HomeMy WebLinkAboutResolution No. 186-15 - 501LLC.Incendev.15-002.prelimRESOLUTION WHEREAS, 501 1st, LLC ("Applicant") applied for a Type III, Phase II Incentive Development Preliminary Plan (#R2015-002CUP) to permit the construction of a five -story, 84- unit, mixed use development with the first floor commercial and upper floors residential. The property is located along the south side of Fifth Street S.W., and east of Second Avenue N.W.; and, WHEREAS, the legal description for the property affected by the application is as follows: Lots 5, 6, 7, & 8 Block 1 Original Plat of Rochester; and, WHEREAS, the project is being proposed through the Incentive Development Conditional Use Permit process because the development seeks a higher intensity development than otherwise permitted; and, WHEREAS, R.C.O. §62.630 sets forth the criteria for incentive developments; and, WHEREAS, based upon section 62.630, the Planning Department Staff recommended the following findings of fact as to the Incentive Development application: Preliminary Development Plan Criteria: A. Suitability of the Area: The proposed site is suitable as the location for an Incentive Development. The proposed uses are compatible with the existing land uses in the area. B. Site Design Criteria- (1) Capacity of Public Facilities: Utilities exist adjacent to this project. Some utilities will need to be modified (i.e. water and electric) to accommodate this development. The applicant will need to coordinate these modifications or improvements with the appropriate agencies. (2) Geologic Hazards: Not applicable. (3) Natural Features: Not applicable. (4) Traffic Generation Impact -The anticipated traffic will not cause the capacity of the adjacent roadways to be exceeded. The proposed underground parking exceeds the requirements for parking for the residential use on the site. The development includes a surface parking area to the south of the project and metered on street parking to further serve the commercial uses of the project. Both the commercial and residential parking provided exceeds that required in the Downtown Parking Overlay Zone (DPOZ). The removal of the parking lot north of the Metropolitan Marketplace building does not affect the parking for the Marketplace building or its uses, as the surface parking lot was not required in parking calculations for Metropolitan Marketplace application (R2011- 030CUP). Matters pertaining to alley circulation and safety will need to be addressed through discussions with City of Rochester Public Works Department. Sixth Street SW is designated as a Secondary Urban Arterial on the Functional Designation Map of the 2040 Long Range Transportation Plan. Within the Downtown Master Plan, 1st Ave SW is designated as a Main Street and 2nd Ave SW is designated as a Bike Street/Complete Street. Access to the underground parking facility will be via 2nd Avenue SW. The applicant will need to work with the City to resolve issues related to specific development obligations related to on street parking and use of the existing alley prior to submitting the Final Development Plan application. (5) Height Impacts: The proposed building is 5 stories in height and approximately 65 feet above grade at the highest point. The building steps down to 4 stories where it meets the Metropolitan Marketplace. The project is bordered by streets to the west, north, and east which have a minimum of a 75 foot right-of-way. The proposed building will not obstruct sunlight from any existing uses or buildings located to the north of the development site. Though some shading will occur to the Metropolitan Marketplace building; this effect will be restricted to summer evenings for approximately four months of the year. The building principally faces north and south, which does not affect the outlook from the neighboring building to the south, which is principally east and west. The building is consistent with the implementation of the Main Street/mixed use district of the Downtown Master Plan which promotes 3 to 4 story buildings along 1st Avenue SW. (6) Setbacks: Within the CDC —Fringe district the minimum building setback is zero feet. Portions of the building encroach into the public right-of-way; therefore the developer will require a revocable permit for these encroachments. The project is a 5 story building that steps back at the fifth floor along 1st Avenue and around the corner for a portion of the 5th Street SW facade, in line with the 2 Urban Village Design Guidelines. The project also includes setbacks to accommodate space for additional metered street parking and landscaping within the public right-of-way. The main facade of the building is setback 3.5' along 5th Street SW to allow for development of streetscape in compliance with city standards. The main west facade along 2nd Ave SW is set back approximately 1.5' to allow streetscape development. (7) Internal Site Design: The orientation of the building has the main entrance at the intersection of two roadways which helps define the presence for the building at this location. The project maintains an open facade along 5t" Street SW through the use of windows, canopies, and recessed balconies. The location of the surface parking area to the rear of the site, accessed via the alley, complies with provisions of the Downtown Overlay Parking Zone. Balconies and the rooftop terrace on the south of the building take advantage of solar gain through a south -facing orientation. (8) Screening and Buffering: The orientation and layout of the building provides for adequate screening of residential units and protection of neighbor amenity. Parking lot landscaping of the rear parking lot is consistent and compliant with Ordinance standards. The trash area is internally located and adequately screened. (9) Ordinance Requirements: The proposed parking for the project complies with the Downtown Parking Overlay District zoning standards. The proposed landscaped area complies with the CDC — Fringe zoning requirements. The required recreation space can be reduced by 75% since the project is located within '/4 mile of a city park (Soldiers Field). The proposed recreation space complies with the zoning standards. The applicant must receive adequate permissions from the City of Rochester Public Works Department regarding encroachments into the right-of-way and over the public right-of-way alley. Other city obligations must be met through application and liaison with relevant agencies. Also, through the Incentive Development application, the applicant is requesting to exceed the density per acre allowed in the CDC — Fringe. (10) Non -Vehicular and Alternate Modes of Travel: Pedestrian - oriented space is incorporated into the streetscape design along the project frontages and through use of canopied building openings. Bicycle parking is provided on the site - within the residential building, in the below grade parking facility, and in the right-of-way. This development is within '/4 mile of 2nd Street SE 3 which functions as a bus transit hub. (11) Properties located in planning area for which a detailed Master Plan has been adopted by the Council. The Downtown Master Plan was adopted by the City Council in January of 2011. The Master Plan identifies this area, known as the Main Street Mixed Use District, as a primary development location. The proposed 501 on 1st project fulfills many of the goals of the Downtown Master Plan such as incorporation of mixed uses, appropriate building height, mixed material facade design, and active streetscape elements. The reduction of parking in this project allows for ample landscaping of the site which will enhance and maintain neighborhood amenity and character. The proposed development is consistent with the Downtown Mater Plan by incorporating pedestrian -oriented amenities like connectivity to neighboring developments and incorporation of a mix of uses like retail, restaurant, and residential within the building contributing to a more active downtown. Bump -outs at the end of each block provide additional space within the pedestrian zone between the building edge and curb. Abundant trees with space for tables and seating placed between them accommodate outdoor dining for the restaurant located on the corner of 5t" Street SW and 1st Avenue SW. Urban Village Design Guidelines: The Urban Design Guidelines were developed by a Rochester Downtown Alliance subcommittee in 2009 that received staff support from the Planning Department. The City Council instructed staff to use the Design Guidelines in evaluating development projects. The proposal includes an increased setback for the facade along 1st Avenue SW on the 5t" story (a primary pedestrian corridor in the Urban Village) in line with the Urban Village Design Guidelines. The development also complies with the Guidelines through emphasis on ground level retail and dining, mixed use development (residential and commercial), and promotion of a walkable, urban lifestyle. Complete Streets Policy: The Complete Streets Policy was adopted by the City of Rochester in 2009. It is a policy which encourages multi -modal transport and ensures appropriate design of roads, paths, and linkages throughout the city. The development complies with the objectives of the Complete Streets Policy which is to improve the access and mobility for all users of streets in the community by improving safety through reducing conflict and encouraging non -motorized transportation and transit. 4 Downtown Parking Overlay Zone (DPOZ): The Downtown Parking Overlay Zone (DPOZ) identifies and more easily defines the uniquely situated and expanding areas around the Central Business District that have a high level of proximity to both publically provided transportation facilities, public parking facilities, metered street parking and to the major downtown employment centers that provide off-street employee parking. At these locations, private off-street parking requirements are regulated differently than in other parts of the City. The specific provisions of the DPOZ reduce the predominance of off-street parking as a land use in the fringe area of the downtown and release more land for redevelopment; enhance the economic viability of preserving existing useful buildings and help create mixed -use buildings; increase the resident population near existing downtown jobs and amenities and promote a safer, pedestrian -friendly, active street level environment. The proposed development meets the parking requirements within the DPOZ for both the residential and commercial uses proposed; and, WHEREAS, the Planning Department Staff recommended the following conditions of approval if the Incentive Development application were approved- 1 . The Final Development Plan application shall include: A. Revised Building Elevations that identify dimensions, building materials, colors and type of glass; B. Additional details for the canopies and any proposed awning, including materials, colors, and elevations; C. Details for the exterior lighting on the building and in the public right- of-way; D. Additional details for the streetscape, including paving materials, colors, and elevations; E. Submission of a detailed landscaping plan; F. A sign plan if signs are proposed for public safety or directional purposes; G. Additional detail for the balconies and terraces, including materials and finishes and conformance with the Building Code; 5 H. Additional details showing function of off-street loading and trash removal and snow storage/removal; and, A shadow impact diagram showing any shadowing effects on adjacent property. 2. Planning staff recommends that the developer consider removal of the surface parking area to the rear of the building in order to reduce the likelihood of traffic congestion in this area. The surface parking area could be replaced with a patio or landscaped area for tenant usage. 3. Grading and drainage plan approval is required for this application. 4. The developer will be required to execute a City prepared Agreement to address the developer's obligations related to reconstruction of the alley as a bridge design approved by the City. The Agreement will also address the developer's obligations related to construction/payment for improvements to 5t" Street SW and 2nd Avenue SW, streetscape improvements, and for relocation/abandonment of any existing utilities within the alley. 5. Revocable permits or other permissions will be required for all canopies, overhangs, and any other encroachments over the public right-of-way. 6. Execution of a City -Owner Contract is required prior to construction/reconstruction of public infrastructure to serve this development. Any proposed public improvements lying within Owners private property will require dedication of public easements prior to construction. 7. Development charges/obligations applicable to the development of this property include: A. Sanitary Sewer Availability Charge (SAC) B. Water Availability Charge (WAC) C. Storm Water Management Plan Area Charge (SWMPAC) for any net increase in impervious surface D. Reconstruction of pedestrian facilities/pedestrian ramps E. Plant Investment Fee (PIF) collected for individual lots at the time of 6 building permit issuance 8. The water service for the building must be shown on the final plan in an approved location and coordinated with the reconstruction of Fifth Street S.W., project. 9. Any old water services found along either 1st or 2nd Avenues SW adjacent to this project must be disconnected at the main in the street and the curb box removed per RPU requirements. 10. An adequate water supply shall be provided for fire protection including hydrants properly located and installed in accordance with the specifications of the Water Division. Hydrants shall be in place prior to commencing building construction. 11. All street, directional and fire lane signs must be in place prior to occupancy of any buildings. 12. The applicant shall comply with Section 63.265, subd. 8, related to Boulevard Tree Requirements. 13. Park dedication will be required if the property proceeds through a land subdivision process to create individual parcels. Private parkland is required in conjunction with this project. 14. As part of the Building Permit process, the neighboring building will need to be reviewed and verified that it is capable of supporting any additional snow drift or snow sliding loads. 15. The height of the structure above the public right-of-way alley will need to meet the minimum requirements of the International Building Code Chapter 32 and other requirements of the Rochester Public Works Department. 16. The below grade parking structure will need to be designed to accommodate the required traffic and other live loads imposed on the structure. The utilities located in the alley are not permitted to run through the proposed building/parking garage. 17. The property shall be re -platted into one lot through the platting process; and, 18. The Council's actions in approving this development occur in response to the applicant's or his/her representative's oral and written representations as to the appearance of the building design, exterior fagade, and landscaping. As such, the applicant must not deviate from the appearance of the building design, exterior fagade and landscaping as originally presented to the Council without the Council's prior approval. WHEREAS, on February 25, 2015, the Planning and Zoning Commission held a public hearing on this Incentive Development Preliminary Plan, reviewed the application according to the requirements of section 62.630, adopted the Planning Department's recommended findings of fact, and recommended approval of the application subject to the following 20 conditions of approval- 1 . The Final Development Plan application shall include: A. Revised Building Elevations that identify dimensions, building materials, colors and type of glass; B. Additional details for the canopies and any proposed awning, including materials, colors, and elevations; C. Details for the exterior lighting on the building and in the public right- of-way; D. Additional details for the streetscape, including paving materials, colors, and elevations; E. Submission of a detailed landscaping plan; F. A sign plan if signs are proposed for public safety or directional purposes; G. Additional detail for the balconies and terraces, including materials and finishes and conformance with the Building Code; H. Additional details showing function of off-street loading and trash removal and snow storage/removal; and, I. A shadow impact diagram showing any shadowing effects on adjacent property. 2. Planning staff recommends that the developer consider removal of the surface parking area to the rear of the building in order to reduce the likelihood of traffic congestion in this area. The surface parking area could be replaced with a patio or landscaped area for tenant usage. 3. Grading and drainage plan approval is required for this application and the developer provide high-level construction phasing plan. 4. The developer will be required to execute a City prepared Agreement to 8 address the developer's obligations related to reconstruction of the alley as a bridge design approved by the City. The Agreement will also address the developer's obligations related to construction/payment for improvements to 5t" Street SW and 2nd Avenue SW, streetscape improvements, and for relocation/abandonment of any existing utilities within the alley. The developer will provide a drawing showing the existing site utility locations and a plan showing relocation and abandonment of any utilities. 5. Revocable permits or other permissions will be required for all canopies, overhangs, and any other encroachments over the public right-of-way. 6. Execution of a City -Owner Contract is required prior to construction/reconstruction of public infrastructure to serve this development. Any proposed public improvements lying within Owners private property will require dedication of public easements prior to construction. 7. Development charges/obligations applicable to the development of this property include: A. Sanitary Sewer Availability Charge (SAC) B. Water Availability Charge (WAC) C. Storm Water Management Plan Area Charge (SWMPAC) for any net increase in impervious surface D. Reconstruction of pedestrian facilities/pedestrian ramps E. Plant Investment Fee (PIF) collected for individual lots at the time of building permit issuance 8. The water service for the building must be shown on the final plan in an approved location and coordinated with the reconstruction of Fifth Street S.W., project. 9. Any old water services found along either 1st or 2nd Avenues SW adjacent to this project must be disconnected at the main in the street and the curb box removed per RPU requirements. 10. An adequate water supply shall be provided for fire protection including hydrants properly located and installed in accordance with the specifications of the Water Division. Hydrants shall be in place prior to commencing building construction. 9 11. All street, directional and fire lane signs must be in place prior to occupancy of any buildings. 12. The applicant shall comply with Section 63.265, subd. 8, related to Boulevard Tree Requirements as well as Urban Village Design guidelines for canopy trees and structural soil standards. 13. Park dedication will be required per City Ordinance. 14. As part of the Building Permit process, the neighboring building will need to be reviewed and verified that it is capable of supporting any additional snow drift or snow sliding loads. 15. The height of the structure above the public right-of-way alley will need to meet the minimum requirements of the International Building Code Chapter 32 and other requirements of the Rochester Public Works Department. 16. The below grade parking structure will need to be designed to accommodate the required traffic and other live loads imposed on the structure. The utilities located in the alley are not permitted to run through the proposed building/parking garage. 17. The property shall be re -platted into one lot through the platting process. 18. The Council's actions in approving this development occur in response to the applicant's or his/her representative's oral and written representations as to the appearance of the building design, exterior fagade, and landscaping. As such, the applicant must not deviate from the appearance of the building design, exterior fagade and landscaping as originally presented to the Council without the Council's prior approval. 19. The developer shall comply with Section 62.630, subd. 2(B)(5)(b) by opening the access to the alley which currently block views to downtown. 20. Access to underground parking shall be maintained off the alley and not off of Second Avenue S.W.; and, WHEREAS, on March 16, 2015, the Common Council held a public hearing on the Incentive Development Preliminary Plan (#R2015-002CUP), and gave all interested persons the opportunity to make presentations and give testimony concerning the application; and, WHEREAS, at the March 16t" public hearing, the Applicant's representative agreed with all of the Planning Commission's recommended conditions of approval except for conditions #19 and 10 #20; and, WHEREAS, the Council continued the March 16t" public hearing to April 20, 2015. Between the two public hearings, the Council spent approximately five hours considering this application and the testimony provided by interested parties; and, WHEREAS, on April 20, 2015, the Common Council held a public hearing on the Incentive Development Preliminary Plan (#R2015-002CUP), and gave all interested persons the opportunity to make presentations and give testimony concerning the application; and, WHEREAS, at the April 20t" public hearing before the Common Council, attorney Brian Childs, representing the People's Food Cooperative, Inc., and Metropolitan Market Place, LLC, appeared and testified as follows: A. Based upon the following grounds, the Urban Village Design Guidelines ("Guidelines") have been incorporated into the Rochester Downtown Master Plan which, in turn, has been incorporated into the City's Comprehensive Plan: 1. On August 3, 2009, during the Common Council's Committee of the Whole meeting, the Council requested the Guidelines be incorporated into the City's Downtown Master Plan. 2. The Guidelines did find their way into the Downtown Master Plan as the latter refers to recommendations found in the Guidelines, describes the development of First Avenue S.W., as an "urban village," mentions an "urban village zone," mentions the University of Minnesota Rochester's presence in the "urban village area," acknowledges the fact that First Avenue defines the start of an "Urban Village district," and addresses the City's "Urban Village concept." B. The proposed development does not satisfy the Guidelines. The proposed development's fagade above the fourth floor is not set back from the right of way line of any public or private street a distance of at least one foot for every one foot of building floor height. The proposed development would span the public alley resulting in obstruction of the alley's view corridor. The proposed development's wall -mounted hearing and cooling units are inconsistent with the Guidelines' emphasis on high quality architectural elements. C. The Metropolitan Market Place and People's Food Cooperative were required to comply with the Guidelines as part of the City's request for proposals for the redevelopment of the former Minnesota Energy site at the corner of First Avenue S.W., and Sixth Street S.W. The proposed development should be held to the same standard. 11 D. The proposed development does not satisfy the criteria found in R.C.O. §62.630, subd. 2(B). The proposed development's height and placement is incompatible with surrounding development by destroying views from the primary exposures of adjacent residential dwellings. The proposed alley span would prevent the proposed development from achieving appropriate building separation; and, WHEREAS, at the April 20t" public hearing before the Common Council, attorney Mark Utz, representing the proposed development, appeared and testified as follows: A. The Guidelines were never formally incorporated into the City's Comprehensive Plan. To date, there is no city ordinance in place that creates an urban village overlay zoning district. B. Although it is not required to do so, the proposed development has attempted to incorporate the Guidelines wherever possible. Adherence to some of the Guidelines, however, would make the proposed development infeasible. C. Several recent development projects in the proposed urban village zone, including 318 Commons, the H3 Plaza, and the Metropolitan Market Place, were not required to comply with the Guidelines' setback requirement. And, all of these projects had significant public assistance to help with the cost of development. D. The spanning of the alley between First and Second Avenues does not result in a destruction of a significant view corridor; and, WHEREAS, at the April 20t" public hearing before the Common Council, the City Attorney stated that it is his practice to prepare a formal resolution for the Mayor and Common Council's consideration and use when making a change to or incorporating a new provision into the City's Comprehensive Plan. After checking his computer files, he was unable to locate any formal resolution that incorporated the Guidelines into the City's Comprehensive Plan. After checking with the City Clerk, he was told the City Clerk was unable to locate any formal resolution that incorporated the Guidelines into the City's Comprehensive Plan; and, WHEREAS, at the April 20t" public hearing before the Common Council, the City Attorney stated the mere mention of the Guidelines or references within the City's Downtown Master Plan to an urban village, urban village zone, urban village area, urban village district, or an urban village concept was insufficient to conclude the Council had formally adopted the Guidelines into the Downtown Master Plan; and, WHEREAS, based upon a substantial amount of all of the evidence and testimony submitted during the March 16t" and April 20t" public hearings, the Council accepts the Planning and Zoning Commission's recommended findings of fact and adopts them as its own. The Council 12 finds that the proposed development satisfies the applicable review criteria found at R.C.O. §62.630, subd. 2 if the applicant satisfies the following 17 conditions- 1 . The Final Development Plan application shall include: A. Revised Building Elevations that identify dimensions, building materials, colors and type of glass; B. Additional details for the canopies and any proposed awning, including materials, colors, and elevations; C. Details for the exterior lighting on the building and in the public right- of-way; D. Additional details for the streetscape, including paving materials, colors, and elevations; E. Submission of a detailed landscaping plan; F. A sign plan if signs are proposed for public safety or directional purposes; G. Additional detail for the balconies and terraces, including materials and finishes and conformance with the Building Code; H. Additional details showing function of off-street loading and trash removal and snow storage/removal; and, A shadow impact diagram showing any shadowing effects on adjacent property. 2. Grading and drainage plan approval is required for this application and the developer provide high-level construction phasing plan. 3. The developer will be required to execute a City prepared Agreement to address the developer's obligations related to reconstruction of the alley as a bridge design approved by the City. The Agreement will also address the developer's obligations related to construction/payment for improvements to 5t" Street SW and 2nd Avenue SW, streetscape improvements, and for relocation/abandonment of any existing utilities within the alley. The developer will provide a drawing showing the existing site utility locations and a plan showing relocation and abandonment of any utilities. 4. Revocable permits or other permissions will be required for all canopies, 13 overhangs, and any other encroachments over the public right-of-way. 5. Execution of a City -Owner Contract is required prior to construction/reconstruction of public infrastructure to serve this development. Any proposed public improvements lying within Owners private property will require dedication of public easements prior to construction. 6. Development charges/obligations applicable to the development of this property include: A. Sanitary Sewer Availability Charge (SAC) B. Water Availability Charge (WAC) C. Storm Water Management Plan Area Charge (SWMPAC) for any net increase in impervious surface D. Reconstruction of pedestrian facilities/pedestrian ramps E. Plant Investment Fee (PIF) collected for individual lots at the time of building permit issuance 7. The water service for the building must be shown on the final plan in an approved location and coordinated with the reconstruction of Fifth Street S.W., project. 8. Any old water services found along either 1st or 2nd Avenues SW adjacent to this project must be disconnected at the main in the street and the curb box removed per RPU requirements. 9. An adequate water supply shall be provided for fire protection including hydrants properly located and installed in accordance with the specifications of the Water Division. Hydrants shall be in place prior to commencing building construction. 10. All street, directional and fire lane signs must be in place prior to occupancy of any buildings. 11. The applicant shall comply with Section 63.265, subd. 8, related to Boulevard Tree Requirements as well as Urban Village Design Guidelines for canopy trees and structural soil standards. 12. Park dedication will be required per City ordinance. 14 13. As part of the Building Permit process, the neighboring building will need to be reviewed and verified that it is capable of supporting any additional snow drift or snow sliding loads. 14. The height of the structure above the public right-of-way alley will need to meet the minimum requirements of the International Building Code Chapter 32 and other requirements of the Rochester Public Works Department. 15. The below grade parking structure will need to be designed to accommodate the required traffic and other live loads imposed on the structure. The utilities located in the alley are not permitted to run through the proposed building/parking garage. 16. The property shall be re -platted into one lot through the platting process. 17. The Council's actions in approving this development occur in response to the applicant's or his/her representative's oral and written representations as to the appearance of the building design, exterior fagade, and landscaping. As such, the applicant must not deviate from the appearance of the building design, exterior fagade and landscaping as originally presented to the Council without the Council's prior approval; and, WHEREAS, based upon a substantial amount of all of the evidence and testimony submitted during the March 16t" and April 20t" public hearings, the Council concludes that the Guidelines were never formally incorporated into the City's Downtown Master Plan. There is no formal Council resolution in place that accomplishes this task. The mere mention of word phrases within the Master Plan, such as urban village, urban village zone, urban village area, urban village district, or an urban village concept, are insufficient to transform a set of guidelines informally discussed at the Common Council Committee of the Whole meeting into a formal memorialization of municipal action by which the City officially adopted the guidelines as part of its zoning regulations; and, WHEREAS, based upon a substantial amount of all of the evidence and testimony submitted during the March 16t" and April 20t" public hearings, the Council concludes that the fact that the Guidelines were used by the City to review and analyze competing development proposals seeking to redevelop the former Minnesota Energy site does not cause those Guidelines to be officially adopted as part of the City's zoning regulations. Criteria to be considered in reviewing competing redevelopment proposals do not constitute zoning regulations criteria to be employed in reviewing an incentive development land use application; and, WHEREAS, based upon a substantial amount of all of the evidence and testimony submitted during the March 16t" and April 20t" public hearings, the Council concludes that no evidence has been presented to it showing that the Council has formally adopted the Guidelines as part of, or formally incorporated the Guidelines into, the City's Comprehensive Plan. 15 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Rochester that it adopt the Planning and Zoning Commission's findings of fact, and that the Incentive Development Preliminary Plan (#R2015-002CUP) requested by 501 1st LLC is granted subject to the 17 conditions of approval described above. 16 PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF ROCHESTER, MINNESOTA, THIS DAY OF , 2015. ATTEST: PRESIDENT OF SAID COMMON COUNCIL CITY CLERK APPROVED THIS DAY OF .2015. (Seal of the City of Rochester, Minnesota) Zone15\lncendev.15-002. prelim MAYOR OF SAID CITY 17