalize the RPU Groundwater Management Study and RPU Water System Master Plan. As we continue to better understand the regulatory landscape and our municipal water supply, explore the need and costs for additional water appropriation and treatment. RPU On Target We began the Water System Master Planning study in July 2025 to evaluate long- term drinking water supply options following State limits on additional groundwater pumping from the Jordan Aquifer. Current work includes development of a regional groundwater model to assess future demand through 2065 and evaluation of potential surface water alternatives, including the Mississippi River and the South Fork and Middle Fork of the Zumbro River. Initial findings are anticipated in July 2026, with final study completion expected in the first quarter of 2027. 07/22/25 04/05/27 76 Optimize City services and assets to support Environmental Stewardship 77 Natural Gas Franchise Fee: Explore the implementation of a natural gas franchise fee to fund the adopted strategic priorities and foundational principles. Public Works On Target We are conducting public engagement from December 2025 through April 2026, with results and recommendations scheduled for presentation to City Council in May 2026. 09/01/25 12/31/27 78 Waste Management: Monitor Olmsted County’s development and construction of a material recovery facility (MERF). As county level waste and material management becomes clearer, discuss options to evolve organizational recycling, residential collection, organics, yard waste, and woody waste. Study peer- implemented best practices for single use plastic bags. Public Works On Target We met with Olmsted County to review the project scope and timeline. Design was completed in September 2025, with the construction contract awarded in October 2025. The project is currently in the equipment procurement phase, with construction scheduled to begin in April 2026. 09/01/25 06/01/27 79 Data Driven Decision Making: Launch a public-facing dashboard tracking emissions, waste, water, and city fleet. Public Works On Target This work is partially complete. A dashboard for building greenhouse gas emissions has been developed, while progress on other focus areas is currently paused to ensure compliance with State accessibility requirements before public release. All data remains available internally as accessibility updates are completed. 09/01/25 06/30/26 80 Transformational Capital Projects 81 Focus on Excellence in the Delivery of Transformational Capital Projects 82 Timely and Effective Projects: Ensure that the following projects are delivered on time and on budget, with risks and challenges effectively managed and outcomes the community can be proud of. 83 18th Avenue SW Reconstruction: Reconstruct the road from Mayowood Road SW to 40th St SW to address deteriorating pavement and calm traffic. Public Works On Target The first bid package for winter tree removal has been approved. The full project is anticipated to be bid in March/April, with construction planned for 2026/2027. 05/01/24 11/30/27 84 4th Street Roundabout: Construct a roundabout in place of the current intersection to increase safety for all roadway users, act as a traffic calming device, and improve current traffic flow conditions at the intersection Public Works On Target Construction experienced a winter delay but remains on track for completion in spring 2026, with an estimated completion date of June 30, 2026. 07/13/22 06/17/26 85 6th Street Bridge, Roadway Safety, and Riverfront Improvements: Construct a bridge over the Zumbro River that connects East and West 6th Street South to improve access to neighborhoods, riverfront, and key destinations and redevelop the existing flood control system into an accessible riverfront space. DMC & BFUiR On Target Design plans are nearing 90% completion. Right-of-way acquisition, environmental review, and permit applications remain on schedule, with CLOMR, FEMA, and U.S. Army Corps of Engineers permitting anticipated for submission in February 2026. The draft RAISE Grant agreement has been submitted to the Minnesota Department of Transportation for review and is expected to be executed later in 2026 following completion of required permitting. 08/21/23 03/10/28 86 Airport Runway Expansion: Reconstruct and upgrade Runway 2/20 and associated airfield infrastructure at Rochester International Airport to ensure safe, reliable, 24/7 operations for air ambulance providers, cargo carriers transporting medical supplies, and patient travelers. This multi-year project will replace aging infrastructure, enhance safety and efficiency, and maintain uninterrupted air access critical to the region’s healthcare and economic needs. Admin On Target The project began in May 2021 and is anticipated to be completed in late 2027 or early 2028. While the schedule is slightly behind initial projections, the project remains on track for completion by early 2028. The runway designation has been updated from 02/20 to 03/21 to reflect changes in magnetic declination since the project began. 05/01/21 03/31/28 Page 8 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 87 Downtown Building Energy Transition: Transition from Olmsted County Waste to Energy Steam to a sustainable, renewable geothermal central plant system and thermal energy network to serve the heating and cooling needs of 5 downtown public Facilities (City Hall, Rochester Public Library, Mayo Civic Center, Rochester Civic Theatre and Rochester Art Center) as well as support for future private connection to the thermal energy network Facilities On Target Project is nearing completion. System startup took place in December 2025, with sitework completion expected in early 2026. Submission for federal Inflation Reduction Act reimbursement is anticipated in 2026. The identified facilities are now operating fully on the geothermal heating and cooling systems 01/01/22 03/01/26 88 Downtown Waterfront Project: Redevelop underused riverfront land into a vibrant mixed-use district, positioning the riverfront-adjacent area as a vibrant, connected, and accessible space with interim site activations and improved public access to natural and cultural amenities. DMC & BFUiR On Target We are advancing short-term improvements with the Destination Medical Center team to increase everyday use of the downtown riverfront trail and shift public perceptions of the space. Seasonal programming is planned for the West Site, consistent with the 2024 design studies, and a Minnesota Pollution Control Agency grant will support trailhead improvements to enhance access and activation. A request for qualifications has been drafted and will be released when market conditions are appropriate to seek a development partner and advance the Small Area Plan concepts toward implementation. Ongoing Ongoing 89 East and West Zumbro Trunk Sewer Projects: Increase sanitary sewer capacity and extend trunk mains into newly developable areas, enabling future growth and supporting the City's industrial, commercial, and housing development objectives. Public Works On Target East Zumbro: Coordination across City teams secured $1,000,000 in federal funding to support sewer and water improvements in the East Zumbro Sewershed. State bonding assistance remains a top legislative priority for 2026. West Zumbro: Phases 1 and 2 are complete, Phase 3 is under construction, and Phase 4 is in design and permitting with construction anticipated in 2026–2027. 07/12/23 01/01/30 90 Economic Vitality Sales Tax Investments: Support investments that address the shortage of middle- and low-income housing, preserve existing affordable options in neighborhoods, and develop workforce programs that create more job opportunities for residents. Community Development On Target We continued supporting housing and preservation efforts through Economic Vitality Sales Tax investments. Current metrics include: a. 269 new for-sale units supported through Economic Vitality funding b. 0 Community Land Trust homes supported through Economic Vitality funding c. 356 rental units supported through Coalition/Economic Vitality funding d. 5 historic properties supported through Economic Vitality funding 09/18/25 12/31/26 91 Enterprise Resource Planning (ERP) Software Conversion: Implement a new ERP system to modernize business processes, including tracking and issuing payments, human capital management, payroll, project accounting, work orders, capital assets, etc. Information Technology On Target All associated contracts have been negotiated and executed, and supplemental staffing plans are in place. Project planning and technical groundwork are underway. The Steering Committee and Technical Team held kickoff meetings on February 9, 2026, with the Main Core Team kickoff scheduled for April 9, 2026. 01/01/26 12/31/27 92 LINK Bus Rapid Transit: Implement a 2.8-mile transit option along 2nd Street that will connect downtown Rochester, Mayo Civic Center, Mayo Clinic campuses, and the Downtown Waterfront Southeast area, enhancing mobility, easing congestion, and supporting the continued growth of Rochester. DMC & BFUiR On Target Link construction projects are collectively at 27% complete. In 2025, significant work occurred near St. Marys, at 6th Street SE and 3rd Avenue SE, and at the West Transit Village, with construction now underway on vertical circulators and the pedestrian tunnel at St. Marys. Major construction in 2026 will focus on areas adjacent to St. Marys, at 6th Avenue SW and 2nd Street SW, 2nd Avenue SW and 2nd Street SW, and the West Transit Village. The new Link bus fleet is expected to be delivered in the second half of 2026. 12/31/26 93 Maintenance Center: Establish a new Maintenance Center for Parks & Forestry that will strengthen collaboration between Parks & Forestry and Public Works teams. Facilities On Target Construction is underway, project is nearing the 50% completion milestone. Interior rough in is complete and inspections are currently being completed. Project is on schedule for completion in September 2026 01/01/24 01/31/27 94 Martin Luther King Park Renovations: Enhance park facilities, including restrooms, a splash pad water playground, basketball courts, playground, picnic shelters, and community gardens. Parks & Rec On Target Final design is underway following delays in the grant process. Construction is anticipated to begin in spring or early summer 2026 and continue through the year, with the splash pad planned to open in June 2027. 10/01/25 06/01/27 95 North Broadway Park and Ride: Construct a new park-and-ride facility to reduce congestion, lower emissions, and support better land use. Transit & Parking On Target Bids for the project were opened on Wednesday, February 4, 2026. We are awaiting final documentation from our two funding sources, which must be completed before we can award the contract. Construction is still planned to begin in spring 2026. 03/01/26 12/31/26 96 North Broadway Phase 2: Reconstruct Broadway Ave N from Silver Lake Bridge to Elton Hills Drive NW to improve traffic operations and safety, upgrade transit facilities, increase accessibility, and improve access to recreational opportunities along the river. Public Works On Target The project is ahead of schedule, with construction anticipated to be completed in June 2026. 07/20/22 07/01/26 Page 9 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 97 Public improvements associated with Mayo Bold Forward Unbound: As Mayo Clinic plans and initiates its transformative private Bold Forward Unbound, coordinate with DMC on public infrastructure improvements to ensure maximum public benefit with minimum public disruption. DMC & BFUiR On Target In 2025, we established strong coordination with Mayo Clinic’s Bold Forward Unbound project team to align public infrastructure work and minimize construction impacts. Ongoing collaboration includes regular design, logistics, traffic, and construction coordination to support safe and efficient project delivery, which will continue into 2026. Temporary pedestrian wayfinding improvements have been implemented downtown, with additional installations planned. We are also advancing approximately $38 million in Destination Medical Center–funded infrastructure by defining individual projects, assigning project managers, and sequencing work to align with ongoing Bold Forward Unbound construction. 07/01/25 03/01/30 98 Regional Sports and Recreation Complex: Develop a regional sports destination that remains accessible to the entire Rochester community. Parks & Rec On Target Construction documents are currently in design, with delivery to City Council anticipated in October 2025 for review and authorization to solicit bids. 99 RPU Power Supply Resource Plan Investments: Develop and enter into contracts for firm dispatchable generation, energy storage, wind and solar projects to help achieve greenhouse gas reduction goals. RPU On Target We made significant progress toward the 2030 renewable energy goal this year. We executed power purchase agreements with three wind projects that will provide approximately two-thirds of our energy needs and secured contracts early to bank renewable energy credits toward the 2030 target. We have also secured about two- thirds of our capacity needs, including City Council authorization for 20 megawatts of battery storage. We will continue monitoring contract risks and pursuing additional renewable energy opportunities to support non-carbon energy beyond 2030. 01/01/24 12/31/30 100 Silver Lake Dam Modification and Replacement: Dredge the lake, modify the dam, and implement trail connections to reduce long-term operation and maintenance costs associated with the dam, improve safety and accessibility, improve fish habitat, and enhance recreational opportunities. Public Works Delayed The project is experiencing schedule impacts due to delays in State and federal permitting, including extended review timelines caused by federal staffing challenges. The wave pool and rock arch rapids feature is the first design of its kind in Minnesota, which has required additional review by the Minnesota Department of Natural Resources. The current schedule anticipates permit approvals and bidding in April 2026, with a goal of bringing the project to City Council for consideration in May 2026; however, overall timing will depend on permit approvals. 01/01/23 07/01/27 101 South Broadway planning: Redesign South Broadway Avenue between 4th and 9th Streets and upgrade the intersection to improve safety and mobility. DMC & BFUiR On Target We are working with the Minnesota Department of Transportation and the Federal Highway Administration to finalize the grant agreement. Once the agreement is executed, we will release a request for proposals for planning, design, and engineering services, anticipated in March 2026. 07/01/25 07/01/28 102 Water Reclamation Plant: Upgrade equipment and update the treatment process to meet higher standards and reduce operational demands. Public Works On Target Construction is approximately 18 months underway. The schedule may extend into 2027 due to equipment manufacturing delays. 01/01/24 12/31/26 103 West Transit Village: Develop a mixed-use community and Link Bus Rapid Transit hub to provide retail, housing, parking, and other park amenities. DMC & BFUiR On Target Construction has begun at West Transit Village for the Link Bus Rapid Transit project, coordinated with adjacent work and on track for completion ahead of planned operations in 2027. 06/01/25 08/01/27 104 Willow Creek Trail & Safety Connection: Establish a trail and underpass beneath Highways 52/63 to connect Gamehaven Regional Park with the broader City trail system, improving access and safety for pedestrians and cyclists. Public Works On Target We are currently evaluating feasibility and identifying a preferred alignment. The project faces potential budget challenges because a pedestrian bridge over the County highway was not included in the original bonding request. We are advocating for a grade-separated crossing to improve safety, as an at-grade crossing along a 55-mph roadway would present significant risks. 01/01/25 07/01/28 105 Reporting: Use tracking tools and regular reports to ensure project timelines, budgets, and dependencies stay on track. Provide an integrated quarterly report reflecting the status of the projects above to the City Council. Admin On Target We are aligning project schedules, milestones, and dependencies for approximately $38 million in downtown infrastructure investments approved by the Destination Medical Center Corporation and City Council. Current work focuses on defining timelines, budgets, and sequencing to keep implementation on track, with a coordinated roadmap and schedule targeted for completion by January 2026. Progress will be monitored through regular check-ins and shared tracking tools, with integrated quarterly status updates provided to City Council. 106 Neighborhood Impact: Deliver transformational projects in a context-sensitive manner using co- design, business forward, neighborhood engagement, and effective project communication. DMC & BFUiR On Target We continue delivering project-specific outreach and engagement to help minimize neighborhood and business impacts during construction. Current efforts focus on the Link bus rapid transit project, including tunnel work near St. Marys, as well as the 6th Street project and downtown wayfinding improvements. Engagement includes direct meetings with affected businesses and residents, participation in neighborhood meetings, and regular updates through the Downtown Construction Weekly Update and the Link newsletter. Looking ahead, we will work with community partners, including Destination Medical Center and Mayo Clinic, to develop a coordinated communications and outreach workplan for 2026. Page 10 of 11Exported on February 17, 2026 10:30:26 AM PST Items Lead Department Current: Status Current: Update Start Date End Date 107 Selectively prioritize projects where planning now will ensure potential funding delivery post 2030 108 Effective Planning: Explore early planning, engagement and financing strategies for Civic Center Drive Reconstruction, South Broadway Reconstruction and Phase 2 Bus Rapid Transit Planning. Admin Not Started Early planning has not yet begun. These projects are largely dependent on future funding and coordination with partners such as the Minnesota Department of Transportation. We continue to monitor progress and watch for opportunities that would allow planning and engagement work to move forward. Ongoing Ongoing 109 Connected Parks and Trails: Explore options for additional park and trail investments. Provide a specific evaluation of enhancing the Park Levy focused on additional investment and indexing with inflation. Parks & Rec On Target This work is planned to occur alongside the Park System update, with targeted reviews of specific trail segments conducted as opportunities arise. We also continue coordinating with County and regional partners to explore expansion of the regional trail network. 11/07/25 12/01/27 110 DMC 2.0: Begin discussion on evolving the Destination Medical Center legislation to consider what options might exist beyond the 20-year project duration. DMC & BFUiR On Target The Destination Medical Center initiative has reached its 10-year milestone, marking the midpoint of the original 20-year legislation. We are working with DMC partners to develop a 10-year update outlining priorities and investments for the next phase and informing potential legislative renewal. The update, along with a related five-year plan, is scheduled for City Council consideration in January 2026 and will be forwarded to the DMC Board following Council approval. This work will guide future discussions with state partners on the long-term direction of DMC. 111 Optimize City services to effectively deliver and support transformational capital projects 112 Optimize Services: Replicate an internally focused process similar to predevelopment for City projects. Admin Not Started This project has not yet started.10/01/26 07/01/27 113 Talent Attraction: Recruit and retain employees that have strong implementation strengths, leveraging new technologies and approaches. HR On Target In 2025, we hired 100 new employees and promoted 36 employees into new roles. We are in the final approval stages for an assessment software platform that will enable us to evaluate candidates’ skill levels across key technical areas, including Microsoft Office applications, accounting, and customer service. In addition, we use behavioral-based interview questions to assess candidates’ execution and implementation strengths. 01/01/26 12/31/27 114 Financial Management: Update the City’s financial policies to ensure project accountability and efficiency. Finance On Target The Finance Team met with the Forward Team on January 28, 2026, to review recommended updates to the City’s financial policies and will incorporate the proposed changes into revised policy drafts. 10/14/24 04/27/26 115 Project Efficiency: Develop systems and strategies to ensure that to the maximum extent possible we “dig once.” Ensure that we effectively communicate construction and mitigate the impact to the maximum extent possible within the resources provided. DMC & BFUiR On Target We are coordinating across departments to align construction schedules and advance the City’s “dig once” approach. This work focuses on sequencing the City’s $38 million in public infrastructure investments alongside ongoing Mayo Clinic construction and major City projects, including Link Bus Rapid Transit. A coordinated construction timeline through 2030 is being developed, along with supporting maps, to minimize disruption and improve efficiency. In parallel, the City has implemented a temporary pedestrian wayfinding program to help residents and visitors navigate construction areas and support downtown businesses. This coordination effort will be shared with City Council at an upcoming Study Session on Supporting Transformation. Ongoing Ongoing 116 Optimize Operationalization: Balance programmatic objectives on transformational projects with a long- term stewardship perspective. Admin On Target Recent construction projects, including the Maintenance Center and Regional Sports and Recreation Complex, have prioritized program needs while advancing operational efficiency and long-term sustainability. Ongoing Ongoing 117 Visualize Project Impact: Evolve the existing project mapping framework to the multi-year Capital Improvement Plan Community Development Not Started This project has not yet started.05/01/26 11/01/27 118 Glidepath: As project charters are developed and Action Plan updates are completed, clearly articulate an inclusive decision making strategy and specific points of community engagement. Articulate specific project milestones, City Council updates, and City Council approvals that allow for time for policy input and evolution. Communications & Engagement Not Started Internal coordination is underway to develop a clear plan and timeline for advancing this work. Discussions are focused on defining next steps, roles, and milestones to support effective implementation. 01/01/26 TBD Page 11 of 11Exported on February 17, 2026 10:30:26 AM PST