HomeMy WebLinkAboutResolution No. 167-16 - RPU.SecurityLightRates16RESOLUTION
BE IT RESOLVED by the Common Council of the City of Rochester that the Common
Council concurs in the resolution of the Rochester Public Utility Board appended hereto, which
resolution requests approval for the City to approve the updated RPU rate schedule with the
addition of the LED security light rates. See attached rate schedule.
PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF
ROCHESTER, MINNESOTA, THIS
ATTEST:
CITY CLERK
DAY OF , 2016.
PRESIDENT OF SAID COMMON COUNCIL
APPROVED THIS DAY OF , 2016.
MAYOR OF SAID CITY
(Seal of the City of
Rochester, Minnesota)
res. pu\SecurityLightRates.16
A "olOVAMOK
BE IT RESOLVED by the Public Utility Board and the City Council of the City of Rochester,
Minnesota, to approve the u�pdated
MCI ilifflill 11111 1 �! E l�J I 'Jill
Passed by the Public Utility Board of the City of Rochester, Minnesota, this 29th day of March,
201&
President
Secretary
ROCHESTER PUBLIC UTILITIES RATE SCHEDULE SL
(RPU) SHEET 1 OF 2
SECURITY LIGHTING
AVAILABILITY:
At all locations whenever the service can be provided with overhead wiring on an existing RPU owned
pole.
APPLICATION:
To all classes of customers contracting for security lighting.
RATE:
Mercury Vapor Lights (Closed)
Monthly Charge
Size
2015
2016
2017
175 Watt Mercury Vapor
$ 9.90
$10.30
$10.50
250 Watt Mercury Vapor
$12.55
$12.70
$12.85
400 Watt Mercury Vapor
$16.60
$17.50
$18.25
High Pressure Sodium Vapor Lights (Closed)
Size
2015
2016
2017
70 Watt
$ 9.09
$ 9.09
$ 9.15
100 Watt
$10.82
$10.82
$10.90
150 Watt (Roadway)
$12.05
$12.05
$12.25
250 Watt
$15.19
$15.19
$15.25
400 Watt
$18.90
$19.80
$20.00
Light Emitting Diode (LED) Lights
Size
2015
2016
2017
LED Area Light
N/A
10.82
10.90
LED Roadway Light
N/A
15.19
15.25
PAYMENT:
Bills will be rendered monthly; payments are due on or before the due date.
CONDITIONS OF DELIVERY:
1. RPU will furnish, install, own, and maintain a standard lighting unit consisting of a luminaire, complete
with lamp and control device wired for operation, supported by a bracket mounted on an RPU owned
pole, and will supply all electrical energy necessary for the operation of the unit.
2. When RPU does not have a suitable pole or secondary service available at the desired location and it is
necessary to install a transformer or a pole or to extend secondary lines a distance greater than 150 feet,
the customer shall pay RPU the actual costs for installing the transformer or pole and/or making such
line extensions.
3. Service under this rate is not available underground or in underground areas unless the customer pays
RPU the complete cost of the necessary underground facilities.
4. Lamps will automatically be switched on approximately 30 minutes after sunset and off 30 minutes
before sunrise, providing dusk to dawn operation of approximately 4,200 hours per year.
5. RPU will make every attempt to replace inoperative lamps and maintain luminaries during regular
daytime work hours within 3 working days after notification by the customer. No credit will be
allowed for periods during which the lamp was out of service.
6. RPU will, at the customer's expense, relocate or change the position of any lamp or pole as requested in
writing by the customer.
ROCHESTER PUBLIC UTILITIES RATE SCHEDULE SL
(RPU) SHEET 2 OF 2
SECURITY LIGHTING (Cont.)
CONDITIONS OF DELIVERY:
7. Service furnished under this rate is subject to applicable provisions of RPU's published Electric Service
Rules and Regulations.
8. RPU shall not be liable for any damage or loss sustained by customer resulting from interruptions,
deficiencies, or imperfections of service provided under this rate.
Approved by Rochester Public Utility Board: April 26, 2016
Effective Date: June 1, 2016