HomeMy WebLinkAbout12/18/2006_RegularCITY OF ROCHESTER
COUNCIL AGENDA h(_
COUNCILIBOARD CHAMBERS O(D GOVERNMENTCENTER
151 4TH STREET SE
MEETING NO. 32
REGULAR ADJOURNED
PLEDGE OF ALLEGIANCE
PAGL
1-2 A) OPEN COMMENT PERIOD
B) CALL TO ORDER
DECEMBER 18, 2006
7:00 P.M.
C) LETTERS AND PETITIONS
3-4 1) Petition for Local Improvement — Pedestrian Walkway and Bike Path
2) Petition for Extension of Watermain to Serve Property at 7600 Highway
63 South
3) Presented Plaque to Amy Blenker for Services
5-6 D) CONSENT AGENDAIORGANIZATIONAL BUSINESS
1)
Approval of Minutes
7-8
2)
City of First Class Research
9-10
3)
Request for Funding/Rochesterfest 25th Celebration
11-14
4)
Completion Agreement — Eastwood Golf Course
15-16
5)
Amendment to Eastwood Development Agreement — Clubhouse
17-18
6)
Continuation of River Reporting Gauge — South Fork Zumbro River at 37th
Street NW
19-20
7)
Request to Initiate Annexation of 100% surrounded property in Cascade
Township
21-22
8)
Agreement with the City of Rochester to spread biological solids on
Airport Property
23-24
9)
Professional Services Agreement with McGhie & Betts Transportation
Services, Inc.
25-26
10)
Agreement between the City of Rochester and the Federal Aviation
Administration to lease space in the Air Traffic Control Tower Building
27-28
11)
Change Order #1 with Schwab Company for 2006
ARFF/SRE/Maintenance Building Expansion
29-30
12)
Licenses and Miscellaneous City Activities
31-32
13)
Approval of Accounts Payable
33-34
14)
Wal-Mart Donation
35-36
15)
MnLINK Gateway Server Site Agreement
37-46
16)
Consideration of Public Utility Board Action
Council Agenda
Monday, December 18, 2006
Page 2 of 2
47-48
49-50
51-52
53-54
55-56
57-58
59-60
61-62
63-64
65-66
67-68
E)
69-70
71-80
81-112
113-134
135-144
17) Initiating the Sale of General Obligations Waste Water Revenue Bonds
18) Supplemental Agreement #8 Gravity Flow Interceptor Phase I, J7712
19) Supplemental Agreement #46 Project #9408 (J2247) T.H. 14/52 Design
Build
20) Maintenance of Traffic Credit T.H. 14 / 52 Design Build Project #9408
(J2247)
21) Release of Responsibility/Haul Roads Project 49408 (J2247) T.H. 14 / 52
Design Build
22) Pedestrian Facilities Agreement — Thomas G. Davis Property (for M&B
#06-15)
23) Pedestrian Facilities Agreements — Christopher J. McLeod and Heidi M.
McLeod Property (for M&B #06-15)
24) Revocable Permit: Mayo Clinic Rochester — Awning within 2°d Street SW
Right of Way adjacent to 201 Building
25) Revocable Permit — Lots 12 & 13, Block 1, Northern Heights Subdivision —
Gentling Properties
26) Rochester City Lines Contract for 2007
27) Agreement for Park & Ride Lot / Bethel Lutheran Church
HEARINGS
1) Adoption of Proposed 2007 Budget and 2007-2012 Capital Improvements
Program
2) Appeal of Decision of the Animal control Review board on Potential Dangerous
Dog Designation on the Dog "Taz" Owned by Bondar and Alexey Leontovich.
3) Amendment to GDP #219 by RMN Land Development, LLC to be known as
Spring Brook Valley Subdivision
4) Amended Preliminary Plat #04-38 by RMN Land Development, LLC to be
known as Spring Brook Valley Subdivision
5) Final Plat #06-17 to be known as Rochester Towne Club Villas, by Platinum
Development Group
F) REPORTS AND RECOMMENDATIONS
G) RESOLUTIONS AND ORDINANCES
145-146
H) TABLED ITEMS
1) OTHER BUSINESS
J) ADJOURNMENT
REQUEST FOR COUNCIL ACTION
OPEN COMMENT PERIOD
ITEM DESCRIPTION: OPEN
CITY ADMINISTRATOR
MEETING
DATE: 1�
ITEM NO.
A
PREPARED BY:
S. KVENVOLD
This agenda section is primarily for the purpose of allowing citizens to address the City Council on a topic of
their choice. The following guidelines apply:
• This section of the agenda may not be used as a forum to continue discussion on an agenda item which has
already been held as a public hearing.
• This agenda section is limited to 15 minutes and each speaker is limited to 4 minutes.
• Any speakers not having the opportunity to be heard will be first to present at the next Council meeting.
• Citizens may only use this forum to address the Council on a maximum of one time per month.
• Matters currently under negotiation, litigation or related to personnel will not be discussed in this forum.
• Questions posed by a speaker will generally be responded to in writing.
COUNCIL ACTION: Motion by Second by: to:
v
Letters and Petitions
REQUEST FOR COUNCIL ACTION
City Clerk
MEETING
DATE: 12/18/06
ITEM DESCRIPTION: Petition for Local Improvement - Pedestrian Walkway and Bike Path PREPARED BY:
Judy Scherr
A petition has been received from residents in the Northeast area of Rochester requesting that a
Pedestrian Walkway and Bike Path be constructed on the north side of CR 22 between 16`b
Avenue N.E. and Alberta Drive N.E. The petition contains 107 signatures.
COUNCIL ACTION REQUESTED
LA motion to adopt the prepared resolution referring the petition to the Public Works Department
for a feasibility study.
COUNCIL ACTION: Motion by: second by: to:
REQUEST FOR COUNCIL ACTION MEETING
DATE: 12/18/06
AGENDA SECTION:
ORIGINATING DEPT:
ITEM NO.
Letters and Petitions
City Clerk
/1 4z
ITEM DESCRIPTION: Petition for Extension of Watermain to Serve Property at 7600
PREPARED BY:
Highway 63 South
Judy Scherr
A petition has been received from Robert Robinson, representing Tri-State Cold Storage/R & K
Express at 7600 Highway 63 South requesting City water services to the property.
COUNCIL ACTION REQUESTED
A motion to refer the petition from Tri-State Cold Storage/R & K Express requesting City water
(� ervices to the Public Works Department for a feasibility study.
i✓
COUNCIL ACTION: Mobon by: Second by: to:
TRI-STATE COLD STORAGE
R & K EXPRESS
December 13, 2006
Rochester Public Works
201 4" St. SE
Rochester, Min. 55904
Mr Mike Nibur
7600 HWY 63 South
Rochester, Mn. 55904
This is a letter to address our conversation on Dec. 11, 2006, As to the
Feasibility of having a water outlet for warehouse sprinkler installation. Some of this
property is already in the City Limits. We are basically interested in knowing if this will
work.
Sincerely, Robert Robinson
Contact Robert Robinson Or Keith Robinson
Phone: 507-285-0202 R & K Express. 507-286-1317 Tri State Cold Storage. Fax: 507-286-1119
REQUEST FOR COUNCIL ACTION
CONSENT AGENDA
REM DESCRIPTION: APPROVAL OF CONSENT
ORIGINATING DEPT:
CITY ADMINISTRATOR
ITEMS
MEETING 5
DATE: 12/18/06
D-1-27
WE ►1 00TFVi21
This RCA lists all the items which have been included in the consent agenda for this meeting. The Council can
approve all of the items with a single motion to approve. The Council President will allow the Councilmembers an
opportunity to state whether there are any of these items which you wish to have removed from the consent agenda
approval and to have them discussed and acted upon separately by the Council.
The consent agenda for this meeting consists of the following RCAs:
1) Approval of Minutes
2) City of First Class Research
3) Request for Funding/Rochesterfest 25th Celebration
4) Completion Agreement — Eastwood Golf Course
5) Amendment to Eastwood Development Agreement — Clubhouse
6) Continuation of River Reporting Gauge — South Fork Zumbro River at 37"' Street
NW
7) Request to Initiate Annexation of 100% surrounded property in Cascade
Township
8) Agreement with the City of Rochester to spread biological solids on Airport
Property
9) Professional Services Agreement with McGhie & Betts Transportation Services,
Inc.
10) Agreement between the City of Rochester and the Federal Aviation
Administration to lease space in the Air Traffic Control Tower Building
11) Change Order #1 with Schwab Company for 2006 ARFF/SRE/Maintenance
Building Expansion
12) Licenses and Miscellaneous City Activities
13) Approval of Accounts Payable
14) Wal-Mart Donation
15) MnLINK Gateway Server Site Agreement
-16) Consideration of Public Utility Board Action
17) Initiating the Sale of General Obligations Waste Water Revenue Bonds
18) Supplemental Agreement #8 Gravity Flow Interceptor Phase I, J7712
19) Supplemental Agreement #46 Project #9408 (J2247) T.H. 14/52 Design Build
COUNCIL ACTION: Motion by: Second by: to:
0
Page 2
December 18, 2006
20) Maintenance of Traffic Credit T.H. 14152 Design Build Project #9408 (J2247)
21) Release of Responsibility/Haul Roads Project #9408 (J2247) T.H. 14 / 52 Design
Build
22) Pedestrian Facilities Agreement — Thomas G. Davis Property (for M&B #06-15)
23) Pedestrian Facilities Agreements — Christopher J. McLeod and Heidi M. McLeod
Property (for M&B #06-15)
24) Revocable Permit: Mayo Clinic Rochester — Awning within 2nd Street SW Right of
Way adjacent to 201 Building
25) Revocable Permit — Lots 12 & 13, Block 1, Northern Heights Subdivision —
Gentling Properties
26) Rochester City Lines Contract for 2007
27) Agreement for Park & Ride Lot / Bethel Lutheran Church
COUNCIL ACTION REQUESTED:
Motion to approve consent agenda items
REQUEST FOR COUNCIL ACTION
MEETING
l
DATE: 12/ 18/06
CONSENT AGENDA
ADMINISTRATION
ITEM DESCRIPTION: CITY OF THE FIRST CLASS RESEARCH
ITEM;II -I
r
PREPARED BY:
S.KVENVOLD
The attached letter from the Charter Commission requests that the City of Rochester retain an individual to
research the implications for the City of Rochester when the population of the City reaches 100,000 and the
City receives a designation of a City of The First Class.
The individual would be retained and work under the direction of the City Attorney. I have reviewed this
request with the City Attorney, and we believe that an appropriation of $10,000 would be adequate to complete
the task.
COUNCIL ACTION REQUESTED:
Request a motion appropriating $10,000 from the 2006 Contingency Account to the City Attorney's
budget to fund the City of First Class research project.
COUNCIL ACTION: Motion by second by: to:
W,
Memo
To: Members — Rochester City Council
From: Randy Stayer, President
Rochester Charter Commission
CC: Stevan Kvenvold, City Administrator
Date- 11/16/2005
Re: City of the First Class — Research Opportunity
The Rochester Charter Commission has taken an interest in the City of Rochester's anticipated designation as
a city of the first class, a designation that will likely occur after the 2010 federal census. Cities of the first class
are those cities in Minnesota that reach a threshold of at least 100,000 in population. As such, meeting the
criteria for becoming a city of the first lass is straightforward. In preparation for that designation, the
commission has established a committee to review issues that will impact the City, Olmsted County, and
Independent School District 535. Preliminary research by the commission indicates that there are several
hundred instances in Minnesota statutory language that reference the Gass of a city and potentially affect
aspects of city governance, procedures, and relationships with the county and school district
The charter commission recognizes that there are certain issues it may wish to consider preemptively as the
city prepares for this eventuality. issues such as the continuation or reformatting of the civil service
commissions and a review of additional park department authorities seem appropriate for the commission's
consideration. Within the category of early considerations, the commission may begin review of the partisan
ballot question yet in 2006.
The commission also recognizes that there are many other issues that will need to be reviewed, considered,
and possibly acted upon by the respective governing bodies of the city, county and school district It appears
however, that the greatest impact will be on the city proper. Nevertheless, given the complexity and volume of
legislative language pertaining to cities of the first class, it would seem prudent to coordinate research activity
between the three bodies.
The charter commission sees this as an excellent opportunity for the city to recruit and hire a temporary
individual. This might be a law student or recent law school graduate or someone with similar skills and/or
interest Their activity would specifically relate to the research and proposal of suggested recommendations
regarding the impacts of the city of first class designation. We suggest that the person work under the
direction of the city attorney while also being allowed sufficient opportunity to work actively with city
administration and the charter commission.
The commission seeks your advice. I look forward to meeting with all of you as we begin these preparations
and I will be happy to answer any questions you may have for me.
Randy
Rochester Charter Commission
CONSENT AGENDA
REQUEST FOR COUNCIL ACTION
ORIGINATING DEPT:
ADMINISTRATION
REM DESCRIPTION: REQUEST FOR FUNDING/ROCHESTERFEST 25
CELEBRATION
MEETING
DATE: 12/18/06
ITEM NO.
PREPARED BY:
S.KVENVOLD
Rochesterfest is requesting $20,000 to assist in the 25"' Celebration of Rochesterfest (see attached).
COUNCIL ACTION REQUESTED:
Request a motion appropriating $20,000 from the 2006 Contingency Fund for the Rochesterfest 25h
Celebration.
COUNCIL ACTION: Motion by Second by
0
No
Cdebmfim
d.
city
October 5, 2006
Steve Kvenvold
City Administrator
201 4a' Street SE — Room 266
Rochester, MN 55904
Dear Steve,
Rochesterfest
Celebration of a City
June 16 to 24, 2007 will mark the 251b celebration of Rochesterfest. The Fest
provides a fun atmosphere, entertainment and camaraderie for the citizens of Rochester.
Thousands look forward to many of the events each year.
The in -kind services that have been provided by the Park and Recreation
Department as well as Public Works are substantial! We appreciate not only the
donation, but also the attitude with which it has been given each year since 1983.
In order to ensure a quality event, which provides mostly free entertainment for
everyone, we are asking for financial support in the amount of $20,000.
One of the items the funds would cover is the cost of security. It has become
necessary to provide not only police but also additional private security so that everyone
can feel safe in our wonderful city at the Fest.
Thank you and the Council for your consideration of this request from the
Celebration of a City Board.
Sincerely,
Co4leBwn
Executive Director
P.O. Box 007 • Rochester, Minnesota 55903 • Phone (507) 285-8769 • FAX (507) 285-8718
email: carole.brown@rochesterfest.com • website: www.Rochesterfest.com
CONSENT
REQUEST FOR COUNCIL ACTION
CITY ADMINISTRATOR
ITEM DESCRIPTION: COMPLETION AGREEMENT - EASTWOOD GOLF COURSE
MEETING R
DATE: 12/18/06
ITEM NO.
G. NEUMANN
The City entered into a Development Agreement (DA) with Platinum Development for the construction of a
collector roadway (Towne Club Road) and a New Nine at Eastwood, including a maintenance building and
driving range as part of an overall land swap transaction. Under terms of the DA Platinum was responsible for
the construction of the roadway and those golf course facilities and the cost thereof, with the City responsible for
a payment of $1,575,000. The construction of the New Nine by Platinum was substantially complete in
September of this year and the land transfer was completed; the City has had ownership of the New Nine since
that time. The transfer was subject to a punch list of items that Platinum continued to be responsible to complete
and for which the City withheld some of the required City payment. Platinum has been performing that work on
the New Nine into November.
At this time those punch list items and the DA requirements and obligations of Platinum relating to the New
Nine have been completed to the satisfaction of the Park and Recreation Department Superintendent and this
office. Both Platinum and the City staff believe it would be useful to approve a "completion agreement" that
acknowledges that Platinum has fulfilled their construction obligations for the New Nine and that the City has
fulfilled its payment obligations. There were a few items for which some things that were described as
Platinum's responsibility in the DA were undertaken by the City, instead of Platinum, with a price reduction
credit for the City (lighted ski trail; purchase and installation of golf course tee markers, flags, benches). These
are clarified in this agreement. As a result we are recommending that the City approve and execute with
Platinum an agreement to, essentially, formally close out the New Nine construction portion of the DA.
Overall the City staff has been very pleased with the contract performance of Platinum and the golf course
architect that they retained, Jim Felton. We believe that the New Nine that they have constructed and
transferred to the City will be great addition to the City of Rochester Golf program.
Council Action Requested.
Approve the "Agreement As To Completed Obligations Of The Development Agreement".
COUNCIL ACTION: Motion by: second by:_to.
AGREEMENT AS TO
COMPLETED OBLIGATIONS OF THE
ROCHESTER TOWNE CLUB DEVELOPMENT AGREEMENT
THIS AGREEMENT is made and entered into this day of
2006, by and between the CITY OF ROCHESTER, a Minnesota municipal corporation,
("City"), and PLATINUM DEVELOPMENT GROUP, INC., a Minnesota corporation
("Platinum").
WHEREAS, on or about August 24, 2005, the parties executed a Development
Agreement concerning Platinum's proposal to construct a new nine hole golf course in the
area of the City's current Eastwood Golf Course. The Agreement calls for the transfer of
the new nine hole golf course to the City in exchange for the existing front nine holes of
the Eastwood Golf Course that would be transferred to Platinum for development
purposes. The new development is generally known as Rochester Towne Club; and,
WHEREAS, since August, 2005, Platinum has engaged in considerable
construction activities needed to implement the DA. In addition, some informal
arrangements have occurred between the parties as to each party's obligations under the
DA; and,
WHEREAS, the parties believe it would be beneficial for them to express their
agreement as to those provisions of the DA have been completed to the parties' mutual
satisfaction and the agreed -upon changes to the DA.
NOW, THEREFORE, in consideration of the mutual undertakings and agreements
hereinafter set forth, the City and Platinum agree as follows:
1. Sections 28, 29 and 30 of the DA address Platinum's responsibility to
design and construct the nine new golf holes, driving range and
maintenance building at the Eastwood Golf Course ("New Nine"). Platinum
has performed its respective obligations under Sections 28, 29 and 30 of
the DA subject to two conditions. The first condition involves Platinum
providing a $20,000 credit to the City for the City's Section 9 payment
obligation. The City intends to use the $20,000 credit to order and install
the golf course accessories, which was a Platinum obligation under the DA.
The second condition involves Platinum providing a $10,000 credit to the
City for the City's Section 9 payment obligation in light of additional
improvements made by the City to the driving range.
2. Section 31b of the DA addresses Platinum's obligation to pay the costs for
the construction of the golf course, maintenance facility (not to exceed
1
0
$250,000), ski trail and driving range. Platinum has performed its
obligations under Section 31 b. The parties agree that the City has selected
the option under the City's Section 9 payment obligation to have the City
reconstruct the lighted ski trail resulting in a $40,000 credit to the City.
3. Section 9 of the DA addresses Platinum's responsibility to install one eight -
foot by nine -foot culvert for golf carts under Towne Club Road. The parties
have determined there is a need to revise the culvert location and design.
As such, the parties agree that the City's payment of $31,800 for the
engineering costs for the revised culvert location and increased culvert
length constitutes full and complete payment for such items by the City.
4. Except as otherwise provided by this Agreement, Platinum has completed
its construction obligations and has no further construction, maintenance,
repairs or correction responsibilities for the New Nine golf course including
the maintenance building and driving range.
5. Except as otherwise provided by this Agreement, City has no further
payment obligation to Platinum for the New Nine golf course, maintenance
building or driving range.
6. This Agreement relates solely to Sections 28, 29, 30 and 31 b, and a portion
of Section 9 of the DA. All other provisions of the DA, including those
provisions in Section 9 not addressed herein, remain in full force and effect.
7. Except as provided in Section 6 herein, it is understood and agreed that the
entire Agreement between the parties is contained herein and that this
Agreement supersedes all oral agreements and negotiations between the
parties relating to the subject matter.
IN WITNESS WHEREOF, the parties hereto have set their hands and seals the
day and year first above written.
CITY OF ROCHESTER
By
Its Mayor
Attest
Its City Clerk
06
PLATINUM
GROUP, INC.
M
DEVELOPMENT
Approved to Form:
City Attorney
STATE OF MINNESOTA )
) ss
COUNTY OF OLMSTED )
The foregoing agreement was acknowledged before me this day of
2006, by Ardell F. Brede and Judy Scherr, the Mayor and City Clerk,
respectively, of the City of Rochester, a Minnesota municipal corporation on behalf of the
corporation.
Notary Public
STATE OF MINNESOTA )
ss
COUNTY OF OLMSTED )
On this day of 2006, before me, a notary public within and
for said county personally appeared personally known to me to be the
of the corporation, and who executed the foregoing agreement on
behalf of the professional association and who further acknowledged that he is authorized
to execute this agreement on behalf of the corporation.
Notary Public
This agreement prepared by:
Rochester City Attorney's Office
201 Fourth Street S.E., Room 247
Rochester, MN 55904
K/Plati nu m ParComplete 1
REQUEST FOR COUNCIL ACTION
MEETING [�
DATE: 12/18/06
CONSENT
ORIGINATING DEPT:
CITY ADMINISTRATOR
ITEM DESCRIPTION: AMENDMENT TO EASTWOOD DA -
G. NEUMANN
Under Sections 26 and 27 of the Eastwood Development Agreement (DA) with Platinum, they have an option
to secure land to construct a new clubhouse provided that they have made a commitment to construct a new
clubhouse valued in excess of $2 million. This is an option in the agreement and it has never been a mandatory
requirement that they construct a new clubhouse. That option will expire February 24, 2007. Platinum is
currently working with a number of parties that have expressed interest in being involved in the construction of
a new clubhouse that meets the requirements in the agreement. They have requested a six month extension to
allow them time to see if they will be able to proceed to construct a new clubhouse pursuant to terms of the DA.
The Park and Rec. Superintendent and this office are recommending approval of a six month extension. It
would be beneficial to the City to secure a new clubhouse that is funded by private parties but which makes
provision for the golf pro shop and golf course operations. The alternative, if that cannot be accomplished,
would be for the city, at some point, to fund a new replacement clubhouse in the City CIP. Given the current
funding constraints in the CIP it would be difficult for the City to fund a new clubhouse construction.
Council Action Requested.
Amend Section 27 of the Eastwood as follows:
"Owner's commitment, as evidenced by meeting the conditions found in par. 26 (b) above, must be made within
24 (deleted 18) months of execution of this Development Agreement or the City shall be under no further
obligation to convey the Clubhouse property to Owner."
%OUNCIL ACTION: Motion by Second by to:
i) City has reviewed and approved the design of the Clubhouse & Proshop.
ii) Owner has received an approved site development plan and all zoning related
approvals for the new clubhouse.
iii) Upon substantial completion of construction of the New Nine and provision of a
letter of Credit to cover any warranty/incomplete items.
iv) Owner has provided evidence satisfactory to the City that financing is in place to
commence and complete construction of the clubhouse.
v) Owner has secured a building permit for the construction of the clubhouse.
vi) Owner has entered into an owner contract for the construction of roadways and
utilities for the development property.
vii) Not more than 18 months has passed since execution of this Development
Agreement
27) Clubhouse/Proshop — Following conveyance of the Clubhouse Property as outlined in par.
26(b), Owner may at its sole cost and expense construct a building and parking area to be
used for a new clubhouse, golf operations and banquet/restaurant facility ("New
Clubhouse"). Owner may obtain the commitment of one or more persons or entities to
construct, own, and operate the New Clubhouse. The New Clubhouse shall have a minimum
value of at least $2,000,000.00 and shall be located in the area of the existing clubhouse, or
another location mutually acceptable to the City and Owner. Owner's commitment, as
evidenced by meeting the conditions found in par.26(b) above, must be made within 18
months of execution of this Development Agreement or the City shall be under no further
obligation to convey the Clubhouse property to Owner.
If Owner satisfies the conditions of par. 26(b) and accepts the conveyance of the Clubhouse
Property, building construction shall commence and be completed within 12 months of
issuance of the building permit. If construction is not commenced or completed within this
12 month period, Owner shall reconvey unencumbered fee title of the Clubhouse Property to
the City at no cost to the City. If building construction commences the following conditions
shall also apply:
c) Owner shall create a Condominium Plat separating the golf operations portion of the
building from the remaining portion of the facility.
d) The City shall have authority to review and approve the design details and construction
documents for the Club House. The New Clubhouse will include space for a golf pro
shop and golf operations space consisting of 2,000 sq. ft. total, excluding bathroom
facilities.
e) The building shall be designed such that each entity (Golf Operations and Club House)
can either be self sufficient or incorporated into one facility.
17
REQUEST FOR COUNCIL ACTION
CONSENT AGENDA
ITEM DESCRIPTION: CONTINUATION OF RIVER REP
FORK ZUMBRO RIVER AT 37TH STREET NW
Administration
TING GAUGE - SOUTH
MEETING
DATE: 12/18/06
ITEM NO.
D-
PREPARED BY:
G. NEUMANN
In the fall of 1992, the City was advised by the U.S. Geological Survey (U.S.G.S.) Office that the
funding which they had been receiving from a department of the Corps of Engineers for the river
gauge at 37th Street NW would be discontinued in October of 1993. The new policy of the U.S.G.S.
with regard to the continuation of such river reporting gauges would be to request some cost sharing
participation from the local community in order to keep such river reporting gauges operational. The
U.S.G.S. has requested that the City of Rochester or any other local governments pay '/2 of the
annual maintenance costs of this gauge plus the annual electric and telephone costs. This originally
cost the City $4,400 per year for maintenance and $551 for telephone and electric. The U.S.G.S. has
requested increased funds annually from the City due to inflation, equalization of charges among their
gauging station network, and equipment upgrades. The total funding request for maintenance from
the City for October 1, 2006, to September 30, 2007 is $6,860 per year. It was $6,660 for 2006.
During 1992, 1 discussed this matter with Emergency Management, Public Works and Rochester
Public Utilities representatives. All of those departments strongly recommended the continuation of
the 371h Street river gauge to assist in forecasting flooding levels and in maintaining a comparative
level of flood elevations in Rochester. Knowledge of flood elevations is important to planning flood
control measures. In checking with them in September of 1999, they again recommended
continuation of the gauge. While the extensive flood control project will protect the City up to a 170
year flood event, there is always a small chance that some extreme flooding conditions could exceed
that design capacity. RPU has agreed to pay 1/2 of the City's continued maintenance of this river
gauge. The remainder of the City costs would be recommended to be taken from the flood control
account.
Approval of the City to agree to pay '/2 of the annual maintenance expenses for the periods of
October 1, 2006, through September 30, 2007, plus the telephone and electric expenses for the river
gauge at 37'" Street is recommended by this office.
COUNCIL ACTION REQUESTED:
Approval for City to enter into a joint funding agreement for the 37t' Street river gauge as described
above.
COUNCIL ACTION: Motion by: wood by: to:
REQUEST FOR COUNCIL ACTION
Consent Agends
initiate annexation
Township
City Administration
property
MEETING
DATE: 12/18/06
A
in May, 2004, the City and Cascade Township entered into an Orderly Annexation Agreement for a number of 100%
surrounded properties within Cascade Township. Under the terms of the OA Agreement, those properties were annexed
to the City as of January 1, 2006.
At this time there is a parcel that should have been included and annexed under the OA Agreement, however; the legal
description of this parcel was not included as part of the OA Agreement. The parcel is located directly south of the 37`h
Street Baptist Church, along Bandel Road NW, and is owned by the church. Therefore, at this time staff is requesting
the Council to initiate annexation of this 100% surrounded parcel by annexation ordinance.
COUNCIL ACTION REQUESTED:
A motion to initiate annexation of the 100% surrounded property within Cascade Township, located along Bandel
Road NW, and owned by the 37`h Street Baptist Church.
ATTACHMENTS:
1. Location Map
x
^x,
y
-
.
t
� yR€xM 2
`.. fir•€ r. i 1 �`� s4C' p�
�i
...
I
REQUEST FOR COUNCIL ACTION MEETING
DATE: 12/18/06
"GENDA SECTION: ORIGINATING DEPT: ITEM NO.
Consent Rochester International Airport O _
ITEM DESCRIPTION: Agreement with the City of Rochester to spread biological solids on PREPAREDALeqve
Airport Property. Steven W.
The Rochester Airport Commission recommends and requests Council authorization to:
Renew the Agreement between the City of Rochester and the Rochester Airport Company for the spreading of
biological solids from the Water Reclamation Plant on 1250.00 acres of Airport Property. The City of
Rochester/Water Reclamation Plant shall pay the Rochester Airport Company $168,750.00 or $135 per acre
annually. This is a two year agreement from l/1/2007 through 12/31/2008.
COUNCIL ACTION REQUESTED:
Resolution authorizing the Mayor, the City Clerk and the Rochester Airport Company to execute the Agreement.
COUNCIL ACTION: Motion by Second
REQUEST FOR COUNCIL ACTION
MEETING '
DATE: 12/18/06 "
AGENDA SECTION:
Consent
ORIGINATING DEPT:
Rochester International Airport
ITEM NO.
1_
ITEM DESCRIPTION: Professional Services Agreement with McGhie & Betts Transportation
PREPARED BAY:Smices-
W __ ve . _
__
The Rochester Airport Commission recommends and requests Council authorization to:
Enter into a Professional Services Agreement with McGhie & Betts Transportation Services, Inc. to provide
plans/specifications and overall project management for a restroom remodeling project in the Terminal Building at
the Rochester International Airport. TSP, a local architect and engineering firm, will assist and work as a sub
consultant under McGhie & Betts Transportation Services, Inc. The fees for these services will be provided as a
lump sum, not to exceed cost of $54,300. #6942
Funding: 70% State
30% Local
COUNCIL ACTION REQUESTED:
;solution authorizing the Mayor and the City Clerk execute the Professional Services Agreement with McGhie &
Betts Transportation Services, Inc.
COUNCIL ACTION: Motion by. second by. to:
REQUEST FOR COUNCIL ACTION
MEETING 7
DATE: 12/18/06�
i
AGENDA SECTION: ORIGINATING DEPT: ITEM NO. Ion
Consent Rochester International Airport D ,
ITEM DESCRIPTION: Agreement between the City of Rochester and the Federal Aviation PREPARED BY:
Administration to lease space in the Air Traffic Control Tower Building. Steven W. Legve
The Rochester Airport Commission recommends and requests Council authorization to:
Renew the Agreement between the City of Rochester and the Federal Aviation Administration to continue to lease
approximately 4,426 square feet of floor space in the Air Traffic Control Tower. This leased area is forAir Traffic
Control and Airways Facilities Sector Field Office and equipment. This is a five year agreement which is effective
10/1/2006 and continues through 9/30/2011. This agreement reflects a 17.5 % increase over the previous
agreement.
COUNCIL ACTION REQUESTED:
tesolution authorizing the Mayor and the City Clerk to execute the Agreement.
COUNCIL ACTION: Motion by: Second
r.
-AGENDA SECTION:
REQUEST FOR COUNCIL ACTION
ORIGINATING DEPT:
Consent I Rochester International Airport
ITEM DESCRIPTION: Change Order #1 with Schwab Company for 2006
ARFF/SRE/Maintenance Building Expansion.
The Rochester Airport Commission recommends and requests Council authorization to:
MEETING
DATE: 12/18/06
ITEM NO.
Steven W. Legve
Execute Change Order #1 with Schwab Company for 2006 ARFF/SRE/Maintenance Building Expansion.
This change order involves numerous work items that are detailed on the attached documentation. The net
effect of this change order is a payment to Schwab Company of $7,930.55. AIP Project #3-27-0084-23-06,
State Project #5501-149, City Project 46988.
Original Contract Amount: $2,524,500.
Funding: 95% Federal
5% Local
-OUNCIL ACTION REQUESTED:
Resolution authorizing the Mayor and the City Clerk to execute Change Order 41 and all associated documents with
Schwab Company.
COUNCIL ACTION: Motion by second
REQUEST FOR COUNCIL ACTION MEETING
04- t
DATE: 12/18/06
AGENDA SECTION:
ORIGINATING DEPT:
REM NO.
CONSENT AGENDA
CITY CLERK
(2
ITEM DESCRIPTION: LICENSES AND MISCELLANEOUS CITY ACTIVITIES
PREPARED BY:
Dale Kukla
The following licenses and miscellaneous activities are submitted for the Council's approvals or disapprovals.
All are pending departmental approvals, the required insurance and fees.
SINGLE GAMBLING
Church of Saint Frances of Assisi
318 I i m Avenue SE
Rochester, MN 55904
Raffles May 4, 2007
HVAC CONTRACTOR'S LICENSE
Carl E Johnson Plumbing and Heating Inc
12724 160a' Street
Milaca, MN 56353
Ery Smith Services Inc
1225 Truax Blvd
Eau Claire, WI 54703
Ryan Mechanical Inc
1547 Haycreek Valley Road
Red Wing, MN 55066
MASTER INSTALLER LICENSE
Terrance C Johnson DBA Carl E Johnson Plumbing & heating Inc
12898 160' Street
Milaca, MN 56353
Randal Ryan DBA Ryan Mechanical Inc
N929 825, Street
Hager City, WI 54014
COUNCIL ACTION: Motion by second by: tw
LICENSE AND MISCELLANEOUS ACTIVIES
PAGE 2
DECEMBER, 18,2006
NLASTER INSTALLER CON'T
Noel G Smith DBA Ery Smith Services Inc
2903 Sunset Drive
Eau Claire, WI 54703
JANUARY 1, 2007 RENEWAL LICENSE
Bus 1
HVAC 125
Master Installer 186
Pawnshops 3
Pigeons 3
Sewer & Drains 83
Sidewalks -Asphalt 14
Sidewalks -Concrete 105
Signs 30
Taxicabs 1
Telecommunications 13
Theatres (Motion pictures) 3
COUNCIL ACTION REQUESTED
A motion to approve the above licenses and miscellaneous activities.
REQUEST FOR COUNCIL ACTION
MEETING
3ENDA SECTION:
CONSENT AGENDA
CITY CLERK
DATE: 12/1
ITEM NO.
b-iz
ITEM DESCRIPTION: ACTIVITIES ADDITIONAL LICENSES, & MISCELLANEOUS CITY IGERBER
PREPED BY: .
The following licenses, bonds and miscellaneous activities are submitted for the Council's approvals or
disapprovals. All are pending departmental approvals, the required insurance, bonds, fees and all outstanding
debts with the City of Rochester.
DANCE -No Liquor
Blue Moon Ballroom
2010 U.S. Hwy 14 East
Rochester, MN 55902
Fred and Myrna Gommels
COUNCIL ACTION REQUESTED
A motion to approve the above licenses and miscellaneous city activities.
COUNCIL ACTION: Motion by: Second by: to:
REQUEST FOR COUNCIL ACTION
Consent Agenda I Finance Department
Approval of Accounts Payable
Respectfully request a motion to approve the following cash disbursements:
Investment purchases of
Accounts payable of
Total disbursements
$17,171,283.61
$9,204,486.86
$26,375,770.47
(Detailed listing of disbursements submitted separately.)
COUNCIL ACTION: Motion by Second by to:
MEETING '
DATE: 12/18/0�
-t3
Dale Martinson
REQUEST FOR COUNCIL ACTION MEETING i
DATE 12/lg/06 33
AGENDA SECTION: ORIGINATING DEPT: ITEM NO.
Consent Agenda Police D L j J
ITEM DESCRIPTION: Wal-Mart Donation PREPARED BY:
Roger Peterson
Wal-Mart has donated $2500 to the Police Department to be used for the Police Athletic League's "Shop
With a Cop" program. The intention is for the Police Department to accept the donation and in turn donate
the funds to the Police Athletic League.
COUNCIL ACTION REQUESTED:
The Police Department requests approval to accept a $2500 donation from Wal-Mart and also requests approval
to reissue these funds to the Police Athletic League for the "Shop with a Cop" program.
COUNCIL ACTION: Motion by Second by
to:
i
REQUEST FOR COUNCIL ACTION
NDA SECTION:
CONSENT AGENDA
ITEM DESCRIPTION:
MnLINK Gateway Server Site Agreement
ORIGINATING DEPT:
Rochester Public Library
MEETING
DATE. 1 2I
ITEM NO.
PREPARED BY:
Audrey Belcher
MnLINK is Minnesota's Library Information Network. The MnLINK Gateway is a portal into nearly all
of Minnesota's library resources. This gateway allows the people of Minnesota to login using their local
library card and to request that materials from around the state be delivered to their local library. This
expanded interlibrary loan brings the request process directly to the library user as they select items and
place their "Get It" request online 24 hours a day, 7 days a week.
The Rochester Public Library is one point of entry.
COUNCIL ACTION REQUESTED
Request a motion authorizing the signing of the MnLINK Gateway Server Site Agreement.
Second by:
COUNCIL ACTION: Motion by:
to:
Meeting
REQUEST FOR COUNCIL ACTION Date_ 12/16/06
AGENDA SECTION
ORIGINATING DEPT:
Consent Agenda
ITE`t! � ��
����
Rochester Public Utilities
ITEM DESCRIPTION:
PREPARED BY:
Consideration of Public Utility Board Action
Kathy Wilson
The Rochester Public Utility Board has approved the following on December 14, 2006 and requests
the Common Council's favorable consideration:
- to approve a resolution to approve an insurance agreement with Starr -Technical Risk Agency, Inc.
for All Risk Property Insurance. The insurance agreement to be for a twelve month policy period
commencing December 31, 2006 and expiring December 31, 2007. The amount of the twelve
month premium to be $313,897.
- to approve a resolution to approve an insurance agreement with the League of Minnesota Cities
Insurance Trust for Commercial Automobile and General Liability Insurance. The insurance
agreement to be for a twelve month policy period commencing December 31, 2006 and expiring
December 31, 2007. The amount of the twelve month premium to be $129,633.
- to approve a resolution to approve issuance of Electric Revenue Bonds for the emission reduction
project at Silver Lake Plant for approximately $34,000,000, financing of electric system
improvements at $14,000,000 and refunding the Series 2000 Electric Revenue Bonds for a total
principal amount, including costs of issuance and other related financing costs, of approximately
$90,000,000.
- to approve a resolution to approve a contract agreement with Clyde Bergemann Environmental
Elements Corporation for the purchase of scrubber/baghouse equipment for Silver Lake Plant unit 4
not to exceed $11,427,000, and that the Mayor and City Clerk execute the agreement.
- to approve a resolution to approve a purchase order agreement with Merit Contracting, Inc. for
partial roofing of Silver Lake Plant in the amount of $137,242.
- to approve a resolution to approve four CapX 2020 agreements with the City of Rochester, and that
the Mayor and City Clerk execute the agreements.
- to approve a resolution to approve the 2007 RPU electric and water capital and operating budgets.
- to approve a resolution to approve an 8% increase in electric rates effective January 1, 2007.
- to approve a resolution to approve a increase in wader rates effective January 1, 2007.
/5%
x/1 i �� ✓`cZ t 4 is<% .w 'L /c _,� ." .4N' �'-'� C�.E.� ( �.2"-- L+LC.Zt 4a
L[t6h/
L;
GENERALMANAGER: 4",7 (i
COUNCIL ACTION: Motion by: Seoond by to:
FOR BOARD ACTION
Agenda Item # 4. Meeting Date: 12/14/06
SUBJECT:
Insurance Quotations for 2007
PREPARED BY: Curt Kraft, Director of Corporate Services
Mamy Billings, Manager of Business Services
ITEM DESCRIPTION:
Listed below are the recommended insurance quotations for obtaining all risk property insurance, general
liability, and automotive insurance for 2007.
ALL RISK PROPERTY INURANCE:
The C.O. Brown Agency received three proposals on RPU Property Insurance. The first one is from AIG,
the second is from Starr -Technical Risk Agency (Hartford Steam), our current property insurance provider
and the third is from AEGIS, who provides our umbrella liability coverage; they have started a new
program to offer property coverage to utilities.
The three carriers based their quotes on policy limits that were decreased from $ 200 million to
$ 150 million, and the deductibles remained the same. Their quotes were based on values adjusted by 8% to
better reflect current replacement costs. The coverage from all three carriers are very comparable, therefore
the staff is recommending to accept the lowest premium submitted by Starr -Technical Risk Agency.
PROPERTY VALUE
PREMIUM
2005 $ 209,390,000
$ 532,177
2006 $ 224,850,000
$ 420,000
2007 $ 231,449,000
$ 313,897
The above coverage does not provide for acts of terrorism.
LIABILITY AND COMMERICAL AUTO INSURANCE:
Staff recommends maintaining the same structure of coverage for liability and auto insurance, having the
League of MN Cities Insurance Trust provide the primary coverage up to $ 1,000,000. In 2006, RPU will
be receiving a dividend from the League of $7,200.
Staff also recommends maintaining AEGIS to provide blanket liability coverage with limits from
$ 1,000,000 up to $ 20,000,000.
2005 2006 2007
League of MN Cities $ 118,328 $ 123,571 $ 129,633
AEGIS $ 69,385 $ 71,361 $ 84,123
Date
FOR BOARD ACTION
Agenda Item # 5.a. Meeting Date: 12114/06
SUBJECT: Emissions Reduction Project and Financing
SLP Unit 4
PREPARED BY:
Wally Scblink, Director of Power Resources
ITEM DESCRIPTION:
Beginning in 2003, a team of RPU staff and consultants have been working on an emission reduction
program that would result in significantly reducing both the rate and the total amount of emissions
from Silver Lake Power Plant Unit 4.
The Utility Board approved going forward with the permitting, engineering and design activities at
the July 25, 2005 meeting. Since that time staff has refined the feasibility study and the related scope,
cost estimates and schedule. More importantly, staff negotiated an agreement that would set the
design parameters and other obligations that the utility must conform to in the implementation of the
emissions reduction project. Staff reached an agreement and at the May 30, 2006 Utility Board
meeting the Board approved the agreement.
At the June 2006 Board meeting an engineering services agreement with Utility Engineering was
approved and they, along with staff have been working diligently to proceed with the significant
activities that are required to make the emission reduction plan into a reality. Also at the June
meeting staff presented a detailed scope, schedule and budget for the project.
We are now prepared to request that the Board formally approve the project and to also approve a
financing plan that will allow the utility to issue electric revenue bonds to pay for the Emissions
Reduction Project as well as other necessary infrastructure capital development.
Attached is a scope document that outlines the project, a letter from the financial advisor supporting
the bonding plan as well as a memorandum from the RPU General Manager detailing the issues
related to this financing and refunding of our 2000 bond issue. The total principal amount of the
Electric Revenue Bonds to finance the emission reduction project, electric system improvements and
the refunding, including costs of issuance and other related financing costs, will be approximately
$90,000,000.
Staff will be at the Board meeting to answer any questions on this request.
UTILITY BOARD ACTION REOUESTED:
Staff recommends that the Board approve and request the Common Council approve a resolution
authorizing the SLP Unit 4 Emission Reduction Project. Staff also requests the same resolution
approve financing of the Emission Reduction Project as well as other capital infrastructure
improvements through issuance of electric revenue bonds and refunding of our 2000 bond issue.
5
FOR BOARD ACTION
Agenda Item # 5.b. Meeting Date:
SUBJECT: Emissions Reduction Project
Approval to Purchase Scrubber / Baghouse Equipment
PREPARED BY:
Wally Schlink, Director of Power Resources
ITEM DESCRIPTION:
12/14106
Starting in 2003, a team of RPU staff and consultants have been working on an emission reduction
program that would result in significantly reducing both the rate and the total amount of emissions
from Silver Lake Power Plant Unit 4.
We are now ready to make our first purchase of major equipment that will be installed to fulfill the
commitments that we have made to provide major reductions in S02 and particulate emissions in our
community. The decision was made, based on delivery schedules, performance efficiencies and to
take advantage of economies of scale, to purchase the scrubber, baghouse, booster fan, ductwork and
support structure as a single package. The request before you meets that criteria as well as the most
important requirement which is the removal of S02 and particulate emissions to meet our emission
reduction targets.
Through our engineers, Utility Engineering, a specification was distributed to 7 suppliers and only
one bidder eventually chose to bid on the project. Currently there is a boom in the building of coal
fired power plants world wide and the installation of emission reduction equipment domestically that
has the suppliers of equipment being very selective in their choice of project participation. In reality,
the RPU project is very small on the scale of projects on the drawing board and participation by the
bidders reflected that fact.
On a more positive note we are very pleased that the bidder that did respond, Clyde Bergemann
Environmental Elements Corporation, met all the criteria of the Request for Bid and is a reputable
supplier of emission reduction equipment with a track record of successful installations on units
equivalent in size to SLP Unit 4.
We request that the Board approve the purchase of the scrubber / baghouse as defined in the RFB.
Included in the request is the detailed base bid ($8,373,000), Performance Bond ($2,520,000), option
upgrades ($334,000) and an escalation allowance ($200,000) for a total approved amount of
$11,427,000. This is a budgeted project in the 2007 capital budget request.
Attached is a recommendation from Utility Engineering, as well as a copy of the purchasing contract
agreement. Staff and a representative from Utility Engineering will be at the Board meeting to
answer any questions on this request.
i
ii * r
y n..- �.
l
FOR BOARD ACTION
Agenda Item # S.C. Meeting Date:
SUBJECT:
Bid for Construction Services
Merit Contracting, Inc.
Partial Roofing of Silver Lake Plant — Phase Il
PREPARED BY:
Tony Dzubay, Power Production Engineer RPU
12114106
ITEM DESCRIPTION: In February, 2005, TSP of Rochester, MN was hired through a Professional
Engineering Services Contract to assist RPU personnel with the design, bid process and supervision for
the partial re -roof of The Silver Lake Plant. Three levels of the SLP roof are included in this project.
RPU and TSP have completed the design and bidding process and are awaiting the approval to
schedule the work.
The request for bids was advertised in the Post Bulletin with a desire to keep the work within the
Rochester area On November 21, 2006 four acceptable bids, with respect to the plans and
specifications prepared by TSP, were received. The low bidder was Merit Contracting, Inc with a base
bid of $118,651. The other bids from Interstate Roofing and Waterproofing, Schwickert's of Rochester
and Winona Heating and Ventilation were $149,800, $143,500 and $124,730, respectively. Merit was
contacted to confirm their bid was mathematically correct and that all materials and anticipated work
was accounted for. The bidder confirmed that their bid was valid and the work could be done for the
given price.
RPU will require Merit to begin work in the spring of 2007. All work shall be completed by August
31, 2007 per the contract. TSP has worked with Merit on multiple jobs in the past and considers them
to be a reputable roofing company and sees no reason to decline their bid.
The contract also includes three alternates that were priced out by each bidder. TSP and RPU
recommends that Alternates 42 and 3 be rejected and Alternate #1 be accepted for $18,591. Alternate
41 adds another section of roof that would be more cost effective to do while Merit is mobilized on site.
Funds for this project have been planned for in the annual SLP cost center budget for 2007.
UTILITY BOARD ACT10N REQUESTED.
Staff recommends that the Board approve a purchase order agreement in the amount of $137,242 for
the construction services for the partial roofing of the Silver Lake Plant through Merit Contracting,
Inc.
--Grek�ral Manager
�.
Agenda Item # 7.
SUBJECT:
PREPARED BY:
ITEM DESCRIPTION:
FOR BOARD ACTION
Meeting Date: 12114/06
CapX Participation Agreement and amenamenrs
Gerry Steffens, Manager of System
Since June 2006 the CapX agreements team has been meeting to codify the agreements necessary to create
a CapX organization as well as pursue the $1.3 Billion worth of transmission construction being
undertaken by the CapX 2020 participants. Our legal representative has been Eric Swanson of the
Minneapolis office of Winthrop and Weinstine. We hired outside legal representation due to the amount of
time required for the participation and development agreements.
Three agreements were previously approved (in September) by the Board and Council. They are:
1. The CapX Confidentiality Agreement
2. Southeast Twin Cities -Rochester -La Crosse Transmission Project Memorandum of Understanding
3. The CapX Organization Memorandum of Understanding
This FBA requests approval of amendments to agreements 1 and 2. It further requests approval of the
CapX 2020 Transmission Capacity Expansion Initiative Participation Agreement dated January 1, 2007
(hereafter referred to as the Participation Agreement) and the Joint Prosecution Agreement Each
agreement action is discussed individually below.
1. CanX Confidentiality AuLement
The Confidentiality Agreement simply obligates all CapX participants to treat the confidential
information of other participants in a uniform manner. The previously approved agreement expires on
December 31, 2006. The original schedule called for the permanent participation agreement as well as the
four project development agreements to be approved and in place on January 1, 2007. Since the project
development agreements will not be in final form until December 22nd and therefore will not be approved
by all eleven participants until mid February 2007, the termination date of the Confidentiality Agreement is
u
being amended from December 31, 2006 to February 28, 2007. There is no monetary component to the
Confidentiality Agreement. Once both the Participation Agreement and the development agreements are
approved, the Confidentiality Agreement will no longer be required since the individual agreements include
the confidentiality provisions. Attached is the amendment to the Confidentiality Agreement to change the
termination date.
la y
Cy6neral Manager Date
FOR BOARD ACTION
Agenda Item # 7. Meeting Date: 12/14106
2. Amendment of the Southeast Twin Cities -Rochester -La Crosse Transmission Project Memorandum of
Understanding
Since the Project Development Agreement will not be finalized until December 22, 2006, it will not come
to the Board and Council for approval until the January Board meeting and the first February City Council
meeting. The original MOU covers the maximum potential 2006 project -related costs of $1,060,000 for
the 345 and 161 lines proposed to be constructed and has a termination date of December 31, 2006. The
amendment changes the maximum amount to $1,272,000 and extends the agreement termination date to
February 28, 2007. The maximum exposure of RPU under this agreement is 9% of the total amount, or
$114,480, which is increased from the previous $95,400 maximum exposure. Adequate monies for this
agreement are included in the five year budget projections and the detailed 2007 budget amounts.
3. CapX 2020 Transmission Capacity Expansion Initiative Participation Agreement dated January 1, 2007
(Participation Agreement)
The Participation Agreement replaces the existing CapX Organization Memorandum of Understanding,
which terminates on December 31, 2006. It is intended to become effective January 1, 2007 and remain in
effect until December 31, 2020 (Section 3a). Any participant can withdraw at any time and their only
obligation will be to pay their portion of the approved CapX costs for the remainder of the fiscal year
(Section 8a). For 2007, RPU's obligations under the Participation Agreement are expected to be 2.823%
(see Appendix B) of an estimated budget of $1,736,130, or $49,011. These monies are included in the five-
year and 2007 proposed budget amounts. As participants join or withdraw from the CapX organization,
RPU's percentage can change somewhat; but it will not change dramatically unless the large members
terminate their participation, which would likely mean the organization would terminate. Provisions are
included in the Agreement for this eventuality. This Agreement (draft attached) is still undergoing
review/revision by the parties.
4. Joint Prosecution Agreement
The Joint Prosecution Agreement is an agreement between the CapX participants that is intended to
govern the exchange of ideas, materials, and information in furtherance of obtaining a Certificate of Need
and Other Regulatory Proceedings required for the construction of CapX transmission facilities. This
Agreement (draft attached) is still undergoing review/revision by the parties.
General Manager Date
Agenda Item # - 9.
SUBJECT:
PREPARED BY:
ITEM DESCRIPTION:
FOR BOARD ACTION
Meeting Date:
Approval of 2007 Electric and Water Budgets
Curt Kraft, Director of Corporate Services
12114106
In November, staff reviewed the preliminary 2007 electric and water budgets with the finance committee
and the Board as a whole. At that time, there were no changes made to the expense portion of the operating
and capital budgets. The Board was presented with recommendations for an 8% revenue adjustment in the
electric utility and 5% in the water utility to support the 2007 budget requests while maintaining
appropriate cash reserve levels.
Noteworthy items in the electric budget include:
• The retail revenue forecast for 2007 estimates a 2.3% growth in our customer base and a 3.9%
growth in sales over 2006. Wholesale revenues are projected at $ 23.5 million for 2007 which
makes up 16% of our overall operating revenues.
• Operating expenses reflect purchased power costs increasing by $10 million dollars in 2007, an
increase of more than 14%. No change to our fizll time employee base is planned.
• Capital expenses show construction beginning on the emission control project at SLP, along with
costs for local and regional transmission projects we are participating in.
• The budget includes the cost of debt to finance projects from 2007-2009 that aren't part of our
regular capital activity.
Water utility budget items include:
The retail revenue forecast has an increase of 1.4% growth in the customer base, but a 4% decrease
in sales for 2007 compared to 2006 due to the unusual dry summer periods.
The operating expenses have been adjusted to reflect normal cost increases. Capital costs show
standard expansion and replacement activity.
The first principal payment occurs in 2007 on the short term borrowing done in 2006.
Summary financial sheets are attached reflecting the recommended revenue adjustments.
UTILITY BOARD ACTION REQUESTED:
The Board is requested to approve and recommend that the City Council approve the 2007 RPU electric
and water budgets.
Ge eral Manager 6ate
FOR BOARD ACTION
Agenda Item # 10. Meeting Date: 12/14/06
SUBJECT:
PREPARED BY:
2007 Electric Revenue Adjustment
Curt Kraft, Director of Corporate Services
ITEM DESCRIPTION:
At the last Utility Board meeting, staff presented alternative revenue adjustments that would allow for providing
reliable, quality service and maintaining a sound financial position. The Board's preliminary consensus was for
an 8% increase in 2007. A notice of the proposed revenue adjustment was provided to the public via the paper of
record.
Staff recommends that the Board proceed with a recommendation to the City Council for increasing electric rates
by 8% effective January 1, 2007 on all the current rate schedules. An 8% increase would increase the typical
residential bill by approximately $ 5.50 per month.
Staff would also propose that the customer charge for a residential customer be adjusted from $ 10 to $ 11.50,
and the general service customer be adjusted from $20 to $ 23, while maintaining an overall increase of 8% in
these rate classes. The adjustment to this rate component moves us closer to what our cost -of -service model
indicates we should be.
Staff recommends the removal of language in the rate schedules related to specific initiation dates for the
interruptible rate. Staff further recommends the removal of the Heating Seasonal Performance Factor (HSPF) and
the Co -efficient of Performance (COP) as minimum qualifications for Air Source and Ground Source heat pumps as
these factors are related to heating load. The efficiency factors related to cooling loads are more important to RPU
and are still part of the high -efficiency HVAC rates. Additionally, for all rate tariffs with a demand component, staff
recommends changing the tern "month" used in the explanation of determination of demand and billing demand to
the term "billing periods" and adding the statement explaining that billing periods may not coincide with calendar
months. This will more accurately describe billing practices.
UTILITY BOARD ACTION REOUESTED:
1. Approve and recommend to the City Council an 8.0% electric rate increase to all customer classes effective
January 1, 2007.
2. Approve a resolution for the following existing and modified rate schedules to be effective January 1, 2007.
Residential Service (RES)
Residential Service -Dual Fuel (RES-DF)
Residential -High Efficiency HVAC (RES-HEF)
General Service (GS)
General Service -High Efficiency
General Service Time -Of -Use (GS-TOU)
Medium General Service (MGS)
Medium General Service -High Efficiency
Medium General Service Time -Of -Use (MGS-TOU)
Large General Service (LGS)
Large Industrial Service (LIS)
Interruptible Service (INTR)
City Street Lighting (CSL)
Traffic Signals (TS)
Highway Lighting (HL)
Security Lighting (SL)
Civil Defense Sirens (CDS)
!� /a ii
eneral Manager Date
Agenda Item # 11.
SUBJECT:
PREPARED BY:
ITEM DESCRIPTION
FOR BOARD ACTION
Meeting Date: 12114/06
2007 Water Revenue Adjustment
Curt Kraft, Director of Corporate Services
v
At the November meeting the Board preliminarily agreed that a 5% increase for 2007 was needed to
maintain reliable quality service, while maintaining a sound financial position. A notice of the proposed
revenue adjustment was provided to the public via the paper of record. A 5% adjustment will result in an
increase of approximately $0.56 per month for a typical residential customer.
Staff recommends that the Board proceed with a recommendation to the City Council for increasing
water rates by 5% effective January 1, 2007.
UTILITY BOARD ACTION REOUESTED:
1. Approve and recommend to the City Council a 5.0% water rate increase to all customer classes
effective January 1, 2007.
2. Approve a resolution to approve the attached rate schedules effective January 1, 2007.
Water Service (WTR)
Fire Hydrant Facilities Charge (FHFC)
Ge66ral Manager Date
ri
REQUEST FOR COUNCIL ACTION MEETING
DATE: 12/18/2006
3ENDA SECTION:
ORIGINATING DEPT:
ITEM NO.
Consent Agenda/Organizational Business
Finance Department
It � `�]
ITEM DESCRIPTION: Initiating the Sale of General Obligations Waste Water Revenue Bonds
PREPARED BY:
Dale Martinson
At the December IIth, 2006 meeting, council authorized sewer rate and plant investment fee increases
consistent with the update to the rate study recently completed for the sewer utility. That rate study
contemplated the issuance of bonds to finance phase two of the expansion of the sewer utility system. The
first phase provided for the expansion and upgrade of the plant, while this proposed financing provides for
the new major trunk lines and lift station that feeds this additional plant capacity.
We are proposing two distinct bond structures be issued to finance these projects. We are requesting
approval of two separate resolutions, one for each bond issue, where we ask the council to authorize the sale
and direct us to proceed with the process.
A summary of the proposed bonding is as follows:
$30,860,000 General Obligation Waste Water Revenue Bonds, Series 2007A
1. Sold by competitive negotiated sale, through sealed or electronic bid up until 10:00 AM January 17th.
2. Fixed interest rate and 20-year term with approximately level principal plus interest payments over the
life of the bonds.
3. Proceeds to fund the upgrade and maintenance of the plant, lift station, and trunk lines and therefore
repaid through sewer rates.
$20,000,000 Variable Rate General Obligation Waste Water Revenue Bonds
1. Sold negotiated sale sometime after January 17ffi whereby our financial advisors, Springsted, Inc., assist
in selection of underwriter and the terms and specifics are negotiated with large, institutional buyers.
2. Variable rate with some final bullet maturity where interest rate is reset weekly, interest is paid monthly
and principal payments are not scheduled, but can occur at any given interest reset date.
3. Proceeds to fund tnutkline sewers and new lift station capacity and therefore repaid through collections
of SAC charges when paid by developers. Interest payments will be made by rate payers, but will be
reimbursed through ENR adjustment portion of SAC charges over time.
Both issues would come before the council for final approval when best offers have been received. The
first issue would be ready for the January 17s' meeting. The second issue is a bit more complicated to put
together and thus is proposed as a negotiated sale with final approval likely at the first meeting in February.
A representative from our financial advisors, Springsted, Inc., will be available at the meeting to address any
questions that may arise on this item.
Recommended Council Action:
�. Approve the for the sale of both the fixed and variable rate GO Waste Water Revenue
resolutions providing
Bonds and directing staff to work with Springsted, Inc. to proceed with competitive and negotiated sale
process, subject to final approval by council at a later date.
COUNCIL ACTION: Motion by: Second by: to:
REQUEST FOR COUNCIL ACTION MEETING
DATE:
0/
12/18/06
ENDA SECTION:
ORIGINATING DEPT:
Public Works
ITEM NO.
- i9
CONSENT AGENDA
ITEM DESCRIPTION: Supplemental Agreement #BGravity Flow Interceptor Phase I,
PREPARED BY:
J7712
hi J. Loehr
The City previously entered into a contract with Lametti & Sons, Inc. for the construction f a project described as
follows:
Protect No. M2-42. J7712
"Gravity Interceptor Sewer Phase 1".
SA #8:
The plan and specification provided an Interim Completion Date of June 1, 2006 for all project work that is located
north of 37`h Street NW.
The City and Lametti previously entered into seven Supplemental Agreements for a number of plan changes and
unanticipated items. The additional items of work prevent the work located north of 37th Street from being
completed by June 1, 2006. The Supplemental Agreements inadvertently failed to provide a new interim
completion date for the additional work.
The plan and specification further provide a Complete the Final Project Date of December 31, 2006.
When excavating along the west bank of the Zumbro River a significant amount of buried rubble, tires, metal
pipes, water heaters and miscellaneous construction debris was encountered. The engineer determined that the
material must be sorted to enable the material to be used as trench backfill. Sorting of the material will prevent the
project to be completed by December 31, 2006. Additional costs related to this additional work will be included in a
separate Supplemental Agreement when the full extent and cost of the work is known.
Public Works negotiated revised Interim Completion Dates and Complete the Final Project Date with Lametti &
Sons as follows:
The original Interim Completion Date of June 1, 2006 is revised to September 1, 2006 to complete all work north of
371h Street adjacent to the WRP main entrance and to December 22, 2006 for all other underground work located
north of 37th Street.
A new Interim Completion Date of December 22, 2006 is established to be capable of discharging all existing
sanitary sewer flows into the new 84" sanitary sewer interceptor.
A new Interim Completion Date of May 1, 2006 is established to complete all sanitary sewer and underground
work.
The original Complete the Entire Project Date of December 31, 2006 is revised to June 15, 2006.
COUNCIL ACTION REQUESTED:
1. Adopt a resolution authorizing the Mayor and City Clerk to enter into SA #8.
Attachment: SA #8
COUNCIL ACTION: Motion by: Second by: to
REQUEST FOR COUNCIL ACTION MEETING
DATE:
12;18/06
GENDA SECTION:
ORIGINATING DEPT:
ITEM NO.
CONSENT AGENDA
i
Public Works
1"�) — l
ITEM DESCRIPTION: Supplemental Agreement # 46 Project # 9408 (J2247)
PR, PARED BY:
T.H. 14 / 52 Design Build
M. Easley
The MNDOT HWY 52 Design Build contract provided for the construction of HWY 52
Mainline, Ramps, Bridges, Frontage Roads, and City Streets, along the corridor, through the
City of Rochester. MNDOT and the City entered into a Municipal Cost Share Agreement to
provide for the construction and to assign responsibility for costs associated with the work.
On a project of this magnitude It is typical that a number of alterations, additions, or
deletions to the work occur, resulting in the need for cost adjustments to the contract. This
supplemental agreement was prepared to provide for adjustments to the contract for both
compensation for additional work completed on the project, and credit for work deleted from
the project at the request of the City. Costs represented in this agreement are a cumulation
of all remaining construction related claims resulting from the ROC 52 Contract.
MNDOT's Project Engineer has submitted Supplemental Agreement # 46 Project # 9408
(J2247) in the amount of a $286,860.77 Credit to the City Share in the Municipal Cost Share
Agreement to cover the cost of:
1. Compensation for revisions to planned ROC 52 Storm Sewer plans on the East Frontage Road
of Hwy 52 from Assisi Drive to 7t" St. N.W. to eliminate additional storm water discharges into
and already taxed local storm sewer system.
2. Credit for the deletion of the extension of the Bandel Road connection to 65" St. N.W. from the
ROC 52 contract to enable the construction of a future interchange at 65t" St. N.W. and HWY 52,
which required a realignment of the Bandel Road at 651" St. N.W.
3. Compensation for revisions to the 65t" St. N.W. Bridge over HWY 52, and connecting roadway,
to provide for the future intersection connecting highway ramps to be constructed with the
interchange, as well as, design costs incurred with deletion of Bandel Road and the 65t" St. N.W.
revisions.
COUNCIL ACTION REQUESTED:
Adopt a resolution agreeing to the terms of Supplemental Agreement #46 Project #9408 (J2247) in the
amount of a $286,860.77 credit to the MNDOT / City Cost Share Agreement. HWY 52 Design Build.
COUNCIL ACTION: Motion by Second by: to:
REQUEST FOR COUNCIL ACTION MEETING
DATE: 12/ 6
LGENDA SECTION: ORIGINATING DEPT: ITEM NO.
CONSENT AGENDA Public Works lb _ ;(D
ITEM DESCRIPTION: Maintenance of Traffic Credit PR PARED BY:
T.H. 14152 Design Build Project # 9408 (J2247) L) M. Easley c6,
The City of Rochester and the Minnesota Department of Transportation entered into a Municipal Cost
Share Agreement for the Construction of the Highway 52 Corridor through the City. The MNDOT
Contract Proposal for Highway 52 set forth detailed parameters for the maintenance of traffic, during the
course of the construction.
As construction activities developed, and in the interest of expediting certain HWY 52 construction
activities, MNDOT, it s Contractor, and the City agreed to some deviation from contract requirements,
relative to the maintenance of traffic on particular sections of roadway work within the corridor. This
resulted, to a limited degree, in the use of City Streets as detours and alternate routes for traffic to
navigate through construction zones.
MNDOT has negotiated with its Contractor for a Lump Sum Credit to their Contract for construction
staging and traffic control allowances during the construction of the HWY 52 corridor. The Department
of Public Works has negotiated with MNDOT for a pro rated share of this credit for impacts to City
streets used as detours and alternate routes.
MNDOT has provided a $60,000.00 credit to the City of Rochester's Municipal Cost Share Agreement
be established, as compensation in full for the use of City Streets as detours and alternate routes during
HWY 52 construction. By accepting the credit of $60,000.00 from MNDOT, the City releases the State
from of any obligation for the restoration of City Streets used as detours or alternate routes during ROC
52 construction.
COUNCIL ACTION REQUESTED:
Adopt a resolution accepting a credit of $60,000.00 from MNDOT as part of the MNDOT ! City of
Rochester Cost Share Agreement; releasing MNDOT of any and all obligation for the restoration of City
Streets used as detours and alternate routes during ROC 52 construction. Project # 9408 (J2247)
COUNCIL ACTION: Motion by Second by to:
REQUEST FOR COUNCIL ACTION MEETING 5<
DATE: 12/18/06
GENDA SECTION:
ORIGINATING DEPT:
ITEM NO.
CONSENT AGENDA
Public Works
kz)— DA
ITEM DESCRIPTION: Release of Resposibilty I Haul Roads Project #9408 (J2247)
PRF�PARED BY:
T.H. 14 / 52 Design Build
( M. Easley )>t'
During the Course of the construction of the Highway 52 Corridor, through Rochester, certain City
streets were utilized for the delivery and staging of materials for Hwy 52 construction activities. The use
of City Streets for construction related activities were monitored by the City Department of Public Works
and were discussed with MNDOT and its contractor, Zumbro River Constuctors (ZRC), the full duration
of the project. ZRC did when called upon, provide for the minor maintenance and repair of City streets
that may have been impacted by their use as haul roads and maintained them for safe and convenient
use by the Public.
In a meeting on April 4, 2006 between MNDOT Staff, ZRC and City Staff it was agreed that ZRC had
fulfilled their obligation for the maintenance and repair of City streets used as haul roads, with the
exception of: The East Frontage Road of HWY 52 from Memorial Parkway to 11th St. S.W. and again on
22"d St N.W. from Elton Hills Drive to 17th Avenue N.W. ZRC committed at that time to provide for full
roadway restoration of these two remaining roadways. ZRC has since provided for bituminous overlays
for the full width of the roadways, on the East Frontage Road and 22nd St. N.W. fulfilling that obligation.
As a condition of the ROC 52 project closeout the Minnesota Department of Transportation has
requested ZRC to provide for a release of responsibility for further maintenance and repair of City
Streets used as Haul Roads in the prosecution of HWY 52 Construction. The Department of Public
Works concurs that ZRC has met its obligation for the care and maintenance of City Streets impacted
by their construction related activities.
COUNCIL ACTION REQUESTED:
Adopt a resolution releasing Zumbro River Constructors, from any and all obligation for further
maintenance and repair of City Streets used as Haul Roads in conjunction with the ROC 52 project.
COUNCIL ACTION: Motion by: second by: to:
,GENDA SECTION:
CONSENT AGENDA
REQUEST FOR COUNCIL ACTION MEETING
DATE: 12/18/06
ORIGINATING DEPT: ITEM NO.
Public Works A--� _a
ITEM DESCRIPTION: Pedestrian Facilities Agreements — Thomas G. Davis Property PREPARED BY:
(for M&B#06-15) Mark Baker
Pj U
Staff would offer the following Pedestrian Facility Agreement for consideration by the Council:
Thomas G. Davis is the Owner of real property described as Lots 2, Block 2, Willshire
Estates Addition, Olmsted County, Minnesota. As a condition of approval for a Metes &
Bounds Subdivision (M&B#06-15), the Owner has requested approval of a Pedestrian
Facilities Agreement to address his obligations for providing pedestrian facilities along the
frontage of the Property abutting Willshire Dr NE. Staff agrees that execution of said
Agreement is to the mutual benefit of the Owner and City, and abutting Property Owners. An
Agreement has been drafted by the City and executed by the Owner.
COUNCIL ACTION REQUESTED:
Adopt a Resolution authorizing the Mayor and City Clerk to execute a Pedestrian Facilities Agreement
with Thomas G. Davis, for Lot 2, Block 2, Willshire Estates Addition, Olmsted County, Minnesota.
COUNCIL ACTION: Motion by Second by: to:
rar
REQUEST FOR COUNCIL ACTION MEETING 7 f
DATE: 12/18/06
,GENDA SECTION: ORIGINATING DEPT: ITEM NO.
CONSENT AGENDA Public Works b-
ITEM DESCRIPTION: Pedestrian Facilities Agreements — Christopher J. McLeod & Heidi PREPARED BY:
M. McLeod Property (for M&B#06-15) .Mark Baker -
Staff would offer the following Pedestrian Facility Agreement for consideration by the Council:
Christopher J. McLeod & Heidi M. McLeod are the Owners of real property described as Lots
1 & 2, Block 1, Willshire Estates Fifth Subdivision, Olmsted County, Minnesota. As a
condition of approval for a Metes & Bounds Subdivision (M&B#06-15), the Owners have
requested approval of a Pedestrian Facilities Agreement to address their obligations for
providing pedestrian facilities along the frontage of the Property abutting Willshire Dr NE.
Staff agrees that execution of said Agreement is to the mutual benefit of the Owners and
City, and abutting Property Owners. An Agreement has been drafted by the City and
executed by the Owners.
COUNCIL ACTION REQUESTED:
Adopt a Resolution authorizing the Mayor and City Clerk to execute a Pedestrian Facilities Agreement
with Christopher J. McLeod & Heidi M. McLeod, for Lots 1 & 2, Block 1, Willshire Estates Fifth
Subdivision. Olmsted County. Minnesota.
COUNCIL ACTION: motion by: Second by to:
REQUEST FOR COUNCIL ACTION MEETING
DATE: 12/T8/06
tGENDA SECTION:
ORIGINATING DEPT:
Public Works
ITEM NO.
b .aZ4
CONSENT AGENDA
I
ITEM DESCRIPTION: Revocable Permit: Mayo Clinic Rochester —Awning within 2n,PRFPARED
BY:
Street SW Right of Way adjacent to 201 Building.
M. Nigbur
Mayo Clinic Rochester (Mayo) has requested a Revocable Permit for the installation of an awning on the 201
Building that will extend into the right of way of 2nd Street SW. (Lots 5, 6 and 7, Block 18, Original Plat to the City of
Rochester).
The awning will be placed a minimum of 9 feet above sidewalk elevation adjacent to the building on the subject
property and will extend 2 feet into the public right of way of the south side of 2nd Street SW adjacent to the subject
property.
Mayo will be responsible for the installation of the awning. Mayo shall bear the cost to install, maintain and repair of
the awning.
Staff has reviewed the request and would recommend in favor of granting a Revocable Permit. Mayo has executed a
Revocable Permit which includes the standard language for revocation and liability protection for the City.
K
�tah_F.k.
{
I dd
COUNCIL ACTION REQUESTED:
Authorize the Mayor and City Clerk to execute the Revocable Permit with Mayo Clinic Rochester to allow the
installation of an awning within the right of way of 2nd Street SW adjacent to the 201 Building located on Lots 5, 6 and
7, Block 18, Original Plat to the City of Rochester.
COUNCIL ACTION: Motion by: second by: to:
4GENDA SECTION:
ITEM DESCRIPTION:
AGENDA
REQUEST FOR COUNCIL ACTION MEETING
DATE: 121Tf3/06
ORIGINATING DEPT:
— Lots 12 & 13, Block 1,
Subdivision — Gentling Properties
Public Works
Vorthern Heights
ITEM NO. ^ _:1-5
PREPARED BY:
Gentling Properties, the Owner of the property described as Lots 12 & 13, Block 1, Northern Heights
Subdivision, has requested the City issue a revocable permit for the placement of storm sewer under the
sidewalk and boulevard within the right of way of North Broadway adjacent to the Owner's property. The
intention of the storm sewer is to prevent storm water from draining over the sidewalk.
The revocable permit also includes existing business signage, landscaping and a retaining wall. These
improvements were originally installed outside of the subject right of way. As the State of Minnesota has
expanded the right of way of North Broadway (T.H. 63), the improvements became located within the
subject right of way.
Owner will install and maintain the storm water and the existing improvements at their own expense. The
improvements are shown on the exhibit.
Staff has reviewed the request and would recommend in favor of granting a Revocable Permit. The
Owner has executed a Revocable Permit which includes the standard language for revocation and liability
protection for the City. This Permit is subject to receipt of MnDot permit for use of the right of way.
LEGEND
f
GENTLING DENTAL CARE
SITE AND GRADING PLAN
LOTS 12 AND 13. BLOCK 1
NORTHERN HEIGHTS
ROCHESTER MN
• � 1
$,�'AFAMI
SITE AND GRADING PLAN
LAND SL'P.1'£Yfh"G t ENCENL£P.lNG •o: zurG anoo� i r
;A i�0%.a vA%T wmW HO12lKRV EX W
,mw.xa 4tr Wt,.em GP.ILBTER Ntl I Iral�
COUNCIL ACTION REQUESTED:
Authorize the Mayor and City Clerk to execute the revocable permit with Gentling Properties to allow the
placement of storm sewer in the right of way of North Broadway adjacent to the property, and to keep the
existing business signage, landscaping and retaining wall within the subject right of way. This Permit is
subject to receipt of MnDot Permit for use of the right of way.
COUNCIL ACTION: Motion by: Second by to:
REQUEST FOR COUNCIL ACTION
MEETING 12-18-06�
DATE : l
AGENDA
CONSENT AGENDA
ORIGINATING DEPT:
PUBLIC WORKS
ITEM NO.
t) •Z4
EM ROCHESTER CITY LINES CONTRACT FOR 2007
PREPARED BY:
A KNAUER
This is a recommendation to approve the 2007 operations contract with Rochester City Lines.
This contract provides funding for the regular route deficit. The contract maximum is $2,078,739
based on the estimated deficit defined as expenses less revenues collected by the company. This
does not include cash farebox revenues which are counted underthe City's banking services. (The
projected operating deficit for 2007 with cash fares included would be $1,952,740. This compares
to a company operating deficit of $1,753,024 budgeted for 2006.) Approximately 40% of costs are
recovered through program revenues. The contract does not include expansion. The contract may
be amended later in 2007 to allow for expansion subject to the State's allocation of funds from the
recently approved constitutional amendment dedicating a portion of motor vehicle excise tax to
public transit. The contract provides increases for wages, lease and operation of Rochester City
Lines' terminal and a significant increase in fuel costs. The contract provides reimbursement for
actual expenses less revenues collected. Some expenses are allocated based on hours or miles
of operations.
The contract is subject to the City receiving State and federal funds and subject to an annual audit.
The contract runs from 1/1/2007 through 12/31/2007.
REQUESTED COUNCIL ACTION
Adopt the prepared resolution approving the following contract the 2007 contract with
Rochester City Lines in the maximum amount of $2,078,739.
OUNCIL ACTION: Motion by: Second by: to:
ENDA
REQUEST FOR COUNCIL ACTION
ENT AGENDA
ORIGINATING DEPT:
PUBLIC WORKS
MEETING -
DATE:
ITEM NO.
T)'
ITEM AGREEMENT FOR PARK & RIDE LOT/ BETHEL LUTHERAN I A PREPARED
AUER �C .
I CHURCH
This is a recommendation to renew an agreement with Bethel Lutheran Church at 810 3`d Avenue
SE to use their west parking lot for the period 1/1/2007 through 12/31/2007 for a park and ride
facility.
Under the agreement Bethel provides up to 97 spaces for persons to park and ride the City bus
into the downtown. The Lease is based on set amount of $900.00 per month. The spaces are
available Monday through Friday, 6:00 a.m. until 6:00 p.m. Bethel provides for all lot maintenance
including snow removal. The agreement can be terminated by either party with 30 days notice.
REQUESTED COUNCIL ACTION
Adopt the prepared resolution approving an agreement with Bethel Lutheran to establish a
park and ride during 2007 in the 800 block of 3rd Avenue SE.
COUNCIL ACTION: Motion by: Second by: to:
REQUEST FOR COUNCIL ACTION
HEARINGS
ADMINISTRATION
ITEM DESCRIPTION:
ADOPTION OF 2007 TAX LEVY, 2007 BUDGET, AND 2007-2012 CIP
q (^
MEETING W
DATE: 12/18/06
S. KVENVOLD
The City Council held its required Truth -in -Taxation Hearing on Monday, December 11,
2006. Truth -in -Taxation laws require that the final property tax levy and budget be
adopted at a "subsequent public hearing".
A summary of the effect of the changes and adjustments approved by the Council
during review of the proposed budget has been prepared by the Finance Department
and is attached. The recommended tax levy is $37,438,500 and the final budget is
$151,192,721. The net change to the Proposed 2007 Budget is a decrease of
$1, 946,500.
The recommended tax levy is $61,500 less than the preliminary tax levy used
to calculate Truth in Taxation notices recently sent to property owners, and in the
Proposed 2007 Budget.
G�COUNCIL ACTION REQUESTED:
Approve resolutions to adopt the 2007 Property Tax Levy of $37,438,500, the 2007
Total Budget of $151,192,721, and the 2007-2012 Capital Improvement Program.
COUNCIL ACTION: Motion by second
Al
2007 Mop BudgM RC .d
AP
ol
o0
oe
o0
000
0
0
0
00
0
N
_
N
O O
O
O O
O O O
O
O O
O
m
N
0 0
M b
m
O O
O O M
O
O
0 0
M
r
O
W
O O
A A
M M
O O A
O
O
W W
R t
N b e
C
T
N
Orp
li
h
�
w
w w
o
eei
oe
o00
0
0
0
00
0
oM
0
0
0 0
0 0 0
0 0
0
0 0
0
0 o
M 1n
oo M
oo
M
bM
mo
00
�-r
ooN
W of
m
ao m+o
J
Wi
N N
M M M
M a
w
w
wN
o0
00
00
of
D
o
e
oei
o
e
_
00
00
00
000
0
0
00
0
0
O m
0 0
M M
0 C
O O M
O
O
0 0
b
M
00
A A
NYl
OOA
O
O
W W
N
m
C
N N
....
-
A r
M M N
W
Oe
at
97t
'
E U
...
...
w
w
DD
o
o
0
m
N
!V
N
N!
Q
Q
Q
N
C
OR
CD
W
DD
O
O
O
O
U
W
QQ
T
R
a
Q
Q
Q
Q
Q
Ia
0
N
ID
Q
ID
O
�
m
to
«
C
L
c
G
to
0
R
m
,D
m
0
'
i0
m
c
O
fC
m
0
-0
n
D
91
to
io
m
O
9m
mm
O
m
`
u
m
m
C
c
o
m
a
O
$
m
m
c
R
V
of
Ci
�
c
E
C
a�
c
=
N
m
m
m
=
c
c
R
E
E
E
o
u
° r
c R
a
o
n a
w
0
E
R
m
0
�i
9
s
17
O O O O O
00 o voice
b l0m b V Ww
M lAf CA9 M
w wM w wl 6
cm
E
0
C T
E J
m
A
C
m
O
O
� N
E
m
m o
L
m m c
A N
o E
O W
m
N 0(Lj
0
N B'O
° s,
m
.Q
a° 0
c E
a V
m
d a a
E E
S«
«
1-G 0
` V O
f �°-
N
rrd
dKQ
em
A
i
REQUEST FOR COUNCIL ACTION
MEETING /
DATE: 12/18/06 I
iblic Hearing
ORIGINATING DEPT: ITEM NO.
City Attorney's Office I F-2�
ITEM DESCRIPTION: Appeal of "potentially dangerous" designation for the dog owned by
Olga Bondar and Alexey Leontovich living at 2901 Bambi Court SW, Rochester, MN.
The Animal Control Review Panel met on October 25, 2006, and following a hearing determined that the
dog, "Taz", owned by Olga Bondar and Alexey Leontovich is declared "potentially dangerous' under the
provisions of RCO section 106A.18. Olga Bondar has appealed that designation and a full hearing before
the City Council is required.
RCO Section 106A.18, subd. 1(b) defines a potentially dangerous dog as follows:
(b) "Potentially dangerous dog" means any dog that:
(1) when unprovoked, inflicts bites on a human or domestic animal on public or
private property; or
(2) when unprovoked, chases or approaches a person upon the streets, sidewalks
or any public or private property, other than the dog owner's property, in an apparent attitude
of attack; or
(3) has a known propensity, tendency or disposition to attack without provocation
causing injury or otherwise threatening the safety or humans or other domestic animals.
Included with this RCA are the "Findings of Fact, Conclusions of Law, and Order" approved by the Animal
ontrol Review Panel, the August 7, 2006 police reports related to the dog bite incident giving rise to this
„earing, and the objection and appeal filed by Olga Bondar.
COUNCIL ACTION REQUESTED: Following the hearing the council may either affirm or reverse the
Animal Control Review Panel's order designating the dog, Taz", as a potentially dangerous dog. The
council may adopt the Panel's findings, state its own findings, or direct the City Attorney's office to draft new
findings consistent with the order it intends to make. Notice of this hearing was provided to the dog owner
and interested neighbors.
c &44 -I-
,t r
COUNCIL ACTION: Motion by: second by: to:
Arr
BEFORE THE ANIMAL CONTROL REVIEW PANEL
CITY OF ROCHESTER, MINNESOTA
In Re: Dog Owned by Alexey Leontovich
and Olga Bondar
Findings of Fact,
Conclusions of Law,
and Order
On October 25, 2006, the Animal Control Review Panel (hereinafter the "Panel') held a
hearing to consider whether the dog owned by Alexey Leontovich and Olga Bondar should be
declared potentially dangerous pursuant to Minn. Stat. Ch. 347 and RCO Ch. 106A; notice of the
hearing was sent to Mr. Leontovich and Ms. Bondar and to others affected by the August 7, 2006
dog bite incident. The Panel consisted of Council President, Dennis Hanson and Dr. Mark Wenner;
Council Member Amy Blenker was absent. The notice of intent to declare dog as dangerous, letter
of appeal, and police report are attached hereto as Exhibit "A" and are made part of the record of
these proceedings. Additionally, Stacey Edwards, the owner of the dog that was bitten, introduced
photographs of the injury to her dog along with the veterinarian bill; copies of the photos and bill
are attached hereto as Exhibit "B" and are made part of the record of these proceedings. Ms.
Bondar introduced a certificate of vaccination and letters from workers who were working at her
home who described the demeanor of her dog; copies of the certificate and letters are attached
hereto as Exhibit "C" and are made part of the record of these proceedings.
At the hearing, the dog involved in the August 7, 2006 incident was identified to be a four-
year -old American Staffordshire Terrier, named Taz, that was sheltered at Ms. Bondar and Mr.
i
-13
Leontovich's home located at 2901 Bambi Court SW, Rochester, MN 55902.
Ms. Bondar testified that she and her husband had just moved to the house. On August 7a',
they had workers working at the house. She said that the front door was not locked and that Taz
saw another dog running. Her impression was that Taz thought the other dog was running to Taz's
yard. She also speculated that because this was a new house to Taz, that Taz was still trying to
figure out the boundaries and probably thought that his boundary extended into the street. She said
Taz ran out of the house, onto the street, and attacked the other dog. She said that the dog fight
occurred on the Street. Ms. Bondar also testified that Taz plays with the neighbor's dog and that
this was not characteristic of Taz. Ms. Bondar submitted the veterinarian's report and letters from
some workers that had worked at the house and opined that Taz was friendly when they worked
there.
Stacey Edwards testified that she was out running the morning of August 7, 2006 with her.
four -year -old Labrador Retriever, Tess. Ms. Edwards said she ran to the end of the cul-de-sac and
turned to run back down it. Ms. Bondar's home is at the end of the cul-de-sac. Ms. Edwards said
that after she and Tess turned and started to run back down the street, she heard a dog running
behind her and she tamed to look. She saw Taz running and fixated on Tess. She then saw Taz
attack Tess from behind. She stated that she was scared and too afraid to reach down with her
hands to separate the dogs. She tried to kick Taz off of Tess and when she did that the dogs
knocked into her and she fell to the ground. She was not bitten but sustained some scraps from the
fall. At that time, Ms. Bondar came out of the house and pulled Taz off of Tess. As a result, Tess
sustained bite marks to her rear, as seen on photographs, and Ms. Edwards showed a veterinarian
2
-"\k
bill of $190.14 before taxes related to the bite incident.
Ms. Edwards stated that this was the second encounter she and Tess had with Taz. The first
one occurred not too far before the August 7, 2006 incident. In the first encounter, Ms. Edwards
said she and Tess were running and Taz ran down the cul-de-sac to the intersection. When Taz ran
up to Tess, Taz leaned up against Tess and growled at Tess. Ms. Edwards said that she did not
know where Taz lived and that Taz did not have a collar on and that no owner was around. Ms.
Edwards said she just pulled Tess's leash and continued on her run.
At this point, Council President, Dennis Hanson commented that he thought Taz had been
before the Panel before and Dr. Wenner agreed. Assistant City Attorney Richard Wright had the
prior file brought up (D2002-042/0254133) and Council President Hanson and Dr. Wenner
refreshed there recollections and recalled that the first case also dealt with aggression toward
another dog. It should be noted that in that case, Taz was found to NOT be potentially dangerous.
FINDINGS OF FACT
1. At the October 25, 2006 hearing the Panel considered the issue of whether Mr.
Leontovich and Ms. Bondar's dog should be declared potentially dangerous.
2. RCO § 106A.18, Subd. i (b) defines a potentially dangerous dog as follows:
(b) "Potentially dangerous dog" means any dog that:
(1) when unprovoked, inflicts bites on a human or domestic animal on
public or private property; or
(2) when unprovoked, chases or approaches a person upon the streets,
sidewalks or any public or private property, other than the dog owner's
property, in an apparent attitude of attack; or
(3) has a known propensity, tendency or disposition to attack without
provocation causing injury or otherwise threatening the safety or humans or
other domestic animals.
I
3. At the October 25, 2006, hearing, the Panel noted that this was the second time that
Taz was before the Panel for dog aggression.
4. The Panel also noted that in the first incident with Tess that Taz was displaying dog
aggression when he ran up to Tess, leaned up against Tess, and growled at Tess.
5. The Panel noted that in the August 7, 2006 incident that Taz ran off his property,
chased down Tess, and attacked Tess from the rear, inflicting damage. The Panel noted that when a
dog is running with her owner (like Tess was in this case), it is not considered to be provoking
another dog to attack it.
6. It is the proponent's burden to establish by a preponderance of the evidence that Mr.
Leontovich and Ms. Bondar's dog is dangerous or potentially dangerous pursuant to the definition
provided above and in RCO 106A.18, Subd. I (b).
7. The uncontradicted evidence is that Mr. Leontovich and Ms. Bondar's dog, Taz,
engaged in an unprovoked attack.
CONCLUSIONS OF LAW
1. This matter is properly before the Panel pursuant to §I06A.18, Subd. 3(c).
2. The Panel concludes, on the basis of the evidence presented, that the Mr.
Leontovich and Ms. Bondar's dog has engaged in conduct that meets the following criteria:
(a) when unprovoked, inflicts bites on a human or domestic animal on public or
private property;
3. Based upon the testimony received at the public hearing, the Panel concludes that
Mr. Leontovich and Ms. Bondar's dog, Taz, has engaged in conduct justifying Taz's declaration as
a potentially dangerous dog.
4
)�k
The Animal Control Review Panel of the City of Rochester, pursuant to RCO §106A.18,
does hereby determine that Mr. Leontovich and Ms. Bondar's dog, Taz, is a potentially dangerous
dog. Asa result Taz is subject to the mandatory provisions of RCO §106A.18, a copy of which is
attached hereto as Exhibit D.
Pursuant to RCO §106A.18, Subd. 3(e) (see Exhibit D), Mr. Leontovich and Ms. Bondar
may appeal this decision by filing a written appeal with the City Clerk within 17 days of today's
date.
r�
Dated at Rochester, Minnesota this �. day of October 2006.
5
�d 42�
DENMS HANSON
President of the Rochester City Council
11",2G 424-03
EVENT REPORT
® Rochester Police Department
❑ Olmsted County Sheriffs Office
and
Victim
SuhSubmittedto Records: ICR -
❑ Film: Number of Rolls
❑ Cassette Tapes: # of Tapes
❑ Digital Photos Downloaded: # of Photos sewed by:
❑ Digital Recording Downloaded: 9 of recordings _ /
❑ Incident Recorded on Squad Car Videotape Squad Car # _ % /
Karin
AKA
TO
Edwards
E]T1
Black
11-1-60 ❑ Juvenile
27D9 Briar Ct. SW. Rochester MN Phone 285-6531
Business
or,..
Complainant First Middle Last
Name Mark Godbout ACO DOB ❑Adult
❑ Juvenile
Male White Asian
DL No. AKA ❑ Female fl Black r-1
Business Rochester Police Animal Control
Phone 287-2330
Witness First
Name
Middle
Last
DOB
❑ Adult
❑ Juvenile
DL No.
Residence
AKA
FJnail
El Male
❑ Female
El White ❑ Asian
El Black ❑
Phone
Business
Phone
Code* Property of Value
Value
" Indicate one or more: L = Lost S = Stolen; R = Recovered: D = Dama ed
Total:
li
Suspect First
Name Olga
Middle
Last
Bonder
DOB 2.15-55
®Aduft
❑Juvenile
DL No. H-418-059-297-313
AKA
Male
® Female
® White Asian
rl Black Cl
2901 Bambi Ct. SW. Rochester MN Phone 289-2452
Business
Phone
Description Height Weight Hair Eyes Glasses Type Facial Hair Type Weapon Type
-
Description:
LJ Alcohol ❑Drugs
School
Where Held?
Ticket #
# 193818
Vehicle
❑ Suspect ❑ victim ❑ Impound
License Plate:
State: Make:
Year.
- Model: Color.
Initial Investigating Officer(s): M. Godbout ACO 2611
❑ Patrol Follow-up-
❑ Patrol Sin off
Inv Unit
Assigned:
Follow-up Invests ator(s):
❑ Open/Inactive
❑ Closed/Arrest
171010sed/Exceptional
❑closed/Unfounded ❑ Non -Criminal
Copy to: ❑ County
Attorney ❑ City
Attorney ❑ Other' —
❑Victim Notification Sent
upplemenfal Report
Officer:
Mark Godbout ACO badge 2611
PRELEVDINARY IIvTFORMATION
Film: Number of Rolls ICR # 106 - 58833
Cassette Tapes: # of Tapes _
Digital Photos Downloaded: # of Photos
Digital Recordings Downloaded: # of recordings _
Incident Recorded on Sauad Vdeotaoe: Souad #
This writer Mark Godbout ACO 2611 received a call from Stacie Edwards regarding a dog attack to her
and her yellow lab.
OBSERVATION / ACTION'S / OBSERVATION'S
• I spoke with Edwards and she informed me that while doing her morning rum with her dog a (yellow
lab), a dog came out of the front door at 2901 Bambi Ct. SW.
• The dog from 2901 Bambi Ct attacked her dog and went after Edwards trying to break up the two
animals.
• The dog owner at 2901 Bambi Ct is Olga Bondar she regained control of her animal and apologizes.
• Edwards informed me that she took her dog to the vet were her dog had several stitches in several
different places.
• The dog owner at 2901 Bambi Ct was informed by me that the dog must do a ten-day quarantine and I
Will report the health of the dog to Edwards on (8-17-06).
• I called city hall to see if the animal was licensed to any one at 2901 Bambi Ct. SW. and no one had it
licensed wa h the city.
•. Olga Bondar is Alexei Leontovich fianc6e and he would not be back from Russia until Sept. sometime:
• Informed Bondar that tickets for dog at large and unlicensed dog will be mail to the residence.
• I also informed them that a letter to declare there dog dangerous will be mail to them.
VICTIM'S STATEMENT
Stacie Karin Edwards, DOB 11-1-60 lives at 2709 Briar Ct. SW, Rochester MN, phone # 285-6531.
Edwards informed me that while running on 8-7-06 a dog came from 2901 Bambi Ct.
Edwards did inform me that Bondar came over and paid the current vet bill she had occurred from the
dog attack.
SUSPECT'S STATEMENT
Olga Bondar, DOB 2-15-55 lives at 2901 Bambi Ct. SW. Rochester MN, phone # 289-2452.
The residence was informed about the ten-day quarantine and the letter to declare there dog dangerous.
They also informed about the tickets that will be mailed to them.
DISPOSITION
• I will mail tickets to Bondar for violating City of Rochester ordinance (106A.08 Subd/1) dog at large
and (106A.05 Subd.1) harboring unlicensed dog with in the city limits.
• I will do a ten-day follow-up on the health on 8-17-06 and report back the health of the dog to Edwards.
• I will mail a letter of intent to declare Bondar's dog dangerous.
• No further action at this time.
Mark Godbout ACO 2611
Copy to Inves
Revised
to
CITY C ERKS () FACE
2M6 NOV 22 AM 10: 16
ROCHESTER. MINN.
Date: 11.22.2006
City Attorney
201 4'b St SE, Room 247
Rochester, MN 55904-3780
To Whom It May Concern:
Olga Bondar
2901 Bambi Cr. SW
Rochester, MN 55902
Tel: 507-289-2452 (h)
507-538-1653(w)
I wish to appeal the decision of Animal Control Review Panel (case ICR# 06058833)
concerning my dog Taz.
Sincerely
Oga�
Olga Bon_::--
ar
REQUEST FOR COUNCIL ACTION
MEETING
DATE: 12-18-06
AGENDA SECTION: ORIGINATING DEPT: ITE. `
PUBLIC HEARINGS PLANNING `. J!
ITEM DESCRIPTION: Amendment to GDP #219 by RMN Land Development, LLC to be known PREPARED BY.
as Spring Brook Valley. The plan includes 109.35 acres of land located west of TH 63 and north John Harford,
of the Fleet Farm Store and south of the Southtown 2ntl and Southtown Heights subdivisions. Senior Planner
December 13, 2006
City Planning and Zoning Commission Recommendation:
The City Planning and Zoning Commission held a public hearing on October 28, continued to November 8 and December 13,
2006, to consider this petition. The CPZC voted 8-0 to approve the GDP subject to the following conditions/modifications:
1. There are inadequate on and off site public facilities to accommodate development of the Property,
Including Sanitary Sewer, Water, Public Roadways, and Storm Water Management Facilities. No
development will be allowed to occur until the City Council has determined that all required public
facilities are adequate for said development. Alternatively, the developer may request to join with
the City in making these inadequate public facilities adequate for this development, and may enter
into a development agreement, prior to Final Plat submittal, that outlines the developer's and City's
obligations related, but not limited to: access, stormwater management (including any obligations
for oft -site facilities), transportation improvements (including any off -site improvements necessary
to accommodate this development), pedestrian facilities, contributions for existing & future public
infrastructure, and the extension of public utilities to abutting properties where applicable.
2. Grading & Drainage Plan approval is required prior to Final Plat submittal. The location and
designation of the "Detention Facilities" indicated on the GDP should be viewed as conceptual until
formally reviewed and approved through the Grading & Drainage Plan review process. A regional
stormwater management facility will be required within this GDP site. The concept of several small
detention ponds along the wet/and(stream may be permitted as an aesthetic feature, but may not fulfill
the Owner's obligations for providing Stormwater Management
3. Execution of a City -Owner Contract, and dedication of any applicable off -site public easements is
required prior to construction of any public infrastructure to serve each phase of this development.
4. Pedestrian facilities are required at the Owner's expense along both sides of am new public roads
within this development, and along the entire frontage of the Property abutting the west frontage
road. In addition, a pedestrian trail shall be extended at the Owner's expense through the sanitary
sewer corridor to the west property line Specific obligations will be addressed In the Development
Agreement. The developer/owner shall also provide pedestrian facilities between the northern
extent of Willow Ridge Drive through Spring Brook Valley to the public road system within the
development.
5. Controlled access dedication requirements, and individual lot access to the frontage road will be
determined in the Development Agreement Access to Commercial Drive, the frontage road, from
the commercial lot shall have a separation distance of at least 225 feet.
6. Specific routing of utilities will be addressed through the platting process and plan review. At the
time of development, water main extension and looping of systems must be complefed per the
requirements of RPU Water Division.
ACTION:
Motion By:
Seconded By:
Action:
Page 2"Q'
RCA
December 14, 2006
7. The private road from Willow Ridge Dr SW to this property is proposed for two way traffic. If this connect
is approved as a private two way road, the Owner will be required through the Development Agreement
process to dedicate public access rights over the private roadway to allow traffic flow between the proposed
and existing development.
8. Development will need to be phased to limit the number of trips to <1,200 prior to construction of a second
access. Phasing shall be such that access to Willow Ridge Drive SW occurs when the development will exceed
the 1,200 trip threshold and not before based on plats or Plan approval.
9. Prior to final plat submittal, the applicant shall enter into a Development Agreement with the City that outlines
the obligations of the developer/owner relating to Ownership and Maintenance of the Wetland and Open Space
Areas, in addition to those items listed in condition V.
10. This proposed development will have a parkland dedication requirement of approximately 10 acres. A
minimum of 3.5 acres of the dedication should be in the form of land. The GDP indicates a 3.5 acre public
park which will meet the development's land dedication. The balance of the dedication can be in the form of
cash in lie of land.
11. The developer must provide a 35-foot wide buffer (no build zone) along the north and south sides of the
i property adjacent to the existing residential developments. (Required in the previous GDP approval by the
City Council.)
12. The development is limited to one-story detached dwellings along the north side of the development
q adjacent to the Southtown Heights and on the south side, south of the private street, adjacent to Willow
Heights. The density of development is limited to a maximum of 5.5 units per acre within these two areas.
�(Required in the previous GDP approval by the City Council.)
� i.,wi
Council Action Needed:
if the Council wishes to proceed with this application, the Council should instruct the City Attorney to
prepare a resolution, with findings, for Council approval.
Planning Staff Recommendation:
See attached staff report.
Attachments:
1. Staff report and attachments dated November 30, 2006
2. Draft City Planning and Zoning Commission minutes of December 13, 2006
Distribution:
1. City Administrator
2. City Attorney
3. Planning Department File
4. Applicant: This ftem will be considered sometime after 7:00 p.m. on Monday December 18, 2006, in the Council/Board
Chambers at the Government Center, 151 4th Street SE.
ROCHESTER-OLMSTED PLANNING DEPARTMENT
2122 Campus Drive SE, Suite 100 • Rochester, MN 55904-4744
COYXT'I OF www.olmstedcounty.com/planning
TO: City Planning and Zoning Commiss'on
FROM: John Harford, Senior Planner '•
1
DATE. October 9, 2006; Revised Novemb r 30, 2006
RE: Amendment to GDP #219 by RMN Land Development, LLC to be
known as Spring Brook Valley. The plan includes 109.35 acres of
land located west of TH 63 and north of the Fleet Farm Store and
south of the Southtown 2nd and Southtown Heights subdivisions.
NOTE: The applicant submitted additional information regarding the property and related
Decorah Edge information on November 3, 7, and 8, 2006 the date of the CPZC meeting. The
CPZC continued the hearing to December 13, 2006 to allow for staff review of the new data.
Portions of the staff review and findings have been amended to reflect the revised GDP.
Piannina Department Review.,
Petitioner: RMN Land Development
6601 Weston Parkway, Suite 240
West Des Moines, Iowa 50266
kk
Property Owner: RMN Land Development
6601 Weston Parkway, Suite 240
West Des Moines, Iowa 50266
Consultant: McGhie & Betts, Inc.
1648 Third Ave. SE
Rochester, MN 55904
Location of The property is located west of TH 63 S Frontage Road, northwest of the
Property: Fleet Farm store, north of 36th St. SW and east of the Greystone
development.
Proposed Use: This Plan includes approximately 109.35 acres of land. A larger portion
of the western 1/3 of the site, in the west and northwest, is proposed to
remain undeveloped. Wetlands, including a calcareous fen, have been
delineated in this area; some are planned to be avoided and other
impacted. Also, there is planned public park in the northeast comer of
the residential portion of the property.
About 3/4 of the site is proposed to be developed with a mix of low density
residential dwellings. The eastern 17 acres of the site is zoned B-4
(General Commercial) and is proposed to be developed with commercial
land uses. The commercial area is designated as Phase I of the
development. The residential portion of the project has no phasing plan.
BUILDING CODE 5071285-8345 • GISIADDRESSINGMAPPING 507/285-8232 • HOUSING/HRA 5071285-8224
�.,�. PLANNING/ZONING 507/285-8232 - WELLJSEPTIC 507/285-8345
FAX 5072
zr� --' ' ----- ......
Page 2
General Development Plan 4219 Spring Brook Valley
December 7, 2006
Land Use Plan Except for the easterly area designated "G", the commercial area, the
And Zoning Rochester Urban Service Area Land Use Plan designates this property
Designations: as suitable for "Low -Density Residential" uses and the property is
currently zoned R-1 x (Mixed Single Family Extra) district.
Area "G" includes approximately 17 acres along the TH 63 Frontage
Road that is shown on the Land Use Plan for "Commercial" uses and is
currently zoned B-4 (General Commercial).
Transportation The plan proposes both public and private roadways within the
and Streets: development. Primary access is shown at the west frontage road,
Commercial Drive, SW, using a circular internal street pattern labeled as
Sedge Meadow Court, SW. The frontage road is in the process of being
reconstructed to 4e St., SW with completion likely this year.
Commercial Drive is designated as a Primary Urban Collector.
A second access to the residential area is proposed at the north end of
Willow Ridge Drive. This access is proposed to accommodate two way
traffic on a 28' wide private street, which would connect to the internal
public street system within the project.
A single access, and the only portion of this site that will not utilize the
frontage road for access to the city street system, is to the south and is
proposed at the north end of 7'' Ave. SW. The extension of this road is
proposed to be a private street serving a limited area of the development
consisting of 24 single family lots. In the previous review the
Transportation Planner indicated that there may be an increase of 500-
550 trips per day, for a total ADT of 1560 on Willow Ridge Drive based
on a two way private street connection, but with a 20' width. That trip
increase was considered acceptable based on the current design of
Willow Creek Drive south of this project.
Comments provided by Transportation Planning staff indicate that there
must be a minimum spacing requirement of 330' between the southern
edge of the 33 d St right of way and the northern edge of the proposed
Spring Brook Drive right of way. The current alignment does not meet
that design recommendation. Also, any access openings onto
Commercial Drive must be at least 225' apart.
Right-of-way for Enterprise Drive SW is platted to the south property line
of this GDP, but is not proposed to be extended into the property. During
the review of the EAW and GDP the City stated that "Enterprise Drive
need not be connected to the interior public and private street system".
Further, "it is important that Enterprise Drive be retained for future land
use decisions".
An existing right-in/right-out connection to TH 63 is shown on the plans
but outside of the GDP boundaries. The MNDOT has noted that the
direct connection to TH 63 has been closed and no at grade access to
TH 63 will be permitted along Commercial Dr., SW in the future.
REVISED PLAN: The applicant has moved Sedge Meadow Circle
upgradient of the wetland on the south hillside in order to avoid an impact
on the wettand. Sedge Lane S W, the cul-de-sac has been shortened to
Page 3
S
General Development Plan #219 Spring Brook Valley
December 7, 2006
avoid impact to hydric soils within the Decorah Edge. The applicant
proposes to till the 0.04 acre wetland at the intersection of the cul-de-sac
and main loop street and stabilize the stream that flows through the
western N of the property.
Lots and Density: The GDP includes one commercial area of 17.16 acres. Areas D and E
indicate a residential density of 9 units per acre, and area F is designated
for 15 units per acre. Areas A and B, abutting existing single family
dwellings, are designated for single story — detached townhomes:
adjacent to Southtown Heights 3.93 units per acre, abutting Willow
Heights 2n4 4.38 units per acre. Area C is proposed to be developed to a
density of 5.77 units per acre, but are detached townhomes on individual
lots.
Area F will have a total of 214 units. Area E will have a total of 113 units.
Area D will have a total of 57 units. Areas A-C are to be developed as
single story detached townhomes with totals of 24, 19 and 15 units. The
total number of units for the development is 442 residential units.
A 35 feet buffer and access to open space are proposed for the two
detached townhome sections of the development. The 35' buffer was
proposed and approved as part of the previous GDP in 2004. The lots in
Section B against Southtowne 2w subdivision do not appear to meet the
standard in 64.111 requiring lots to be 70% of the width of the adjacent
lots or 1.5 times the required width of 60 feet.
Any residential density proposed above 5.5 units per acre will be required
to be reviewed under either a Type II or Type III process. Separate
review will be required due to the lack of detail in the GDP for the higher
density areas of the plan. (Were the plan of a detail to allow review of a
detailed grading plan and site plans the Type I review process would be
applied rather than the Type II or III review.) The areas of the GDP
affected by this standard are located in Areas D, E, and F.
REVISED PLAN: Area A has not changed and includes 24 units. Area B
has changed due to the requirements of Section 64.111 and has a total
of 16 units. Area C has a total of 15 units. Due to the street realignment
Area D will have a total of 76 units and Area E will have a total of 80
units. Area F will have a total of 225 units. There are a total of 436 units
in the revised GDP which is a reduction of 6 units. The westerly portions
of Lots 1-4, Block 3 are affected by the Decorah Edge requirements, thus
the grading plan will be reviewed to determine if the lots are buildable.
Sidewalks: Pedestrian facilities are required along both sides of all new public
roadways, including the west side of Commercial Drive, the frontage
road. Pedestrian facilities should also be provided between the proposed
Sedge Meadow Court in Spring Brook Valley and Willow Ridge Drive,
SE.
Drainage: This property has steep and rolling terrain and drains to an intermittent
stream that runs from west to east through the site. The Plan proposes a
drainage channel along the stream corridor, as well as two detention
ponds in the northeast comer of the GDP. Also a detention area is
identified along the drainage channel in Section "C".
Page 4
l� General Development Plan #219 Spring Brook Valley
December 7, 2006
A regional stormwater management facility is required within this GDP.
The GDP does not indicate the location or size of the facility. The
applicant will need to work with the City Public Works Department to
determine the design and location of the facility.
Detailed grading and drainage plans will be required and must be
approved prior to final plat submittal or when the property is developed.
Wetlands: Hydric Soils and Wetlands, including a state protected calcareous fen,
exist within this GDP. Wetlands have been identified on the Plan. The
missing wetlands that were delineated are located along the stream
channel.
Calcareous fens are the result of geologic conditions that permit
upwelling of groundwater rich in calcium and magnesium bicarbonates.
Many rare plants are largely restricted to fens, which cover just over
1,000 acres statewide. A Calcareous Fen has been delineated in the
northwest portion of the Site. The Barony Woods development was
required to provide certain stormwater improvements to minimize fen
impact and control stormwater runoff from the development. This
proposal avoids direct impact to the calcareous fen. The applicant will
need to determine if future grading or utility improvements will affect
groundwater flows in the area east of the fen.
The applicant has stated that the easterly two wetlands are not
groundwater supported but surface water induced wetlands. The original
wetland delineation indicated that all four wetlands on the property are
groundwater supported as seeps were observed at each of the four
areas. The applicant will need to address this discrepancy.
REVISED PLAN: The applicant has not disputed the original finding that
the wetlands in Areas D and E are groundwater supported. The
applicant proposes impacts to the wetlands within the channel of the
stream on the property and to the 0.04 acre wetland at the proposed
intersection of the cul-de-sac and loop street.
Decorah Edge: The westerly 2/3 of this property is located within the Decorah Edge. The
site includes Groundwater Supported Wetlands and soils related to the
Decorah identified in the ordinance as the Edge Support Area. The
applicant's general development plan indicates avoidance of impacts on
the two largest wetlands located on the westerly 1/3 of the property. The
three other wetlands on the site appear to be partially or completed
altered under the proposed plan. The easterly portion of the drainage
channel wetland and the bulk of the commercial area are not located
within the Decorah Edge.
The Groundwater Supported Wetlands and Edge Support Areas within
the Decorah Edge may not be °excavated, altered hydrologically, drained
or filled.. " under the ordinance, with exceptions explained in RCO 59.06,
Subd. 4. A Site Capacity Calculation is required for this development but
has not been submitted. The applicant has submitted a Substantial Land
Alteration with the preliminary plat for several locations on the property of
which a number are within the Decorah Edge and affected by the new
ordinance. Section 62.1105 P states that "land alteration is the minimum
amount necessary to develop at the site capacity determined in
Page 5 g, l
General Development Plan #219 Spring Brook Valley ((l1
December 7, 2006
accordance with the residential density from the Site Capacity
Calculation. Subsection Q states that groundwater flows intercepted by
excavation must be reinfiltrated or directed to managed wetlands. The
applicant will need to analyze the areas proposed for the SLA, especially
the areas to be cut to determine if the proposed grades can be amended
to reduce the impact in the Edge Support Areas. The applicant will need
to identify what measures will be employed to reinfiltrate intercepted
groundwater flows or direct them to managed wetlands.
The Site Capacity Calculations must consider Groundwater Supported
Wetlands and the Edge Support Area of the new Decorah Edge
ordinance. Wetlands in the Decorah Edge and Edge Support Areas are
subtracted from the density calculation for the R-1 x district, as they are
Resource Protection Land. The densities for the R-1 x district are 5.5
(Type 1), 8.71 (Type II), and 15 (Type III) units per acre. The overall
density of the site with the proposed 442 units on the 92 acres is 4.8 units
per acre. With 442 units and a Type III process the minimum acreage
not affected by Groundwater Supported Wetlands and Edge Support
Area is 29.5 acres (442/15=29.5). Avoidance of the wetlands allows a
bonus to be applied, depending on the percent avoidance. It appears
that the primary impact of the Decorah Edge ordinance provisions will be
to affect the Substantial Land Alteration and the grading and construction
details of the streets and utility systems. (Note: a separate report from
Jeff Broberg is included that discusses some of the Decorah Edge
factors.)
REVISED PLAN: Of the 109.5 acres, 48.21 acres are designated as
Resource Protection Land leaving a total of 61.29 acres of net buildable
area. With 436 proposed units this development will meet the
requirements of the R-ix district density. Individual sections of the
development will be required to be reviewed under a Type Ill process
given the lack of specific information for Areas D, E, and F. The
applicant proposes wetland impacts to a Groundwater Supported
Wetland and a wetland/stream in the Edge Support Area.
Public Utilities: Several alternatives for water service to the site exist. The lower area
of the property is within the Intermediate Level Water System Area. This
portion of the water system must be looped from the north to the south
systems and must be completed to provide adequate flows for fire
protection to the commercial area. The upper portion of the site is within
the Willow High Level Water System Area, available at the end of 71i
Ave., SW. Builders will need to install pressure -reducing devices as
required by the MN Plumbing Code. Water mains must be looped to
minimize "dead ends" and the mains must be extended to the property
boundaries as required by RPU. The applicant will need to coordinate
with RPU Water Division to determine options and engineering issues.
A trunkmain sanitary sewer dissects this property, which currently serves
the Greystone development as well as development west of 18"' Ave.
SW. Service lines will need to be extended from this trunkmain to serve
this development.
Parkland Depending on the final plans, this proposed development will have a
Dedication: parkland dedication requirement of approximately 10 acres. A minimum
of 3.5 acres of the dedication should be in the form of land. The revised
Page 6
` General Development Plan #219 Spring Brook Valley
December 7. 2006
GDP indicates a 3.5 acre public park which will meet the development's
land dedication. The balance of the dedication can be in the form of
cash in lie of land. The Park Department is responsible for 100' of the
1000' of street construction costs for the park site frontage.
Additional open space will exist in the western third of the site in and
around the two large wetlands. The applicant will need to address long
term control and -maintenance of this open space.
Environmental This development meets several thresholds requiring a Mandatory
Review: Environmental Assessment Worksheet in accordance with MN Rules,
4410.4300.
The applicant submitted an EAW to the City in 2004. The City Council
adopted a negative declaration, indicating no need for the applicant to
prepare an Environmental Impact Statement. This proposal does not
trigger the need for a new EAW.
Referral 1.
Planning Dept. Transportation Division (email and 2003 study)
Comments: 2.
Rochester Public Works
3.
Wetland LGU, John Harford
4.
Rochester Park & Recreation
5.
RPU Water Division
6.
Rochester Fire Department
7.
Planning Department - GIS Division
8.
RPU — Environmental and Regulatory Affairs
9.
MNDOT
Report 1. Proposed General Development Plan
Attachments: 2. General Development Plan Narrative
3. Decorah Edge Report
4. Referral Comments
Criteria & Staff Suggested Findings:
Paragraph 61.215 of the Rochester Zoning Ordinance and Land Development Manual lists the
Criteria for approval of a general development plan.
Criteria A. The proposed land uses are generally in accord with the adopted Comprehensive
Plan and zoning map, or that the means for reconciling any differences have
been addressed. A GDP may be processed simultaneously with a rezoning or
plan amendment request.
A Zoning District amendment was previously approved. The land uses
within the GDP are generally consistent with the land use designations of
Low Density Residential and Commercial and zoning for the property.
Due to the location within the Decorah Edge a Site Capacity Calculation is
required Based on the calculations, the proposed development density
shown on the GDP for the entire property will be within ordinance limits.
Page 7
General Development Plan #219 Spring Brook Valley
December 7, 2006
A Type 11 or Type Ill review process will be required for the development
densities in Areas D, E, and F. The Performance Residential standards will
apply in the review process with the Type ill review under the Incentive
Development standards of 62.600.
Criteria B. The proposed development, including its lot sizes, density, access and circulation
are compatible with the existing and/or permissible future use of adjacent
property.
Access and circulation issues exist with the proposed plan, related
primarily to off -site connections of the core development area to the major
street system serving the area. Upgrading of the West Frontage Road is
being completed to a Primary Urban Collector street cross section as pan
of the TH 63 South Interchange Project. The primary access for the
development will be Sedge Meadow Circle, and all but 24 residential units
will need to use this primary access. A secondary access is proposed by a
private street connected to Willow Ridge Dr., SW.
The LDM calls for secondary access to be provided for low density
residential development once the traffic level in an area exceeds 1200 trips
per day, or approximately 120 dwellings. The development will need to be
phased to limit the number of trips generated prior to completion of the
secondary connection to Willow Ridge Dr., SW.
Enterprise Drive need not be connected to the interior public and private
street system proposed as part of this development. In the event the
property changes such that the density increases, number of residential units
increases or a more intense (commercial) use is proposed, Enterprise Drive
could be extended through this development and serve as an additional
access. Therefore, the existing Enterprise Drive right-of-way needs to be
retained at this time for future land use decisions.
With the connection of the two-way private street and second access,
Willow Ridge Drive will operate at capacity according to the previous GDP
review. If necessary to further reduce trips on Willow Ridge Drive, the
developer could be required to install a traffic -calming device, which could
further reduce the number of vehicles utilizing Willow Ridge Drive. Another
option is that the City could require the developer to contribute toward
upgrading Willow Ridge Drive to the design standards of a Major
Residential Street to handle higher volumes of traffic. On and off site
improvements will need to be outlined in a development agreement prior to
development of this property.
Due to the location within the Decorah Edge the applicant will need to
comply with the standards of Chapter 59 and related Zoning Ordinance
standards for development within the Decorah Edge.
Criteria C. The mix of housing is consistent with adopted Land Use and Housing Plans.
The R-1x Zoning District was previously approved. The land uses within
the GDP are generally consistent with the land use designation and zoning
for the property.
v \� Page 6
General Development Plan #219 Spring Brook Valley
December 7, 2006
Based on the Site Capacity Calculations the development density shown on
the GDP is generally consistent with a the densities allowable as a
Performance Residential development.
The policies and goals found in Chapters 2 and 3 of the Rochester Urban
Service Area Land Use Plan encourage developing a range of densities and
development styles. The Housing Plan includes, as a standard for physical
and social environments of residential neighborhoods "adequate open
space and recreational facilities conveniently located to serve residents".
Criteria D. The proposed plan makes provisions for planned capital improvements and
streets reflected in the City of Rochester's current 6-Year Capital Improvement
Program, adopted Thoroughfare Plan, the ROCOG Long -Range Transportation
Plan, Official Maps, and any other public facilities plans adopted by the City.
Street system improvements required to accommodate proposed land uses and
projected background traffic are compatible with the existing uses and uses
shown in the adopted Land Use Plan for the subject and adjacent properties.
Several alternatives for extending water service to the site exist. The
applicant will need to coordinate with RPU Water Division to determine
options and design requirements.
A trunkmain sanitary sewer bisects this property, which currently serves
the Greystone development and other developments located west of ie
Ave. SW. Service lines will need to be extended from this trunkmain to
serve this development.
Upgrading of the West Frontage Road is being completed and the street will
be a Primary Urban Collector street cross section as part of the TH 63
South interchange Project, which will replace at -grade intersections on TH
63 with an interchange at 40m St and will upgrade connecting roads to the
interchange area.
Right of Way for Enterprise Drive terminates at the south line of this
property and is not currently shown to extend into this GDP. Enterprise
Drive need not be connected to the interior public and private street system
proposed as part of this development. In the event the property changes
such that the density Increases, number of residential units Increases or a
more intense (commercial) use is proposed, Enterprise Drive could be
extended through this development and serve as an additional access.
Therefore, the existing Enterprise Drive right-of-way needs to be retained at
this time for future land use decisions.
With the connection of the two-way private street and second access,
Willow Ridge Drive will operate at capacity according to the previous GDP
review. If necessary to further reduce trips on Willow Ridge Drive, the
developer could be required to Install a traffic -calming device, which could
further reduce the number of vehicles utilizing Willow Ridge Drive. Another
option Is that the City could require the developer to contribute toward
upgrading Willow Ridge Drive to the design standards of a Major
Residential Street to handle higher volumes of traffic. On and off site
r.
Page 9 a
General Development Plan #219 Spring Brook Valley
December 7, 2006
improvements will need to be outlined in a development agreement prior to
development of this property.
Comments provided by Transportation Planning staff indicate that there
must be a minimum spacing requirement of 330' between the southern
edge of the 33rd St right of way and the northern edge of the proposed
Spring Brook Drive right of way. The applicant has amended the GDP to
comply with this provision of the ordinance. Access from the commercial
property to Commercial Drive must be at least 225' apart.
The development will need to be phased to limit the number of trips
generated prior to completion of the roadway connection to Willow Ridge
Drive.
Criteria E. On and off -site public facilities are adequate, or will be adequate d the
development is phased in, to serve the properties under consideration and will
provide access to adjoining land in a manner that will allow development of those
adjoining lands in accord with this ordinance.
1. Street system adequacy shall be based on the street system's ability to
safely accommodate trips from existing and planned land uses on the
existing and proposed street system without creating safety hazards,
generating auto stacking that blocks driveways or intersections, or
disrupting traffic flow on any street, as identified in the traffic impact
report, if required by Section 61.523(C). Capacity from improvements in
the first 3 years of the 6-year CIP shall be included in the assessment of
adequacy.
Please see the attached memorandum from Muhammad Khan, dated
Oct. 3, 2003 which includes a traffic analysis for this GDP.
Roadways proposed within this development include both private
and public roads. Right-of-way and pavement widths shown on the
GDP appear to be generally consistent with local design standards.
The applicant will need to coordinate with the Rochester Public
Works department to determine the required right-of-way and
roadway widths and design standards. Roadway connections to e
Ave. SW and Willow Ridge Drive will need to limit the number of
trips that access those roadways to maintain acceptable levels of
traffic on those and adjacent roadways.
Enterprise Drive need not be connected to the interior public and
private street system proposed as part of this development. In the
event the property changes such that the density increases, number
of residential units increases or a more intense {commercial) use is
proposed, Enterprise Drive could be extended through this
development and serve as an additional access. Therefore, the
existing Enterprise Drive right-of-way needs to be retained at this time
for future land use decisions.
In the GDP approved In 2004 the Transportation Planning staff
indicated that Willow Ridge Drive may function at or beyond current
capacit)4 if necessary to further reduce trips on Willow Ridge Drive,
n� Page 10
V` General Development Plan #219 Spring Brook Valley
December 7, 2006
the developer could be required to Install a traffic -calming device,
which could further reduce the number of vehicles utilizing Willow
Ridge Drive. Another option is that the City could require the
developer to contribute toward upgrading Willow Ridge Drive to the
design standards of a Major Residential Street to handle higher
volumes of traffic. On and off site improvements will need to be
outlined in a development agreement prior to development of this
property.
The development will need to be phased to limit the number of trips
generated to Sedge Meadow Court to 1,200 prior to completion of
the roadway connection to Willow Ridge Drive.
2. Utilities are now available to directly serve the area of the proposed land
use, or that the City of Rochester is planning for the extension of utilities
to serve the area of the proposed development and such utilities are in
the first three years of the City's current 6-Year Capital Improvements
Program, or that other arrangements (contractual, development
agreement, performance bond, etc.) have been made to ensure that
adequate utilities will be available concurrently with development. If
needed utilities will not be available concurrent with the proposed
development, the applicant for the development approval shall stipulate
to a condition that no development will occur and no further development
permit will be issued until concurrency has been evidenced.
Several alternatives for extending water service to the site exist.
The applicant will need to coordinate with RPU Water Division to
determine options and design requirements.
A trunkmain sanitary sewer bisects this property, which currently
serves the Greystone development. Service lines will need to be
extended from this trunkmain to serve this development.
3. The adequacy of other public facilities shall be based on the level of
service standards in Section 64.130 and the proposed phasing plan for
development.
This proposed development will have a parkland dedication
requirement of approximately 10 acres. A minimum of 3.5
acres of the dedication should be in the form of land. The
GDP indicates a 3.5 acre public park which will meet the
development's land dedication. The balance of the
dedication can be in the form of cash in lie of land.
Pedestrian facilities should be provided between Willow Ridge Drive
and the Internal public street system within this GDP, and along
Commercial Drive SW. The applicant should submit a phasing plan
given the mixture of densities and grading limitations on the site.
The applicant should submit a phasing plan given the mixture of
densities and, grading limitations on the site.
Criteria F. The drainage, erosion, and construction in the area can be handled through
normal engineering and construction practices, or that, at the time of land
i
Page 11 j
General Development Plan #219 Spring Brook Valley v,
December 7, 2006
subdivision, a more detailed investigation of these matters will be provided to
solve unusual problems that have been identified.
Storm water ponds are proposed in multiple locations, on the GDP, along
the creek corridor. Detailed grading and drainage plans will be required
when the property is platted or developed. The applicant will need to
incorporate stormwater measures that will comply with the MNDOT
comments that increased runoff from this site to the MNDOT right of way
will not be permitted.
Decorah Edge conditions exist through a significant portion of this Site.
The developer does not know the extent of grading on this site at this time
although there is an expectation that a Substantial Land Alteration review
will be required for several portions of the site. The applicant will need to
meet the requirements of Section 62.1105P and O, and show minimum land
alteration necessary for development, and incorporate re -infiltration of
intercepted groundwater flows into the grading and construction plans.
Criteria G Wetlands and Edge Support Areas (as defined in Chapter 59) will be
managed consistent with Chapter 59 and, where applicable, in such a
way as to maintain the quality and quantity of groundwater recharging
lower aquifers and to protect discharge, interflow, infiltration, and
recharge processes taking place; provided, however, that the Council
may waive this requirement under the provisions of Chapter 59.
The applicant has not sought a waiver from the provisions of Chapter 59
applicable to the Decorah Edge. Any intercepted groundwater flows must
be reinfiltrated or directed to managed wetlands. Detailed grading and
drainage plans will be required when the property Is platted or developed.
The grading plan must comply with the requirements of the Decorah Edge
provisions of the Wetland Conservation Ordinance and the Zoning
Ordinance.
The applicant proposes the filling of a 0.04 acre wetland, two
stream wetland crossings, and possible stream wetland impacts connected
to channel stabilization. The 0.04 acre wetland Impact falls within the
Exemption criteria (less than 2000 square feet of Impact Is exempt If that is
the extent of the impact to wetlands) of the Wetland Conservation
Ordinance. The street crossings of the wetiandlstream may cause an
impact that may be acceptable under Section 59.06, Subd. 4E. Potential
impacts to the wettand/stream to stabilize the channel and protect the
calcareous fen is in the public Interest and consistent with Section 59.13 of
the Wetland Conservation Ordinance. Further review will occur with the
wetland replacement plan submittal and with the grading plan.
Criteria H. The lot, block, and street layout for all development and the lot density for
residential development are consistent with the subdivision design standards
contained in Section 64.100 and compatible with existing and planned
development of adjacent parcels.
The land uses within the GDP are generally consistent with the land use
designation and zoning for the property. A Site Capacity Calculation has
been completed. Based on the calculations, the development density
Page 12
General Development Plan #219 Spring Brook Valley
December 7, 2006
shown on the GDP is generally consistent with the Performance Residential
standards of the R-ix district.
Decorah Edge conditions exist through a significant portion of this Site.
Based on the proposed densities and topography of the site a Substantial
Land Alteration will likely be required. Therefore, the applicant will need to
meet the requirements of Section 62.1105P and O, and show minimum land
alteration necessary for development, and Incorporate re -infiltration of
intercepted groundwater flows into the grading and construction plans.
Criteria I If the eventual platting of the area involves approval of a Type III Land
Subdivision Permit, the proposed development must satisfy one of the following
categories of development:
1. A development bounded on all sides by arterial or higher level streets,
streams or other topographic constraints, existing development, land already
included in an approved General Development Plan, or permanent open
space that limits the inclusion of other abutting lands: WA
2. A development with adequate public facilities and constituting the entire
remaining service area of a major public facility improvement (such as a trunk
sewer or water tower) that has been identified as a project in the Capital
Improvement Program; N/A
3. A development that consists of at least 80 acres in land area regardless of
ownership or interest, and consists of all lands for which the applicant has
ownership or interest; or This application includes 109.35 acres and the
entire property under control of the applicant.
4. A development for which a development agreement has been executed by
the owner and the city for the entire property included in the proposed general
development plan. The development agreement must have been drafted
based on the development of the property occurring as proposed in the
general development plan. A Development Agreement has not been
executed for this development.
Recommendation:
This proposal is similar to the previous proposal approved by the City in 2004. The Decorah Edge
ordinance provisions do have an impact on the overall design and density. Some of the Decorah
Edge features were recognized in 20D4 and incorporated into the previous review. The staff
recommends that the following conditions be applied to this GDP:
1. There are inadequate on and off site public facilities to accommodate development
of the Property, including Sanitary Sewer, Water, Public Roadways, and Storm
Water Management Facilities. No development will be allowed to occur until the
City Council has determined that all required public facilities are adequate for said
development. Alternatively, the developer may request to join with the City in
making these inadequate public facilities adequate for this development, and may
enter Into a development agreemen; prior to Final Plat submittal, that outlines the
developer's and City's obligations related, but not limited to: access, stormwater
Page 13
General Development Plan #219 Spring Brook Valley
December 7, 2006
management (including any obligations for off -site facilities), transportation
improvements (including any off -site improvements necessary to accommodate
this development), pedestrian facilities, contributions for existing & future public
infrastructure, and the extension of public utilities to abutting properties where
applicable.
2. Grading & Drainage Plan approval is required prior to Final Plat submittal. The
location and designation of the "Detention Facilities" indicated on the GDP should
be viewed as conceptual until formally reviewed and approved through the Grading
& Drainage Plan review process. A regional stormwater management facility will be
required within this GDP site. The concept of several small detention ponds along
the wetlandlstream may be permitted as an aesthetic feature, but may not fulfill the
Owner's obligations for providing Stormwater Management.
3. Execution of a City -Owner Contract, and dedication of any applicable off -site public
easements is required prior to construction of any public infrastructure to serve
each phase of this development.
4. Pedestrian facilities are required at the Owner's expense along both sides of all
new public roads within this development, and along the entire frontage of the
Property abutting the west frontage road. In addition, a pedestrian trail shalt be
extended at the Owner's expense through the sanitary sewer corridor to the west
property line Specific obligations will be addressed in the Development Agreement.
The developer/owner shall also provide pedestrian facilities between the northern
extent of Willow Ridge Drive through Spring Brook Valley to the public road system
within the development.
5. Controlled access dedication requirements, and individual lot access to the
frontage road will be determined in the Development Agreement. Access to
Commercial Drive, the frontage road, from the commercial lot shall have a
separation distance of at least 225 feet.
6. Specific routing of utilities will be addressed through the platting process and plan
review. At the time of development, water main extension and looping of systems
must be completed per the requirements of RPU Water Division.
7. The private road from Willow Ridge Dr SW to this property is proposed for two way
traffic. if this connection is approved as a private two way road, the Owner will be
required through the Development Agreement process to dedicate public access
rights over the private roadway to allow traffic flow between the proposed and
existing development
8. Development will need to be phased to limit the number of trips to <f,200 prior to
construction of a second access. Phasing shall be such that access to Willow Ridge
Drive SW occurs when the development will exceed the 1,200 trip threshold and not
before based on plats or Plan approval.
9. Prior to final plat submittal, the applicant shall enter into a Development Agreement
with the City that outlines the obligations of the developerlowner relating to
Ownership and Maintenance of the Welland and Open Space Areas, in addition to
those items listed in condition #1.
10. This proposed development will have a parkland dedication requirement of
approximately 10 acres. A minimum of 3.5 acres of the dedication should be in the
form of land. The GDP indicates a 3.5 acre public park which will meet the
0("
Page 14
General Development Plan 0219 Spring Brook Valley
December 7, 2006
development's land dedication. The balance of the dedication can be in the form of
cash in lie of land.
11. The developer must provide a 35-foot wide buffer (no build zone) along the north
and south sides of the property adjacent to the existing residential developments.
(Required In the previous GDP approval by the City Council.)
12. The development is limited to one-story detached dwellings along the north side of
the development adjacent to the Southtown Heights and on the south side, south
of the private street, adjacent to Willow Heights. The density of development is
limited to a maximum of 5.5 units per acre within these two areas. (Required in the
previous GDP approval by the City Council.)
Notes:
• The applicant will need to meet the standards specified by the Fire Department in its
memo dated October 12, 2006.
• Development densities shown may be reduced following the review and action on
the Substantial Land Alteration.
• The maximum achievable intensity must not exceed the density or floor area ratio
factor for the applicable zoning district and the applicable approval process
(61.5338).
• MNDOT has stated that there is controlled access along the frontage road, therefore
no at grade access will be permitted for the frontage road and TH 63. MNDOT has
also stated that the surface water runoff from the property to the right of way may not
Increase with the future development.
G�
W
ir
LL
cl
a
J
7
In
w
Z
C
R
O J
O
T'ovoom
LO
N
0 =
CO) V
�
r
r
O
M
m
v
m
�
O
a`
�
c m
ca L
J
N?00co
_
rn
O
N 0
CO
LT
tp
Lo
G1 �
U C
Q
C
O
y O
0
R
000000
O
LL
0
0000
N
c0
y LO
�
rO0
O
U d
�a
O
w
d
m
N
N
Q
O
Q
O
`L
a
rn
a
a
Cl)
w
in
a9
to
0)
0)lL
LL
LU
n
V
~O.
0
N
16
Z.
y
d
X
a)J
c
co
V
V
C
c
N
CD
l9
N
0
O
d
m
o
y
a
0
a
o
<
L
Q
m
N
C
O
O
C
m
Q
o
a
a
c
o°
d
m
N
m
3
N
m
R
N
'O
o
'O
0
d
0
O-
0
ccm
Jy�y
0
0
0
d
7
W
LL
lL
.y.
LO
O)
F-'
m
N,
LA
co
V)
Q
Q
Q
r
J
U')
6
rm
N
N
5 co
A
co
co
O
7
LO
In
C
Cl)LO
to
N
IN
T
to
O
W
Cn
I W
JLLJ
m
C
R
J
C
O
V
Ju
w
O
C
d
R
O
C
d
`
d
Q
rn E
3
❑
N
lU 0
j
O
w+ l9
L
d
in
C =
Q
Q
o
h
+.
47
!� a
❑ c
E
7
y
.+w
Z
�Z
Cl)
R
L
N
Q _
fA
0)M
3=
maw
ca
Cn
LU
T
F
LLI
F
74—_
Page 1 of IG
Q 1
Harford John
From: Baker, Mark [mbaker@ci.rochester.mn.us]
Sent: Thursday, November 30, 2006 2:19 PM
To: Harford John
Subject: FW: Referral Comments: REVISED AMENDED PP#04-38
John -
Copy of email for your records.
Mark B
From: Baker, Mark
Sent: Monday, November 20, 2006 12:57 PM
To: (planning.referrals@co.olmsted.mn.us)
Subject: Referral Comments: REVISED AMENDED PP#04-38
PW has no new comments on this revised application.
Mark E. Baker
Land Development Specialist
Rochester Public Works
(507) 287-2114
P
Pare 2
City Ptmmine and Zonina Commission Minutes
Hearing Date: October 25, 2006
Mr. Haeussinger moved to continue Type IPWase III Conditional Use Permit #06-29,. by
Williams Family Partnership to November 006. Mr. McGuine seco
nded the motion.
The motion carried 8-0. 7 .
AND
Amended Preliminary Plat #04-38 by RMN Land Development. LLC to be known as Spring
Brook Valley Subdivision. The applicant proposes to subdivide 109.35 acres into 66 lots
Mr. John Harford presented the staff reports, dated October 9, 2006 and October 18, 200e, to
the Commission. The staff reports are on file at the Rochester -Olmsted Planning Department.
Mr. Hanford gave the history of the general development plan. He compared the differences in
the originally proposed general development plan and the proposed amended general
development plan.
Mr. Hanford explained that the Decorah Edge Ordinance is now in affect and showed where it
was located on the site. McGhie and Betts supplied site calculations today, but staff will need to
review it more thoroughly. He reviewed the calculations with the Commission. These
calculations are available for review at the Rochester -Olmsted Planning Department.
Mr. Harford stated that that applicant has withdrawn their request for a Substantial Land
Alteration due to many unknowns with the grading. Therefore, the Commission should not take
action on it tonight with the plat.
Mr. Harford explained where the wetlands were on the site and whether they were groundwater
or surface supported. He indicated the consultant may not necessary agree with him.
Mr. Burke asked if the groundwater supported wetlands needed to be avoided.
Mr. Harford read from the Ordinance and indicated that the groundwater supported wetlands
could not be disturbed under the new regulations.
Mr. Burke asked who was qualified to determine whether it is groundwater supported or not if
there is difference of opinion.
Mr. Wheeler responded that he is unsure if there is a disagreement at this time. Staff can
consult with Board and Soil Resources for guidance if needed.
Discussion ensued regarding density.
Ms. Rivas asked that, considering that Site Capacity calculations and that the information was
submitted today, if the Commission should continue the item.
el
\�-11Y
V
Page 3
Ciry Planain_ and Zoning Commission Minutes
Hearine Datc: October 2i, 2006
Mr. Harford responded that he would suggest that the Commission hear public testimony then
continue the items for two weeks so the consultant may get more answers on the questionable
items.
The applicant's representative, Ms. Kristi Clarke from McGhie and Betts, Inc. (1648 Third
Avenue SE, Rochester MN 55904), addressed the Commission. She showed the general
development plan that was approved on February 11, 2004. She described the differences
between the two plans (ex. density, 35 foot no build buffer, single family homes, removed the
center street, removed the pond, fewer lots, etc.).
Ms. Clarke stated that they are learning to work with the new Decorah Edge Ordinance as it was
recently implemented. There are some areas on the site that they do not feel are a certain soils
type. Therefore, Jeff Broberg and Luke Lunde will be doing some more borings in those areas
to clarify.
Ms. Rivas stated that they have done a good job of staying out of the natural areas.
Ms. Rivas asked if a neighborhood meeting was held.
Ms. Clarke responded no.
Mr. Burke asked what would happen if Enterprise Drive went through.
Mr. Hanford responded that Public Works and Planning Staff discussed who would build the
street. Fleet Farm did not want the roadway to go through.
Mr. Burke stated that there is no stipulation if a roadway would go through at some point.
Mr. Wheeler stated that, by not having that connection, it was the reason why there is a
connection to Willow Ridge.
Mr. Zachary Klaus (residing at 504 33rtl Street SW, Rochester MN 55902) addressed the
Commission. He stated that he has lived in his home since 1960. He indicated that the area
indicated as sensitive soil was a sand pit.
Mr. Klaus stated that the 35 foot buffer was not supposed to be a "non build" area but a "no
disturbed" area. In November of 1952, Dave Bernard used to farm in the area. When the
property was sold to Bob Neil to create Southtown Heights Subdivisions, they created a 33 foot
buffer. He indicated that Holt Abstract Company should have this filed at their place of
business. He indicated that the purpose of the 33 foot buffer was to separate the subdivision
from the farming area. There are many young Oak trees in the 33 foot buffer.
Ms. Rivas asked if Mr. Klaus found the documentation at Halt Abstract Company.
Mr. Klaus responded that he did not check.
Mr. Klaus stated that it is a very dry year. He stated that the wetlands are groundwater
supported. He expressed concern with the grading plan. He stated that he was recently
annexed and had to close his well. He indicated that they perforated his well and explained how
far he had to perforate it. The grading plan is below where he had to perforate.
Page 4
City Planning and Zoning Conumssion Minutes
Hearing Date, October 25, 2006
Mr. Klaus expressed concern with burning occurring on site with the new development. He
stated that he knew of residents that were sick when the burning occurred when the City put in
the sewer. He questioned what would happen when they begin grading and bulldozing. He
stated that a neighbor had to go to the hospital to get oxygen. Since he is asthmatic, he had to
leave his home.
Mr. Burke stated that they will need to specify their plan for trees and brush when they apply for
a final permit.
Mr. Hanford explained that the Fire Department issues the permit for burning on site.
Mr. Klaus stated that he did contact the Fire Department and they indicated that they couldn't
prevent it.
Mr. Wheeler explained that the City Council takes action on the disposal of trees and brush plan
and that, if the City Council stated that they could not bum on site, the Fire Department could
not issue a permit.
Ms. Sue Swanson (residing at 3615 9" Avenue SW, Rochester MN 55902) addressed the
Commission. She stated that she openly appreciated the Decorah Edge Ordinance that was
adopted.
Ms. Swanson stated that she believes that traffic will come down Willow Heights Drive. At
present, there are individuals taking out mailboxes at least 3 times a year. She stated that there
are significant safety concerns with the traffic occurring on Willow Heights Drive. She asked
that, when the development goes in and if there is an increase of traffic on Willow Heights Drive,
speed plateaus be put in at the expense of the developer.
Mr. Burke asked if she had discussed traffic calming with the Rochester Public Works
Department regarding her current safety concerns.
Ms. Swanson stated that it is not a high income location and the neighborhood would have a
hard time paying for it. She asked that a new traffic study be done if traffic is impacted on
Willow Heights Drive.
Discussion ensued regarding load limits and that Rochester Public Works would need to be
contacted.
Ms. Swanson asked that the Commercial exclude having a strip club being located there.
Mr. Chly responded that it would be too close to residential property. He stated that it was his
belief that it had to be farther than 1,000 feet from residential property.
Ms. Swanson stated that she though the 35 foot buffer to be a Tree Buffer Zone.
Mr. Harford read out loud the City Council motion:
ko�
I
1
I
I
N
Page 5
City Planning and Zoning Commission Minutes
Reanne Date: October 25, 2006
Councilmernbers Marcoux moved, Hanson seconded, to approve General
Development Plan 9219, to be known as Spring Brook Valley -N,th 13 conditions;
Number 12 being "The developer shall prrnride a 35-foot wide buffer (no build zone)
along the nonh and south sides of the properly adjacent to the existing residential
developments", and Number 13'The development is limited to one-story detached
dwetGngs along the north side of the development adjacent to Southtown Heights
and on the south side, south of the private street, adjacent to Willow Heights. The
density of development shall be limited to a maximum of 5.5 uniWacre snthin this
area". and instructed the City Attorney to prepare Findings of Fact. Conclusions of
Law. and Order. Ayes (T), Nays (0). Motion carried.
Ms. Rivas asked if Ms. Swanson was really asking for a "no grading" zone
Ms. Swanson stated that she would like the trees to be left.
Mr. Wheeler stated that, because the previous GDP is about to expire, the question could be
addressed again by the Commission and Council.
Ms. Swanson stated that she felt townhomes were inconsistent with their neighborhood.
Ms. Wendy Turri (residing at 604 33rd Street SW, Rochester MN 55902) addressed the
Commission. She stated she listened to the City Council minutes and stated they stated "no
disturb' but the minutes reflected "no build".
Ms. Turri stated that there were erosion problems when the sewer was put in. She expressed
concern with having a neighborhood of 50 homes on 50 acres and having a new development
of 460 homes on 60 acres.
Ms. Jennifer Mann (residing at 715 36"' Street SW, Rochester MN 55902) addressed the
Commission. She stated that the 35 foot buffer was to help the flow of the neighborhood. She
would prefer R-1 zoning. She expressed concern with the proposed development impacting
traffic.
Ms. Mann stated that the trailer homes in Willow Ridge would be impacted by the proposed
development and asked that they be notified. She indicated that there are many children in that
area and expressed concern with their safety.
Ms. Sandra Miller (residing at 3960 Willow Court SW, Rochester MN 55902) addressed the
Commission. She expressed concern about developing more land with blacktop and getting rid
of trees.
Mr. Burke explained that the City has proposed using properties within in City instead of having
urban sprawl. It is called infill.
Ms. Miller expressed concern with it all being close together. The children in the trailer park
have no place to play besides the street.
Mr. Burke responded that there would be a park for them to play at
Discussion ensued regarding the development process.
cos
Pugu 6
City Planning and 7_nning Commission Minutes
Hearing DateOcLDber 15. 1006
Ms. Swanson expressed concern that the buffer was not properly addressed.
Mr. Burke stated that the City Council would discuss the discrepancy and take appropriate
action.
With no one else wishing to be heard, Mr. Burke closed the public hearing
Mr. Haeussinger moved to con3inue:Amendment to GDP #219:by.RMN Land
Development, LLC to be known as Spring Brook Valley to November 8, 2006:_ Ms. Rivas
seconded the motion. The motion carried 8-0.
Mr. Haeussinger moved to'continue Amended Preliminary Plat #04738 by RMN Land-`
Development, LLC to be known as Spring Brook Valley Su6divTsfon to November 8,�2006: 4'
Ms- Rivas seconded the motion.: The motion _carried 8-0.
AND
Mr. John Harford presen the staff reports, dated October 19, 2 and October 25, 2006, to
the Commission. The sta orts are on file at the Rochester msted Planning Department.
Mr. Harford explained that there an issue regarding a s to the site and that there are
conditions of approval that the Co fission must addr before taking action on the General
Development Plan.
The applicant's representative, Ms. Kristi 0 rk rom McGhie and Betts, Inc. (1648 Third
Avenue SE, Rochester MN 55904), address the Commission. The General Development
Plan process now has to show 80 acres e t ugh the property is not owned by the same
property owner. She explained that the_
he ounty ineer was concerned with two access points
but indicated that they only had contr over their o roperty at which there is only one
access point. The access points w e note moved fro the original general development. She
explained that she will be workin ith the County Engin r on the conditions.
Ms. Clarke stated that the GK Land Use Plan shows the are s Industrial. She showed the
floodway boundary. The odway will remain R-1. She stated Nt they comply with the
Shoreland Ordinance. Whe showed where the hydric soils were IoXted.
Ms. Clarke stated t the applicant is in agreement with the staff-reco ended conditions.
Ms. Nancy Br mer (residing at 2217 Cedar Park Ct SE, Rochester IN 55 addressed the
Commissio She expressed concern regarding wildlife, dust, and safety. Sh ked that the
buffer be large as possible. She stated that she would prefer that the applican ut in Spruce
trees t lock the sound and dust. Also, she asked that a chain link fence be put ar d the
EON
Page 6
City Planning and Zoning Commission Minutes
V.;.... T1e,u NnvrmhPr x NM
as an Exempt activity (except for reclamat!OIV for the entire site based on staff's findings..
Mr. McGuine seconded the motion Them carried 8-0.
Amendment to GDP #219 by RMN Land Development LLC to be known as Spring Brook
Vallev The plan includes 109.35 acres of land located west of TH 63 and north of the
Fleet Farm Store and south of the Southtown 2nd and Southtown Hetahts subdivisions.
AND
Amended Preliminary Plat #04-38 by RMN Land Development LLC to be known as Spring
Brook Valley Subdivision The applicant proposes to subdivide 109.35 acres into 66 lots
for single family development and 6 outlots for future residential and commercial
development The Applicant Is also requesting approval of a Substantial Land Alteration
permit that will change grades by more than 10 feet over portions of the propertV. The
propertV is located north of Fleet Farm west of TH 63 and south of the Southtown
subdivisions.
Mr. Burke explained that public hearing was closed at their October 25, 2006 meeting.
Mr. Pestka asked if the Commission was still lacking materials to make an informed decision.
Mr. Harford stated that a revised GDP, without the site capacity calculations, was submitted on
Friday, November 2, 2006 and that a revision to the preliminary plat had just been received.
Staff did not have adequate time to review the revised plan and circulate to referral agencies for
their review. He described some of the changes that he has seen at first glance.
Mr. John Harford explained that the applicant identified additional hydric soils in the edge
support area. Therefore, applicant has reduced the length of the cul-de-sac. Also, additional
borings were done that indicated a 477B soil type does not exist in the commercial area as first
believed.
Mr. Wallace stated that neighbors discussed a 35 foot buffer to the north being an issue at the
last meeting.
Mr. Harford stated that the resolution approved for the previous version of the general
development plan states that it is a "no build" area 35 feet wide from each of the property lines.
Some of the neighbors are of the belief that the City Council approved a "no disturb" area and
not a "no build" area. He explained that the issue would need to be discussed before the City
Council.
Discussion ensued regarding possible disturbance on the site.
Mr. Burke asked if the site calculations reflect the revised plans submitted at tonight's meeting
Mr. Harford responded yes.
Mr. Haeussinger expressed concern with getting changing plans continuously. Plans were
submitted on packet day, during the week, and now revised plans at the meeting. He stated
that he would like to see the final product with all the requested data and have time to look it
over.
Mr. Burke expressed concern that all the different revisions haven't been reviewed in detail.
Page 7
City Planning and Zoning Commission Minutes
Hearing Date: November 6, 2006
Mr. Haeussinger suggested that the Commission continue the items to December 13, 2006 with
the condition that they submit all the materials in time for staff to review it prior to it being sent to
the Commission.
Mr. Only questioned the timing on the application.
Mr. Harford responded that he sent the applicant a 120 day letter.
Mr. Harford stated that staff needs to route the revised plans to Rochester Public Works and
RPU and have time to compile the comments to revise the staff reports.
Mr. Haeussinger moved fo continue Amendment to GDP `#2a9 by RMN Land
Development, LLCto be known as Spring Brook ValleyFan�d Amended Preliminary Plat
#04-36 by;RMN Land Development,;LLC to lie known —Spring Brook Valley Subdivision
to December-13;.2006. Mr. McGuine'secorfded the motion: The motion carried 8-0.
PUBLIC HEARINGS:
Mr. John Harford presented the staff repo dated Novembe , 2006, to the Commission. The
staff report is on file at the Rochester-Olms\s!
anning D artment.
Mr. Burke questioned why the site was uni
Mr. Harford responded that it was due to thd height of the tower.
The applicant's representative, Don Miller
Rochester MN 55904), addressed the Coi
Commission make the site friendlier for R
Colby Associates (717 Third Avenue SE,
e explained that the requests before the
nce and construction.
With no one else wishing to be heard, Mr. Burke tilt
Mr. Haeussinger moved to appr a Variance #06-22'
Rochester Public Utilities, with a staffrecommen
the motion Themotion cirri 6-0
the public hearing.
,Ign Modification #06-06, by
Igs Ms Wiesner seconded
. a v .- ••A..I::-i RrvW •4..Fl... �
srUes would recivre a wider tinkor even a`bunedtank: '
ONABLE U5B:,The,property can be used for the ground st
'tatbacks f a retaining wall -is constructed; the drive+ivay
cements Tor=
and higher, ,
e reservoir and,.
`o1
\� DRAFT City Planning Commission Minutes
December 13, 2006 meeting
CONTINUED ITEMS:
► UU0
Mr. John Harford presented the staff reports, dated October 18, 2006 and revised on December
7, 2006, to the Commission. The staff reports are on file at the Rochester -Olmsted Planning
Department.
Mr. Harford stated that the plat and GDP are ready to be moved forward to the City Council. A
revised site capacity calculation has been submitted and reviewed. The application is under a
Type 3 process for density. Wetland areas have been shown that will be affected by the
Decorah Shale. The street entrance to the west side of the frontage road now shows that it
meets the minimum requirements. The plat reflects the changes to the GDP. There is a slight
reduction in the number of units to 436. They meet the requirements of the Decorah Edge
Ordinance.
Mr. Wallace asked about the 35 foot buffer between the property and the residential property.
Mr. Harford stated that the City Council minutes stated that it is a "no build" zone. The question
is whether it was actually intended to be a "no disturb" zone. The question of the intended
language will need to be addressed by the City Council.
Mr. Burke asked if the applicant removed the substantial land alteration request.
Mr. Harford responded yes.
Mr. Burke stated that the public hearing was closed at a previous meeting. He indicated that he
spoke with the applicant and they stated that they are in agreement with staffs
recommendation.
Mr.
the
r
DRAFT City Planning Commission Minutes
December 13, 2006 meeting
development A
making these In
enter into a devi
developer's and
management (in
Improvements (I
2. Grading 8 Drainaget'lan;papprovitl,1' regiif[ed Prior. taFir+al,Plat submittal The
location and designation of the""Detention Fa6111164W Jrldicateril oath ; 666 r
viewed as conceptual untit formally reviewed and approved throughe Grading`
Drainage Plan review prgGees A tegto4ial stamwaterinanggemantfacil tnnl be
required within thisrGDP site `The 4orgtcePt of ve I. .9 de entuuk i� l
wetfandittrearr ma5r be, Pdrmi 8s a a ;t i tea iitmap riQ I ` at
3: ` ExeCutic
phase of this development 4p , Y, ,r3,� "tk# y
4. Pedestrian'facillties are required at theninr's ex}i3e along bath s de s of a
public roads within this development, and along the enure foitageaf file , rty
abutting the west frontage road tit artd�ittoitra pd®s1jt s alla�� ti
the Owner's expensg tllroujo�t> the saniar( gwer eor r$tove' i� 1 e
Specific obligaf�onsjrlli
Add isse� be�tkgreemenh q
J�..�i.:::a,.fw...was: ai'`.nlficw�ifeFaaviirTd Ti n.'c`ti►ts. between tlienorther`nexte
5', Controlled access de n req ret ►en �arkAJA 0 J
road will be determined,ii that Deveiopr�ien.lgreenent�c
the frontage road, from the commercial Igtshatt hasrre"a`�ep
225 feet.
t
6. Specific roudng ofw3ti 'a dr ugh th1
!' L►al.i'�i:w` iK:isiw�waiaF°" e1'i9]fPRG1�R'4
7. The private road front Vilillow Ridge Dr SVN to this 0roged .is tI
traffic. If this connection is approved as a private twd%i,, roa
required through the Development Agreement process_to_dedii
rights over the private roadway to allow traffic flow, between th
exlodng development'
�120-4
+x'
i
DRAFT City Planning Commission Minutes
December 13, 2006 meeting
construction of a second a
Drive 5W occurs when the
before based on, plats or P
AIJ
9- Prior to final ptik ubmftal
the City that oudihes the t
condition #1.
4
10. This proposed develop.' w
approximately 90 acres. A Mir
form of land. The GDP indicati
development's land dedication
cash in lie of land.
11 The developer must provide a"
south sides of the' Property. adj
(Required in the previous ,GDP
112. The development is -limited to
the development adjacent to tl
a3
The
carnea it;-u.
CONDITIGNS
1'. Roadway names wilt need to beR
mks ,a nhar 1s''�nnrt>e*icimrirsine�uFif
acre
2. The Piat shall tie rews d to iden"t iy° additloAi
requirements specified i 1 the Ocfohe49`200i
3. Prior to Final Plat submittal the applicant mu
private street connection to Willow Ridge Dri
access easement shall be granted from UVllla
fora private roadway The gassm - 4 -hail a
ervi sce personnel €ongterrn irrainteriance;.
4., wetland-1017
secured for
DRAFT City Planning Commission Minutes
December 13, 2006 meeting
5. There are inadequate on, `znffstta,
the Property, inciudm�g;Sa itaryS d
Management Facilities., No developn
Council has determined that alirequi
development. Alternatively, the deve
making these inadequate public facil
enter into a development agreement,
developer's and City's obligations re
management (ine4#ing any obligatit
applicable.
6. Grading and Drainage;approva-Fit requireqand ttaymen tlfa'Stomilliia
Management Fee will be appllcable for the entire P�operfiy finless otfiry
addressed in a Development Agreement. "in addition, on site sediments
control facilities may be required_fof thisdevelop,
ineil
u• s �„� is ks �' � yw.L � n s*'- . ".. - : ,..
7. Ownership a4dVaintenanee pf the p used Outlots needs to be addre
Final Plat"approva'f R,$
8. Block 1, Lots 1'3, arvHiociYs�it�bi' ed� ;r 4ae[age,(i A
second access is "Oro ded.
4
9. This application is subject to. meeting and ,comply! n vitrth all cond�t�bn
of the General Development Pian,for this pfoperf�r '
10.This application" ssubiettajneet�nl���yng with all regwreme
Decorah Edge ordinac ne provlsi'ons
11.The applicant will need tp rXaife* requ,#or Idea c?io
the Park Department memidatedeflctobeY'B;
12.The applicant will need tocampiywithfhe:requirementsilltl�tJ
increase in stormwater rtmoff front this site eauseef byCii deYelqAN
the TH 63 ri lit-ofawa . .. z "a' ., w � v n �W, �'"�.
RL-dUEST FOR COUNCIL ACTIO.. MEETING 113
DATE: 12-18-06
AGENDA SECTION: ORIGINATING DEPT: ITEM NO.
PUBLIC HEARINGS PLANNING E— /
ITEM DESCRIPTION: Amended Preliminary Plat #04-38 by RMN Land Development, LLC to be PREPARED BY:
known as Spring Brook Valley Subdivision. The applicant proposes to subdivide 109.35 acres into John Hanford,
66 lots for single family development and 6 outlots for future residential and commercial Senior Planner
development. The property is located north of Fleet Farm, west of TH 63 and south of the
Southtown subdivisions.
December 13, 2006 �D �� GPI{ r„' S fron. �✓e✓ G� k�
City Planning and Zoning Commission Recommendation:
The City Planning and Zoning Commission held a public hearing on October 23, November 8 and December 13 to consider
this preliminary plat to allow for a residential and commercial development.
The Planning Commission found that this preliminary plat conforms to the criteria listed in the Land Development Manual and
recommends approval of this preliminary plat with the following modifications or conditions:
1. Roadway names will need to be modified, per the requirements specified in the November 14, 2006
memorandum from Rochester -Olmsted Planning G1S/Addressing.
2. The Plat shall be revised to identify additional public utility easements, and other requirements specified in
the October 4, 2006 memorandum from RPU Water.
3. Prior to Final Plat submittal the applicant must identify and include in an outlot the private street connection
to Willow Ridge Drive; and prior to final plat recording, an access easement shall be granted from Willow
Ridge Drive to "Spring Brook Drive" for a private roadway. The easement shall grant rights of access to all
emergency service personnel. Long term maintenance and ownership of the private roadways will need to
be formally addressed prior to recording of the Final Plat documents.
4. Wetland impacts are proposed with this development. The applicant will need to submit a wetland
replacement plan to the City for consideration. Permits must be secured for any wetland impacts prior to
submittal of a final plat application. Also, the applicant will need to meet all Decorah Edge ordinance
requirements.
5. There are inadequate on and off site public facilities to accommodate development of the Property, including
Sanitary Sewer, Water, Public Roadways, and Storm Water Management Facilities. No development will be
allowed to occur until the City Council has determined that all required public facilities are adequate for said
development. Alternatively, the developer may request to join with the City in making these inadequate
public facilities adequate for this development, and may enter into a development agreement, prior to Final
Plat submittal, that outlines the developer's and City's obligations related, but not limited to: access,
stormwater management (including any obligations for off -site facilities), transportation improvements
(including any off -site improvements necessary to accommodate this development), pedestrian facilities,
contributions for existing & future public infrastructure, and the extension of public utilities to abutting
properties where applicable.
6. Grading and Drainage approval is required, and payment of a Storm Water Management Fee will be
applicable for the entire Property unless otherwise addressed in a Development Agreement in addition, on -
site sedimentation and rate control facilities may be required for this development.
7. Ownership and Maintenance of the proposed Outlots needs to be addressed prior to Final Plat approval.
6. Block 1, Lots 1-5, and Blocks 2-5 will be limited to 1,200 average daily trips until a second access Is provided.
COUNCIL ACTION: Morton by second by: to:
Page 2
RCA
December 14, 2005
9. This application is subject to meeting and complying with all conditions of approval of the General Develops
Plan for this property.
10. This application is subject to meeting and complying with all requirements of the Decorah Edge ordinance
provisions.
11. The applicant will need to meet the requirements for parkland dedication described In the Park Department
memo dated October 6, 2006.
12. The applicant will need to comply with the requirements of MNDOT that there be no increase in stormwater
runoff from this site
caused by this development that enters the THC63 right of way.
! � .1 �.h'. yC' (d..-- Ctf,✓'-a..— '/- u<.,.0 -L. �. ,E+<.rr+., sz.... ja` �� ..- r "
Mr. Haeussinger moved to recommend approval of amended Preliminary Plat #04-38 by RMN with the
staff -recommended findings and conditions. Mr. Ohly seconded the motion. The motion carried 8-0.
Council Action Needed:
The Council may approve, approve with conditions, or deny the land subdivision permit. The Council
must make findings of fact based on the criteria included in the staff report. A motion to deny must
include supporting reasons for a conclusion that at least one of the sixteen findings for denial in
Paragraph 61.225 can be made.
Attachment.,
1. Staff Report dated December 7, 2006
2. Draft City Planning and Zoning Commission minutes of December 13, 2006
Distribution:
1. City Administrator
2. City Attorney
3. Planning Department File
4. Applicant: This item will be considered sometime after 7:DD p.m. on Monday, December 18, 2006 in the Council
Chambers at the Rochester / Olmsted County Government Center.
N<
ROCHESTER-OLMSTED PLANNING DEPARTMENT D4.AocxESTEa:m�NN�
2122 Campus Drive SE, Suite 100 • Rochester, MN 55904-4744
i�
coin,. OF www.olmstedcounty.com/planning no
•pAD PO � R9 TEDAUGUST�S
TO: City Planning and Zoning Comm
FROM: John Harford, Senior
DATE: October 18, 2006, Revised Decer�Ver 7, 2006
RE: Amended Preliminary Plat #04-38 by RMN Land Development, LLC to
be known as Spring Brook Valley Subdivision. The applicant
proposes to subdivide 109.35 acres into 66 lots for single family
development and 6 outlots for future residential and commercial
development. The Applicant is also requesting approval of a
Substantial Land Alteration permit that will change grades by more
than 10 feet over portions of the property. The property is located
north of Fleet Farm, west of TH 63 and south of the Southtown
subdivisions.
Planning Department Review.,
Applicant/Owner: RMN Land Development
6601 Weston Parkway, Suite 240
West Des Moines, Iowa 50266
SurveyorsfEngineers: McGhie & Betts, Inc.
1648 Third Ave. SE
Rochester, MN 55904
Referral Comments: RPLI Water Division
Park and Rec. Department
Rochester Public Works Department
Planning Department - Addressing staff
MN Department of Transportation
Planning Department— Wetland Administrator
Planning Department —Transportation Planning
Rochester Fire Department
Report Attachments: 1. Land Development Manual Excerpts
2. Referral Comments
3. Copy of Preliminary Plat
4. General Development Plan
5., Substantial Land Alteration information
BUILDING CODE 5071285-8345 • GIS/ADDRESSING/MAPPING 50712B5-8232 • HOUSINGMRA 507P285-8224
PLANNING20NING 507/285-8232 • WEWSEPTIC 507/285-8345
FAX 5071267-2275
i� .`�
r'
Page 2
Preliminary Plat #04-33
Spring Brook Valley Subdivision
December 7, 2006
Development Review.,
Zoning: Most of the property is currently zoned R-1 X (Mixed Single
Family -Extra) district on the City of Rochester Zoning Map.
Lots 1 and 2 Block 1,and a portion of Outlot C are zoned B-4
(General Commercial).
Roadways: The plan proposes both public and private roadways within the
development.
Primary access is shown at the TH 63 west frontage road
(Commercial Drive). Additional access to the residential area is
proposed at the north end of Willow Ridge Drive and follows a
proposed 30' utility easement to the proposed Spring Brook
Drive. According to the GDP this access is proposed to
accommodate two way traffic on a 28' wide private road, which
would connect to the internal public street system. In the
previously approved preliminary plat concerns were raised by
the Transportation Planning Staff, so this roadway configuration
was modified from the original submittal to provide a more
circuitous route and to emphasize and encourage use of the
primary public road system. The street is proposed to be a
two-way. The applicant has not identified the private road on
the plat, as was done previously by way of an outlot. The
private should be identified as an outlot as is done for the
extension of 7 h Ave.
Another access is proposed at the north end of 7"' Ave. SW.
and is labeled Outlot 'F'. The extension of this road is proposed
to be a private street serving a limited area of the development.
Right-of-way for Enterprise Drive SW is platted to the south
property line of this GDP, but is not proposed to be extended
into the property.
Comments provided by Transportation Planning staff indicate
that there must be a minimum spacing requirement of 330'
between the southern edge of the 33 St right of way and the
northern edge of the proposed Spring Brook Drive right of way.
The current alignment does not meet that design
recommendation. Separation requirements (225' between
driveways) will apply to all access to Commercial Drive from the
commercial portion of the plat.
Roadway names will need to be modified, per the requirements
specified in the October 3, 2006 memorandum from Rochester -
Olmsted Planning GIS/Addressing.
REVISED PLAT: The applicant has moved Sedge Meadow
Circle upgradlent of the wetland on the south hillside in order to
avoid an impact on the wetland. Sedge Lane SW, the cul-de-
sac has been shortened to avoid impact to hydric soils within
Page 3
Preliminary Plat #D4-38
Spring Brook Valley Subdivision
December 7, 2006
the Decorah Edge. The applicant proposes to fill the 0.04 acre
wetland at the intersection of the cul-de-sac and main loop
street.
Pedestrian Facilities: Pedestrian facilities are required along both sides of all new
public roadways including Commercial Drive. Pedestrian
facilities should also be provided between Willow Ridge Drive
and the new public roadway within Spring Brook Valley. A
pedestrian trail will need to be extended through the sanitary
sewer corridor to the west property line.
Drainage: This property has steep and rolling terrain and drains to an
intermittent stream that runs from west to east through the site.
Based on the Soil Survey, slopes range from relatively level on
the eastern commercial area to 1-6% in the foot slope adjacent
to the drainageway, and 12-30% in mid slope areas on both
side of the valley.
The Plan proposes multiple cells for stormwater management
along the stream corridor in Area C noted on the GDP, as well
as detention pond(s) in the northeast corner of the GDP. A
regional stormwater management facility will be needed on the
easterly portion of the property.
Detailed grading and drainage plans will be required prior to
submittal of the final plat or permits are acquired for other
development within the plat.
REVISED PLAT: The MNDOT provided comments regarding
drainage to the TN 63 right of way. MNDOT states that due to
the drainage characteristics and behaviors of the drainage
channel drainage to these box culverts, any increased runoff
from this proposal in Mn/DOT right of way will not be allowed".
Wetlands and Decorah Wetlands are identified on the GDP and the preliminary plat.
Edge: The wetland were delineated 1999 and were reviewed again in
2003. There are 5 wetland areas, four on the hillsides and one
along the drainage channel.
The applicant has stated that the easterly two wetlands are not
groundwater supported but surface water induced wetlands.
The original wetland delineation indicated that all four wetlands
on the property are groundwater supported as seeps were
observed for all of the areas. The applicant does not dispute
this information.
The applicant proposes impacts on two wetlands located within
and outside the Decorah Edge. The wetlands include the
drainage channel, and another at the intersection of Sedge
Lane and Sedge Meadow Circle. The applicant must comply
with the Wetland Conservation Act and the Decorah Edge
ordinance provisions regarding these wetlands.
The westerly 2/3 of this property is located within the Decorah
Page 4
Preliminary Plat #04.38
Spring Brook Valley Subdivision
December 7, 2006
Edge. The site includes Groundwater Supported Wetlands and
soils related to the Decorah identified in the ordinance as the
Edge Support Area. The applicant's general development plan
indicates avoidance of impacts on the two largest wetlands
located on the westerly 1/3 of the property. The three other
wetlands on the site appear to be partially or completed altered
under the proposed plan. The easterly portion of the drainage
channel wetland and the bulk of the commercial area are not
located within the Decorah Edge.
The Groundwater Supported Wetlands and Edge Support
Areas within the Decorah Edge may not be "excavated, altered
hydrologically, drained or filled.. ° under the ordinance, with
exceptions explained in RCO 59.06, Subd. 4. A Site Capacity
Calculation is required for this development but has not been
submitted. The submitted and later withdrew a Substantial
Land Alteration with the preliminary plat. Section 62.1105 P
states that "land alteration is the minimum amount necessary to
develop at the site capacity" determined in accordance with the
residential density from the Site Capacity Calculation.
Subsection Q states that groundwater flows intercepted by
excavation must be reinfiltrated or directed to managed
wetlands. The applicant will need to analyze the areas
proposed for the SLA, especially the areas to be cut to
determine if the proposed grades can be amended to reduce
the impact in the Edge Support Areas. The applicant will need
to identify what measures will be employed to reinfiltrate
intercepted groundwater flows or direct them to managed
wetlands.
The Site Capacity Calculations address Groundwater
Supported Wetlands and the Edge Support Area of the new
Decorah Edge ordinance. Wetlands in the Decorah Edge and
Edge Support Areas are subtracted from the density calculation
for the R-ix district, as they are Resource Protection Land. The
densities for the R-1x district are 5.5 (Type 1), 8.71 (Type II),
and 15 (Type III) units per acre. The overall density of the site
with the proposed 442 units on the 92 acres is 4.8 units per
acre. With 442 units and a Type III process the minimum
acreage not affected by Groundwater Supported Wetlands and
Edge Support Area is 29.5 acres (442115=29.5). Avoidance of
the wetlands allows a bonus to be applied, depending on the
percent avoidance. It appears that the primary impact of the
Decorah Edge ordinance provisions will be to affect the
Substantial Land Alteration and the grading and construction
details of the streets and utility systems.
REVISED PLAN. The Substantial Land Alteration application
has been withdrawn by the applicant. The applicant has
completed the Site Capacity Calculations and it shows that the
proposal does not exceed the density limitations for the site.
Area A has not changed and includes 24 units. Area B has
changed due to the requirements of Section 64.111 and has a
total of 16 units. Area C has a total of 15 units. Due to the
Page 5
Preliminary Plat #04-38
Spring Brook Valley Subdivision
December 7, 2006
street realignment Area D will have a total of 76 units and Area
E will have a total of 80 units. Area F will have a total of 225
units. There are a total of 436 units in the revised GDP which is
a reduction of 6 units. The westerly portions of Lots 1-4, Block
3 are affected by the Decorah Edge requirements, thus the
grading plan will be reviewed to determine if the lots are
buildable.
Public Utilities: Additional public utility easements will be required in this
development. Looping of the water main will be required, along
with additional valves and hydrants, as specified in the October
4, 2006 memorandum from RPU Water.
Spillover Parking: As per Section 63.426 of the LDM, all residential development
must provide spillover parking for service vehicles and visitors.
Spillover parking for much of this site will be determined under
separate review of site plans. Lots served via the private road
may not be provided with adequate spillover parking. The
applicant has widening the private road to a 28' wide surface
which would allow for parking on one side.
Parkland Dedication: This proposed development would have a parkland dedication
requirement of approximately 10 acres. A minimum of 3.5
acres of the dedication should be in the form of land. The
revised GDP indicates a 3.5 acre public park, which will meet
the development's land dedication. The location of the
proposed park is acceptable to the Park Department. The
balance of the dedication can be in the form of cash in lieu of
land. A minimum of 2.5 acres must be graded to a slope of 4%
or less.
General Development Plan: This property is included within the Spring Brook Valley General
Development Plan (GDP #219).
General Development Plan:
The GDP for this property includes the following conditions/modifications:
There are inadequate on and off site public facilities to accommodate development
of the Property, including Sanitary Sewer, Water, Public Roadways, and Storm
Water Management Facilities. No development will be allowed to occur until the
City Council has determined that all required public facilities are adequate for said
development. Alternatively, the developer may request to join with the City In
making these inadequate public facilities adequate for this development, and may
enter into a development agreement, prior to Final Plat submittal, that outlines the
developer's and City's obligations related, but not limited to: access, stormwater
management (including any obligations for off -site facilities), transportation
Improvements (including any off -site improvements necessary to accommodate
this development), pedestrian facilities, contributions for existing & future public
Page 6
Preliminary Plat #04-38
Spring Brook Valley Subdivision
December 7, 2006
infrastructure, and the extension of public utilities to abutting properties where
applicable.
2. Grading & Drainage Plan approval is required prior to Final Plat submittal. The
location and designation of the "Detention Facilities" indicated on the GDP should
be viewed as conceptual until formally reviewed and approved through the Grading
& Drainage Plan review process. A regional stormwater management facility will be
required within this GDP site. The concept of several small detention ponds along
the wetland/stream may be permitted as an aesthetic feature, but may not fulfill the
Owner's obligations for providing Stormwater Management.
3. Execution of a City -Owner Contract, and dedication of any applicable off -site public
easements is required prior to construction of any public infrastructure to serve
each phase of this development.
4. Pedestrian facilities are required at the Owner's expense along both sides of all
new public roads within this development, and along the entire frontage of the
Property abutting the west frontage road. In addition, a pedestrian trail shall be
extended at the Owner's expense through the sanitary sewer corridor to the west
property line Specific obligations will be addressed In the Development Agreement.
The developer/owner shall also provide pedestrian facilities between the northern
extent of Willow Ridge Drive through Spring Brook Valley to the public road system
within the development.
5. Controlled access dedication requirements, and individual lot access to the
frontage road will be determined in the Development Agreement. Access to
Commercial Drive, the frontage road, shall have a separation distance of at least
225 feet.
6. Specific routing of utilities will be addressed through the platting process and plan
review. At the time of development, water main extension and looping of systems
must be completed per the requirements of RPU Water Division.
7. The private road from Willow Ridge Dr SW to this property is proposed for two way
traffic. It this connection is approved as a private two way road, the Owner will be
required through the Development Agreement process to dedicate public access
rights over the private roadway to allow traffic flow between the proposed and
existing development.
8. Development will need to be phased to limit the number of trips to 0,200 prior to
construction of a second access. Phasing shall be such that access to Willow Ridge
Drive SW occurs when the development will exceed the 1,200 trip threshold and not
before based on plats or Plan approval.
B. Prior to final plat submittal, the applicant shaft enter into a Development Agreement
with the City that outlines the obligations of the developer/owner relating to
Ownership and Maintenance of the Wetland and Open Space Areas, in addition to
those Items listed In condition #1.
10. This proposed development will have a parkland dedication requirement of
approximately 10 acres. A minimum of 3.5 acres of the dedication should be in the
form of land. The GDP Indicates a 3.5 acre public park which will meet the
development's land dedication. The balance of the dedication can be in the form of
cash In lie of land.
r.
Page 7
Preliminary Plat #04-38
Spring Brook Valley Subdivision
December 7, 2006
11. The developer must provide a 35-foot wide buffer (no build zone) along the north
and south sides of the property adjacent to the existing residential developments.
(Required In the previous GDP approval by the City Council.)
12. The development is limited to one-story detached dwellings along the north side of
the development adjacent to the Southtown Heights and on the south side, south
of the private street, adjacent to Willow Heights. The density of development is
limited to a maximum of 5.5 units per acre within these two areas. (Required in the
previous GDP approval by the City Council.)
Preliminary Plat Staff Review and Recommendation:
Decorah Edge conditions exist through a vast area of this Site. The developer will probably need
to propose a Substantial Land Alteration given the proposed densities and topography on site.
The consultants will need to meet the requirements of Section 62.1105P and O, and show
minimum land alteration necessary for development, and incorporate re -infiltration of intercepted
groundwater flows into the grading and construction plans.
Section 61.225 of the Land Development Manual lists the findings which must be considered by
the Planning Commission and the Council when reviewing a land subdivision permit application.
This section is attached for your information.
The Planning staff has reviewed this preliminary plat request for compliance with the Rochester
Zoning Ordinance and Land Development Manual including Section 61.225 of the LDM. Blocks 1
and 5 do not assume an intensity of development which must be addressed through the Site
Capacity Calculations. The Planning staff has reviewed this preliminary plat request under the
provisions of LDM Sections 61.225 and 61.226. The staff recommends that the following
modifications or conditions be imposed on this preliminary plat in order to insure that the above -
mentioned criteria are met:
1. .Roadway names will need to be modified, per the requirements specified in the
November 14, 2006 memorandum from Rochester -Olmsted Planning
GiS/Addressing.
2. The Plat shall be revised to identify additional public utility easements, and other
requirements specified in the October 4, 2006 memorandum from RPU Water.
3. Prior to Final Plat submittal the applicant must Identify and include in an outiot the
private street connection to Willow Ridge Drive; and prior to final plat recording, an
access easement shall be granted from Willow Ridge Drive to "Spring Brook Drive"
for a private roadway. The easement shall grant rights of access to all emergency
service personnel. Long term maintenance and ownership of the private roadways
will need to be formally addressed prior to recording of the Final Plat documents.
4. Wetland impacts are proposed with this development The applicant will need to
submit a wetland replacement plan to the City for consideration. Permits must be
secured for any wetland impacts prior to submittal of a final plat application. Also,
the applicant will need to meet all Decorah Edge ordinance requirements.
5. There are inadequate on and off site public facilities to accommodate development
of the Property, including Sanitary Sewer, Water, Public Roadways, and Storm
Water Management Facilities. No development will be allowed to occur until the
l 0 -k
Page 8
\ Preliminary Plat #04-38
Spring Brook Valley Subdivision
December 7, 2006
City Council has determined that all required public facilities are adequate for said
development. Alternatively, the developer may request to join with the City in
making these inadequate public facilities adequate for this development, and may
enter Into a development agreement, prior to Final Plat submittal, that outlines the
developer's and Ctty's obligations related, but not limited to: access, stormwater
management (including any obligations for off -site facilities), transportation
improvements (including any off -site improvements necessary to accommodate
this development), pedestrian facilities, contributions for existing & future public
Infrastructure, and the extension of public utilities to abutting properties where
applicable.
6. Grading and Drainage approval is required, and payment of a Storm Water
Management Fee will be applicable for the entire Property unless otherwise
addressed In a Development Agreement. In addition, on -site sedimentation and
rate control facilities may be required for this development.
7. Ownership and Maintenance of the proposed Outlots needs to be addressed prior
to Final Plat approval.
S. Block 1, Lots 1-5, and Blocks 2-5 will be limited to 1,200 average daily trips until a
second access is provided.
9. This application Is subject to meeting and complying with all conditions of
approval of the General Development Plan for this property.
10. This application Is subject to meeting and complying with all requirements of the
Decorah Edge ordinance provisions.
11. The applicant will need to meet the requirements for parkland dedication described
in the Park Department memo dated October 6, 2006.
12. The applicant will need to comply with the requirements of MNDOT that there be no
increase In stormwater runoff from this site caused by this development that enters
the TH 63 right of way.
REMINDER TO APPLICANT..
• Prior to development, the property owner will need to execute a City Owner Contract for construction of
the public roadways and utilities.
• Approved grading, drainage and construction plans and an executed Development Agreement will
need to be submitted with the final plat application if the applicant intends to record the final plat
documents prior to completion of infrastructure improvements and acceptance of improvements by the
City.
Page 9 03
Preliminary Plat #04-38
Spring Brook Valley Subdivision
December 7, 2006
CITY OF ROCHESTER
ZONING ORDINANCE AND LAND DEVELOPMENT MANUAL
EXCERPTS
61.225 Finding for Land Subdivision:
The Zoning Administrator, Commission or Council shall approve a development permit authorizing
a land subdivision if all of the following findings with respect to the proposed development are
made:
A. The proposed land subdivision conforms to all relevant requirements of this ordinance and
variances have been granted to permit any nonconformance.
B. That the proposed water system and sanitary sewer system are adequate to serve the normal
and fire protection demands of proposed development and to provide for the efficient and
timely extension to serve future development.
C. That the plan for soil erosion and stormwater management meets the adopted standards of
the City of Rochester and is consistent with the adopted Stormwater Management Plan or
adopted drainage or stormwater policies.
D. That the vehicular and non -motorized system is consistent with adopted transportation plans
and is consistent with the street layout standards listed in Section 64.120 and traffic service
standards in Section 61.526.
E. That the lot and block layout provide for safe and convenient vehicular, service and
emergency access, efficient utility service connections, and adequate buildable area in each
lot for planned uses.
F. That the proposed land subdivision has taken into account the current 6-Year and other
Long -Range Capital Improvements Programs and the elements listed therein in the design of
the subdivision.
G. That the proposed subdivision, if in a resident zoning district, -addresses the need for spillover
parking consistent with the requirements of Section 63.426.
H. That right-of-ways and easements of adequate size and dimensions are -provided for the
purpose of constructing the street, utility, and drainage facilities needed to serve the
development.
I. That the proposed parks, trail thoroughfares and open space dedications are consistent with
adopted plans, policies and regulations.
J. That the proposed subdivision will not have off -site impacts on the street, drainage, water or
wastewater systems that exceed adopted standards.
K. That the proposed subdivision will not have adverse impacts on the safety or viability of
permitted uses on adjacent properties.
L. That the proposed land subdivision is designed in such a manner as to allow for continued
development in an efficient manner on adjacent undeveloped lands.
�lf� Page 10
Preliminary Plat #04-36
Spring Brook Valley Subdivision
December 7, 2006
Effective May 15, 1999
M. That the soils, topography and water tables have been adequately studied to ensure that all
lots are developable for their designated purposes.
N. That the proposed land subdivision is consistent with the standards of the City's adopted
Comprehensive Plan.
0. That any land located within Zone A as shown as on the currently adopted Flood Boundary
and Floodway Maps of the Flood Insurance Study, Rochester, Minnesota prepared by the
Federal Emergency Management Agency, is -determined to be suitable for its intended use
and that the proposed subdivision adequately mitigates the risks of flooding, inadequate
drainage, soil and rock formations with severe limitation for development, severe erosion
potential or any other floodplain related risks to the health, safety or welfare of the future
residents of the proposed subdivision in a manner consistent with this ordinance.
61.226 Conditions on Approvals:
In considering an application for development permit to allow a land subdivision, the approving
body shall consider and may impose modification or conditions to the extent that such
modifications or conditions are necessary to insure compliance with the criteria of Section 61.225.
r
ti()>4..-
ROCHESTER PARK AND RECREATION DEPARTMENT
201 FOURTH STREET SE
ROCHESTER MINNESOTA 55904-3769
TELE 507-281-6160
FAX 507-281-6165
MEMORANDUM
DATE: October 6, 2006
TO: Jennifer Garness
Planning
RE: Spring Brook Valley
Preliminary Plat #04-38 'REVISED'
Acreageof plat... ......................................................
109.35 acres
Number of dwelling units..... ........................................
66 units*
Densityfactor............................................................
.0244
Dedication................................................................
1.61 a
Fair market value of land .............................................
$26,000 / a
The Park and Recreation Department recommends that dedication requirements
be met via:
A combination of land and cash dedication. Land dedication of at least 3.5 acres
identified as Outlot C. A minimum of 2.5 acres of Outlot C shall be graded to a slope of
4% or less, cleared of forest vegetation and have topsoil cover of 60 or more. Parkland
dedication to occur when the site is accessed via public street or when the City wishes to
begin development
The park site (Outlot C) has +/- 1,000' of street frontage. This is acceptable to the Park
Department if the applicant is agreeable to pay for street costs in excess of 100'. If the
City/Park is expected to pay for ''Y2 of the street, the amount of park street frontage needs
to be reduced to +/- 100'.
Applicant should be required to grade and establish turf on all Outlots that will be deeded
to City.
RECEIVED
J2897 I i OCT 10 2006
):\PARK DEDICATION\2006\SW 2897\SPRING BROOK VALLEY GDP REV.DOC
�rK & Necreat'�
-� ROCHESTER PARK AND RECREATION
Rochester, MAY- DEPARTMENT
October 5, 2006
TO: Jennifer Garness
Planning
RE: GDP #03-219 "REVISED 0&26-06"
Spring Brook Valley
Depending on final site plans, the development as proposed could have a parkland
dedication requirement of ± 10.00 acres. A minimum of 3.5 acres of the dedication should
be in the form of land. The balance of the dedication can be in the form of cash in lieu of
land.
The revised GDP continues to show a 3.5 acre public park. The location of the
identified park site is acceptable to the Park Department. The configuration of the 3.5 acre
park includes almost 1,000' of street frontage. The City / Park Department to be
responsible for a maximum of 100' of park street frontage costs. The balance of the park
street frontage to be funded by the development.
RECEIVED
OCT 10 2006
OAPARK DEDICATIOM2 MSW 2897TSPRING BROOK VALLEY GOP REV.DOC
N
ROCHESTER
Hzl u.
TO: Consolidated Planning Department
2122 Campus Drive SE
Rochester, MN 55904
FROM: Mark E. Baker
DATE: 10/13/06
DEPARTMENT OF PUBLIC
WORKS
201 4" Street SE Room 105
Rochester, MN 55904-3740
507-287-7800
FAX — 507-281-6216
The Department of Public Works has reviewed the application for AMENDED Preliminary Plat_
#04-38 for the proposed SprinQ Brook Valley development. The following are Public Works
comments on this request:
There are inadequate on and off site public facilities to accommodate development of
the Property, including Sanitary Sewer, Water, Public Roadways, and Storm Water
Management Facilities. No development will be allowed to occur until the City
Council has determined that all required public facilities are adequate for said
development. Alternatively, the developer may request to join with the City in
making these inadequate public facilities adequate for this development, and may
enter into a development agreement, prior to Final Plat submittal, that outlines the
developer's and City's obligations related, but not limited to: access, stormwater
management (including any obligations for off -site facilities), transportation
improvements (including any off -site improvements necessary to accommodate this
- development), pedestrian facilities, contributions for existing & future public
infrastructure, the extension of public utilities to abutting properties where
applicable, and Ownership & Maintenance of the Outlots and Wetland areas within
this development.
2. Grading & Drainage Plan approval is required prior to Final Plat submittal. The
location and designation of the "Detention Facilities" indicated on the GDP should be
viewed as conceptual until formally reviewed and approved through the Grading &
Drainage Plan review process.
3. Execution of a City -Owner Contract, and dedication of any applicable off -site public
easements is required prior to construction of any public infrastructure to serve each
phase of this development.
4. Pedestrian facilities are required at the Owner's expense along both sides of all new
public roads within this development, and along the entire frontage of the Property
abutting the west frontage road. In addition, a pedestrian trail shall be extended at the
Owner's expense through the sanitary sewer corridor to the west property line
Specific obligations will be addressed in the Development Agreement.
C:\Documents and Settings\plajgarn\Local Settings\Temporary Internet Files\OLK611PP04-38 Spdng Brook Valley
REVISED 10-06.doc
ROCHESTER
TO: Consolidated Planning Department
2122 Campus Drive SE DEPARTMENT WORKS PUBLIC
Rochester, MN 55904 201 4" Street SE Room 108
Rochester, MN 55904-3740
507-287-7800
FAX — 507-281-6218
FROM: Mark E. Baker
5. Controlled access dedication requirements, and individual lot access to the frontage
road will be determined in the Development Agreement.
6. The private road from Willow Ridge Dr SW to this property is proposed for two way
traffic. If this connection is approved as a private two way road, the Owner will be
required through the Development Agreement process to dedicate public access
rights over the private roadway to allow traffic flow between the proposed and
existing development.
Preliminary Construction plans will be provided separately to the applicant's
consulting engineer.
Charges/fees applicable to the development of this property will be addressed in the
Development Agreement and City -Owner Contract(s) for the Property and include
(rates where indicated are through 7/31/07):
Sewer Availability Charge (SAC) @ $3511.71 per developable
d• Water Availability Charge (WAC) @ $2105.70 per developable acre
to Sanitary Sewer Connection Charge @ $53.01 per foot of frontage (estimated
4000 feet).
Willow Creek Transportation Improvement District (WCTID) contribution based
on rates for applicable Zoning
Storm Water Management — To Be Determined at the time of Grading Plan
approval, for areas that do not drain to a privately constructed on -site regional
detention facility.
$• Pedestrian Ramps
4.4 First Seal Coat Charge
Street Signs, as determined by the City Engineer
C:\Documents and Settings\plajgarn\Local SettingslTemporary Internet FileslOLK61\PP04-36 Spring Brook Valley
REVISED 10-06.doc
The hand to reach for...
DAVID A. KAPLER
Fire Chief
DATE: October 12, 2006
TO: Jennifer Garness, Planning
FROM: R. Vance Swisher, Fire Marshal
SUBJ: Amendment to Preliminary Plat #04-38 by RMN Land Development, LLC to be known as
Spring Brook Valley.
With regard to the above noted project plan, the fire department has the following requirements:
1. An adequate water supply shall be provided for fire protection including hydrants properly located
and installed in accordance with the specifications of the Water Division. Hydrants shall be in place
prior to commencing building construction.
a) The minimum fire flow for the commercial development area shall be no less than 2,500 gpm at
20 psi. The actual required fire flow per lot will be determined by the size and construction type
of the buildings being proposed.
The minimum fire flow for the single family residential development area shall be no less than
1,000 gpm at 20 psi.
2. Streets and roadways shall be as provided in accordance with the fire code, RCO 31 and the Zoning
Ordinance and Land Development Manual. Emergency vehicle access roadways shall be
serviceable prior to and during building construction.
a) Minimum street width shall not be less than 20 feet clear drivable width.
b) Streets less than 32 feet in width shall be posted "No Parking" on one side of the street. Streets
less than 26 feet in width shall be posed "No Parking" on both sides of the street.
c) Minimum cul-de-sac diameter shall not be less than 70 feet in diameter
d) Cul-de-sacs less than 96 feet in diameter shall be,posted "No Parking".
3. All street, directional and fire lane signs must be in place prior to occupancy of any buildings.
4. All buildings are required to display the proper street address number on the building front, which is
plainly visible and legible from the street fronting the property. Number size must be a minimum 4"
high on contrasting background when located on the building and 3" high if located on a rural mail
box at the public road fronting the property. Reflective numbers are recommended.
c: Donn Richardson — RPU Water (e-mail only)
Mark Baker — Rochester Public Works (e-mail only)
RMN Land Development, LLC
McGhie & Betts, Inc (e-mail only)
t �3�
we plrJgc, w< rlrlirr�
October 4, 2006
Rochester -Olmsted
CONSOLIDATED PLANNING DEPARTMENT
2122 Campus Drive SE
Rochester, MN 55904-7996
REFERENCE: Amended Preliminary Plat #04-38 by RMN Land Development, LLC known
as Spring Brook Valley.
Dear Ms. Gamess:
Our review of the referenced preliminary plat is complete and our comments follow:
1. To provide adequate water flows for fire protection of the commercial area the water main
must be looped from the north (Southtown Heights area) through this property to the south
(Willowridge area).
2. A 20' minimum utility easement is needed for the required 8" water main loop through
Outlot `B' to connect into the existing 8" water main stubbed out from the north (near the
sanitary sewer connection shown).
3. The preliminary construction plans do not indicate any water main to serve Lot 2, Block 1.
4. Static water pressures within this area will range from 66 to 92 PSI. The builders must install
pressure -reducing devices near the domestic water meters in the higher pressure areas as
required by the Minnesota Plumbing Code.
5. Revisions to the proposed water system layout are required, which include the addition of
valves and hydrants. We will work with the applicant's engineering firm on these locations.
Please contact us at 507-280-1500 if you have questions.
Very truly yours,
"4A 1
Donn Richardson
Water
C: Doug Rovang, RPU
Mike Engle, RPU
Mark Baker, City Public Works
Vance Swisher, Fire Prevention Bureau
Gary Schick, Building & Safety
McGhie & Betts, Inc.
RMN Land Development, LLC
Rochester Public Utilities, 4000 East River Road NE, Rochester, Minnesota 55906-2813
telephone 507-280-1540 facsimile 507-280-1542
Nov 22 2006 9:00RM MN/DOT 507-2t35-7279 p.2 /
Minnesota Department of Transportation
Minnesota Department of Transportation - District 6
Xrw&2900 48h Street N.W.Office Tel: 507-280-3188
Rochester, MN 55901-5948 Fax: 507-285-7279
E-mail: chris.moateS@dotstate.mn.os
November 22, 2006
John Hartford, Planner
Rochester Olmsted Planning Department
2122 Campus Drive SE — Suite 100
Rochester, MN 55904
RE: Amendment to GDP #219 by PJAN Land Development, LLC to be ]mown
as Spring Brook Valley. The plan includes 10935 acres of land located
west of US 63 and north of the Fleet Farm Store and south of the
Southtown 2a4 and Southtown Heights Subdivisions.
US 63, CS 5509
Dear Ms. Hartford:
Minnesota Department of Transportation (Mn/DOT) District 6 staff has reviewed the
above amendment to GDP #219 known as Spring Brook Valley. Mn/DOT would like
to include the following two comments in addition to Mn/DOT response letters dated
10113/2006, 5/10/2006, 6/9/2004 and 4/28/2004:
1. All work done within Mn/DOT right-of-way will require a Ma/DOT work
permit. You may contact Tom Streiff, Roadway Regulations Supervisor, at
(507) 285-7362, to obtain the work permit application.
2. The storm -water runoff from the development will drain toward the double box
culvert Mn/DOT just installed under Commercial Drive, US 63 ramps and US
63 as part of the 40a Street project. Due to the drainage characteristics and
behaviors of the drainage channel drainage to these box culverts, any increased
runoff from this proposal in Mn/DOT right of way will not be allowed.
Thank you for providing Mn/DOT the opportunity to comment. If there are any
questions, you may contact Peter Waskiw, Principal Planner, at (507) 285-7369 or
Debbie Persoon-Bement, Transportation Specialist at (507) 281-7777.
Sincerely,
(fWA..-
Chris Moates
District 6 Planning Director
cc: Kjersti Anderson, Michael Schweyen, Craig Hansen, Thomas Streiff
Peter Waskiw, Debbie Persoon-Bement, File
DOCS4548175
Rochester -Olmsted Planning Department
GIS/Addressing Division
2122 Campus Drive SE
Rochester, MN 55904-4744
Phone: (507) 285-8232
Fax: (507) 287-2275
PLAT REFERRAL RESPONSE
DATE: November 14, 2006
TO: Jennifer Garness; Stephanie F
FROM: Randy Growden
GIS/Addressing Staff
Rochester -Olmsted County
Planning Department
CC: McGhie and Betts
RE: SPRING BROOK VALLEY
PRELIMINARY PLAT #04-38
A review of the preliminary plat has turned up the following ADDRESS and ROADWAY related
issues.
1. The private roadway called Outlot "F" that extends into this plat from the south will need to be
given a designation.
RECOMMENDATION: Name the roadway and use the roadway type LANE and directional
of SW.
Note: Outlot `F' is an extension of the stubbed off 7 Avenue SW, a public roadway in
Willow Heights Second Subdivision. Outlot `F' connecting to 7 Avenue SW changes the
roadway configuration and creates a conflict with the definition for Avenue, thus requiring
a different roadway type and a roadway name change to the original plat. An RCA will be
necessary and a roadway -renaming fee of $900 will be incurred and will need to be paid by
the Developer of this plat.
2. Willow Ridge Drive SW, a public road in the Willowridge Plat, will extend north as a private
roadway, into the Spring Brook Valley plat. Therefore if the 30 foot U.E. is to be a private
roadway it will need to be designated.
RECOMMENDATION: If the 30 foot UTILITY EASEMENT is to be a private roadway it
will need to be designated as Willow Ridge Drive SW (PRIVATE).
REQUEST FOR COUNCIL ACTION
MEETING 1/ '
12-18-06
AGENDA SECTION: ORIGINATING DEPT: ITEM NO.
PUBLIC DARING PLANNING
ITEM DESCRIPTION: Final Plat #06-17 to be known as Rochester Towne Club PREPARED BY:
Villas, by Platinum Development Group. The plat proposes to Mitzi A. Baker,
subdivide approximately 5.61 acres of land along the south side of Senior Planner
Eastwood Road SE, west of 40th Ave SE into 24 lots for residential
development and one Outlot.
December 13, 2006
Staff has reviewed this final plat for compliance with the applicable regulations and recommends approval subject to
the following conditions/modifications:
1. Prior to recording the final plat documents, the applicant shall pay the E911 Addressing and GIS Impact fees,
as outlined in the December 4, 2006 letter from the Rochester Olmsted Planning Department GIS/Addressing
division.
2. Dedication of a right-of-way easement is required by separate document over the entire area shown as Outlot
"A". This easement shall be recorded prior to recording the Final Plat documents and shall be identified on
the Plat.
3. Dedication of Access Control shall be identified along the entire east line of Lot 24, Block f and the easterly
50 feet of the north line of Lot 24, Block 1.
4. Parkland dedication requirements shall be met via: Deferred dedication with dedication to consist of the
neighborhood park identified as Outlot B Rochester Towne Club Village. By prior agreement, parkland
dedication for the Rochester Towne Club development to be met via the exchange of current and proposed
golf course property and the dedication of Outlot B. Dedication to occur when the park site is accessed via
public street or when the City wishes to begin development of the park as outlined in the December 5, 2006
memorandum from Rochester Park and Recreation.
Council Action Needed.
if the Council wishes to proceed, it should Instruct the City Attorney to prepare a
resolution with findings supporting their decision.
Distribution:
1. City Attorney
2. Planning Department File
3. Applicant: This Rem will be considered sometime after 7:00 p.m. on December 18, 2006, in the Council/Board
Chambers at the Government Center, 151 4th Street SE.
COUNCIL ACTION: Marion by Second by. to:
• •99�
i
----
�` Gtr ;
m
fir`- ia'
.I.
oa'[5 t i
Zb,Z[.6G1 I
t
N 'a iF 4I6
c n =Fq
N JI EF
gi[OI
0
{A 8• F Y4 �`a�
asn � i aF
O a 4 � �aa51j:jE
as it 6�j1E"
m�ca�� m ¢a'�-•„�yp' F.t Eld d.E1F i3{t
n gY Y 1 a'Y€
Y g7 is as i a�F
cq
RSI N —1
.mm� � •a
Ois
ik
< c
m
aasni [1
LO
lit
M W�s�a
uj
LU
can {=j i % Fef d�•E 3-
tiCc
t
♦'m 0 9d{3 it i E as
ROCHESTER-OLMSTED PLANNING DEPARTMENT
2122 Campus Drive SE, Suite 100 • Rochester, MN 55904-4744
C O UK TV OF www,olmstedcounty.com/planning
TO: Rochester Common Council
FROM: Mitzi A. Baker, Senior Planner
DATE: December 13, 2006
.. :> L
airo? �nrn�
room 06
`.re,AF.. t
Rdef iff, down
RE: Final Plat #06-17 to be known as Rochester Towne Club Villas, by
Platinum Development Group. The plat proposes to subdivide
approximately 5.61 acres of land along the south side of
Eastwood Road SE, west of 40th Ave SE into 24 lots for residential
development and one Outlot.
Plannina Department Review:
ApplicanVOwner: Platinum Development Group
PO Box 44424
Minneapolis, MN 55344
Surveyors/Engineers: Yaggy Colby Associates
717 Third Ave SE
Rochester, MN 55904
Report Attachments: 1. Referral Comments
2. Location Map
3. Copy of Final Plat
Plat Data.
Location of Property:
The property includes approximately 5.61 acres of land along
the south side of Eastwood Road SE, west of 40"' Ave SE.
Zoning:
The property included in this Plat is zoned R•1 X (Mixed Single
Family Extra).
Proposed Development:
The applicant proposes to subdivide approximately 5.61 acres,
into 24 lots for residential development and one Outlot.
Wetlands:
A Wetland replacement plan has been approved for the
Rochester Towne Club project. This plan incorporates the
approved Wetland plan.
BUILDING CODE 507/285-8345 • GISIADDRESSINGIMAPPING 507/285-8232 • HOUSING/HRA 507/285-8224
PLANNINGIZONING 5071285-8232 • WELUSEPTIC 507/285-8345
FAX 507/287-2275
�'1b AN EOUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER
Page 2
December 73, 2006
Streets: There are no new roadways being dedicated with this Plat.
Internal roadways will be private. The Plat proposes to reserve
a portion of the right-of-way for a southern extension of 401h Ave
SE, south of Eastwood Road.
Removal of Trees/Brush: Tree/brush removal was done previously with site grading and
preparation.
Parkland Dedication: The Park and Recreation Department recommends that
dedication requirements be met via: Deferred dedication with
dedication to consist of the neighborhood park identified as
Outlot B Rochester Towne Club Village. By prior agreement,
parkland dedication for the Rochester Towne Club
development to be met via the exchange of current and
proposed golf course property and the dedication of Outlot B.
Dedication to occur when the park site is accessed via public
street or when the City wishes to begin development of the
park.
Preliminary Plat:
The preliminary plat for this property was approved in September subject to the following
conditions/modifications:
1. The applicant agrees that this subdivision will have an impact on the need for Parkland
and that the dedication requirements are outlined in the memorandum from the Park
and Recreation Department dated July 17, 2006.
2. Fire hydrants (not shown) are required along this plat. Due to the water main being
Installed within the boulevard area to minimize street reconstruction the hydrants wilt
need to be placed within the platted lots, just south of the sidewalk. Either utility
easement "bump -outs" or a wider front yard easement is required to accommodate the
hydrant placements.
3. Right-of-way dedication along the east side of Lot 24 shall be eliminated from this Plat,
unless the abutting portion is otherwise platted or dedicated or established by other
means.
4. The Plat shall be revised to dedicate access control along the entire east line of Lot 24,
Block f, and the easterly 50 feet.
5. The Plat shall be revised to widen the utility easement along the entire south line of
Eastwood Road from 10 feet to 15 feet.
Planning Staff and Recommendation:
Staff has reviewed this final plat for compliance with the applicable regulations and
recommends approval subject to the following conditions/modifications:
Page 3 J�q
December 13, 2006
1. Prior to recording the final plat documents, the applicant shall pay the E911
Addressing and GIS Impact fees, as outlined in the December 4, 2006 letter from the
Rochester Olmsted Planning Department GIS(Addressing division.
2. Dedication of a right-of-way easement Is required by separate document over the
entire area shown as Outlof "A ". This easement shall be recorded prior to recording
the Final Plat documents and shall be identified on the Plat.
3. Dedication of Access Control shall be identified along the entire east line of Lot24,
Block 1 and the easterly 50 feet of the north line of Lot 24, Block 1.
4. Parkland dedication requirements shall be met via: Deferred dedication with
dedication to consist of the neighborhood park identified as Outlot B Rochester
Towne Club Village. By prior agreement, parkland dedication for the Rochester
Towne Club development to be met via the exchange of current and proposed golf
course property and the dedication of Outlot B. Dedication to occur when the park
site is accessed via public street or when the City wishes to begin development of
the park as outlined In the December 5, 2006 memorandum from Rochester Park and
Recreation.
S. Prior to recording the final plat documents, the applicant shall pay the E911
Addressing and GIS Impact fees, as outlined in the June 7, 2006letter from the
Rochester Olmsted Planning Department G1S/Addressing division.
6. Parkland dedication requirements shall be met via deferred land dedication, as
specified in the June 9, 2006 memorandum from Rochester Park and Recreation.
7. The applicant agrees to dedicate right-of-way for the extension of Forest Knoll Drive
SE, adjacent to Block 1 with the plat for adjacent property to the south of said block.
ROCHESTER PARK AND RECREATION
DEPARTMENT
DATE: December 5, 2006
TO: Jennifer Garness
Planning
RE: Rochester Towne Club Villas
Final Plat #06-17
Acreageof plat.......................................................... 5.61 a
Number of dwelling units ............................................. NA
Density factor............................................................ .0244
The Park and Recreation Department recommends that dedication requirements
be met via: Deferred dedication with dedication to consist of the neighborhood
park identified as Outlot B Rochester Towne Club Village. By prior agreement,
parkland dedication for the Rochester Towne Club development to be met via the
exchange of current and proposed golf course property and the dedication of
Outlot B. Dedication to occur when the park site is accessed via public street or
when the City wishes to begin development of the park.
O:\Park Dedtcatjon=06ASE 2895\ROCHESTER TOWN CLUB VILLAS.DOC
Rochester -Olmsted Planning _apartment
GIS/Addressing Division
2122 Campus Drive SE, Suite 100
Rochester, MN 55904-4744
FINAL PLAT REFERRAL RESPONSE
DATE: December 4, 2006
TO: Jennifer Gamess, Stephanie Foster
FROM: Randy Growden
GIS/Addressing Staff
Rochester -Olmsted County
Planning Department
CC: Jan Chezick; Ed Kuisle, Peter Oetliker
RE: ROCHESTER TOWNE CLUB VILLAS
FINAL PLAT # 06-17
Phone: (507)285-8232
Fax: (507)287-2275
UPON REVIEW OF THIS PLAT THE FOLLOWING FEES ARE REQUIRED TO BE
PAID BEFORE THE PLAT CAN BE ADDRESSED.
E911 ADDRESSING FEE: $1920.00 (24 LOTS/ADDRESSES)
GIS IMPACT FEE: $ 775.00 (25 LOTS/OUTLOTS)
Notes: 1. Additional E911 Addressing fees may be required upon Site Plan review.
2. Final Plats must be approved and the above fees paid before application requests for
addressing can be submitted to the E911 Addressing Staff — Rochester/Olmsted
A review of the final plat has turned up the following ADDRESS or ROADWAY related issues:
1. Upon review of ROCHESTER TOWNE CLUB VILLAS the GIS / Addressing staff has found
no issues to bring forth at this time.
kOCHESTER
Mz111L
TO: Consolidated Planning Department
2122 Campus Drive SE
Rochester, MN 55904
FROM: Mark E. Baker
DATE: 1217/06
DEPARTMENT OF PUBLIC
WORKS
201 4" Street SE Room 108
Rochester, MN 55904-3740
507-287-7800
FAX — 507-281-6216
The Department of Public Works has reviewed the application for Final Plat #06-17, for the
proposed Rochester Towne Club Villas development. The following are Public Works comments
on this request:
1. A Development Agreement has been executed for this Property and all development
is subject to the terms of the Agreement.
2. Dedication of a right -of --way easement is required by separate document over the
entire area shown as Outlot `A'. This easement is to be recorded prior to recording
the Final Plat so that it can be shown on the Final Plat document.
3. Dedication of Controlled Access is required on the Final Plat, along the entire east
line of proposed Lot 24, Block 1, abutting 400'Ave SE (to be dedicated via separate
right-of-way easement) and the easterly 50 ft of the north line of said Lot 24
extending from the 40th Ave SE right-of-way.
Development Chargestfees applicable to the development of this property are/will be
addressed in the Development Agreement and City -Owner Contract
C:1Documents and SettingsNplastost\Local Settings\Temporary Internet Files10DC1 C\FPD6.17 Rochester Towne Club
Villas.doc
Dec 14 2006 7:59FM MN/DDT
507-285-7279 P.2
JA3
,Ws V4-- Minnesota Department of Transportation
]Minnesota Department of Transportation - District 6
2900 48'" Street N.W. Office Tel: 507-280-3188
Rochester, MN 55901-5848 Fax: 507-285-7279
E-mail: chris.moates@dotstatc.mn.us
December 13, 2006
Jennifer Garness
Rochester Olmsted Planning Department
2122 Campus Drive SE — Suite 100
Rochester, MN 55904
RE: Final Plat 06-17 to be known as Rochester Towne Club Villas, by
Platinum Development Group. The plat proposes to subdivide
approximately 5.61 acres of land along the south side of Eastwood Road
SE, west of 40"' Avenue SE into 24 lots for residential development and
one Outlot.
US 14 CS 5503
Dew Ms. Gamess:
Minnesota Department of Transportation (Mn/DOT) District 6 staff has reviewed the
Final Plat for Rochester Towne Club Villas. Currently, Mn/DOT and the City of
Rochester are in the early stages of developing a partnership agreement that will
address ongoing and future operational concerns on US 14, including the need for a
westbound acceleration lane at 40'h Avenue SE. These concerns are amplified with
area developments that funnel traffic towards the 400' Avenue SE intersection with US
14. Otherwise Mn/DOT has no further comment with this particular development.
Thank you for providing Mn/DOT the opportunity to comment. If there are any
questions, you may contact Peter Wasldw, Principal Planner, at (507) 285-7369 or
Debbie Persoon-Bement, Transportation Specialist at (507) 281-7777.
Sincerely,
Chris Moates
District 6 Planning Director
cc: Richard Freese, Director of Public Works
Neh-ae Succio
Greg Paulson
Michael Schweyen
Michael Kempinger
Rhonda Prestegard
Tom Streiff
Peter Waskiw
Debbie Persoon-Bement
File
ooc-Aszsoza
MEETING ins
REQUEST FOR COUNCIL ACTION
DATE: 12/18/06
GENOA SECTION:
ORIGINATING DEPT:
ITEM NO.
ESOLUTIONS AND ORDINANCES
CITY ATTORNEYS OFFICE
G
ITEM DESCRIPTION:
PREPARED BY:
RESOLUTIONS AND ORDINANCES
TERRY ly ADKINS
T G+�
G. 1. RESOLUTIONS
G. 2. FIRST READING OF ORDINANCES, as appropriate.
G. 3. SECOND READING OF ORDINANCES (for adoption).
�a) An Ordinance Amending The Floodway And Floodprone District Boundaries Relating To A Portion Of
Property Located South Of 4e Street S.W., West Of Highway 63 And East Of I I1h Avenue S.W.
An Ordinance Rezoning 4.01 Acres Of Land From The I Zoning District To The M-1 Zoning District, And
Amending Ordinance No. 2785, Known As The Zoning Ordinance And Land Development Manual of The
City Of Rochester, Minnesota. Said property is located between Bear Creek and Marion Road S.E., and
north of 2430 Marion Road S.E.
G.4. MISCELLANEOUS
COUNCIL ACTION: Motion by: Second by: to: