HomeMy WebLinkAboutResolution No. 305-15 - IncentiveDevFinalPlan.R2015015CUP.501FirstLLCRESOLUTION WHEREAS, 501 on 1", LLC, applied for an Incentive Development Final Plan (#R2015- 015CUP) to permit the construction of a five -story, 84-unit mixed use development with the first floor commercial and the upper floors residential. The property is located along the south side of Fifth S.W., and east of Second Avenue N.W.; and, WHEREAS, R.C.O. § 62.630 provides the criteria for incentive developments against which this application must be analyzed; and, WHEREAS, on May 27, 2015, the Rochester Planning and Zoning Commission held a public hearing on this final plan, reviewed the application according to the criteria in R.C.O. § 62.630(2), and suggested the following findings of fact: Final Development Plan Criteria: a) Public Facility Design: The design of private and public utility facilities meet the requirements and specifications which the applicable utility has adopted. b) Geologic Hazard: There are no known geologic hazards related to this project. c) Access Effect: Ingress and egress points have been designed and located so as to minimize traffic impacts, especially through the reduction in curb cuts and widening of the sidewalk/amenity space on 2nd Ave SW. Access for delivery and service vehicles will be taken from the alley public right-of-way. Coordination is encouraged with adjacent uses for deliveries to the alley in order reduce congestion of the alley. Access locations and use/span of the alley have been preliminarily reviewed by City of Rochester Public Works Department. d) Pedestrian Circulation: Pedestrian -oriented space is incorporated into the streetscape design along the project frontages and through use of canopied building openings. The developer has enhanced pedestrian space through the widening of sidewalks along 2nd Ave SW, inclusion of a 4 foot wide protected pedestrian sidewalk and lighting/windows through the alley span, inclusion of blade signage, the addition of a canopy over the 2nd Ave SE entrance, and use of sloped canvas awnings along the 5t" Street SE frontage. 1 e) Foundation and Site Plantings: A detailed landscape plan for the site has been prepared which indicates the finished site will be consistent with the landscape character of the surrounding area. Landscaping will be installed throughout the site and along the site perimeters, including increased amenity space along 2nd Ave SW. Plantings consist of trees, shrubs, grasses, and annuals/perennials. The developer proposes use of permeable paving and colored pavers to enhance the pedestrian space. f) Site Status: Adequate measures have been taken to ensure the future maintenance and ownership pattern of the project, including open space and accessibility through the site. Evidence needs to be submitted indicating that a final plat has been recorded and required permissions have been obtained for the alley span and any encroachments into the public right-of-way. g) Screening and Bufferyards: The orientation and layout of the building provides for adequate screening of residential units and protection of neighbor amenity. Parking lot landscaping of the rear parking lot is consistent and compliant with Ordinance standards. The trash area is internally located and adequately screened. h) Final Building Design: The final building design is consistent with the principles identified in preliminary development plan relative to Height Impact, Setbacks, and Internal Site Design. The developer has submitted a Shadow Impact Diagram for the shortest and longest days of the calendar year which demonstrates that the height impact will be most prevalent to the north of the property (to the public right-of-way and the Premier Bank building), away from neighboring residential uses. Detailed building design and materials are shown in the submitted final plan drawings. i) Internal Circulation Areas: Plans for off-street parking and loading areas and circulation aisles to serve these areas meet the requirements of the Ordinance. The number of parking spaces proposed meets the requirements for calculations within the Downtown Parking Overlay District. j) Ordinance Requirements: The proposed parking for the project complies with the Downtown Parking Overlay District zoning standards. The proposed landscaped area complies with the CDC -Fringe zoning requirements. The required recreation space can be reduced by 75% per Section 62.727(1) since the development is within '/4 mile of a city park (Soldiers Field). The proposed recreation space complies with zoning standards. The applicant must receive adequate permissions from the 2 City of Rochester Public Works Department regarding encroachments into the right-of-way and over/under the public right-of-way alley. Other city obligations must be met through application and liaison with relevant agencies. Also, through the approval of Incentive Development application R2015-002CUP, the applicant received permission to exceed the density per acre allowed in the CDC -Fringe. k) Non -Vehicular and Alternate Modes of Travel: Pedestrian -oriented space is incorporated into the streetscape design along the project frontages and through use of canopied building openings. Bicycle parking is provided on the site - within the residential building, in the below grade parking facility, and in the right-of-way. This development is within '/4 mile of 2nd Street SE which functions as a bus transit hub. The development is well served by public transit (Routes 7 and 7A run on 2nd Ave SW; and routes 4B and 14 run on South Broadway). The development is also in a walkable area, close to downtown shops and amenities. The development is located in close proximity to the bike path network which runs along the Zumbro River and along the east side of Soldiers Field golf course. 1) Master Plan Consistency: The Downtown Master Plan was adopted by the City Council in January of 2011. The Master Plan identifies this area, known as the Main Street Mixed Use District, as a primary development location. The proposed 501 on 1st project fulfills many of the goals of the Downtown Master Plan such as incorporation of mixed uses, appropriate building height, mixed material facade design, and active streetscape elements. The reduction of parking in this project allows for ample landscaping of the site which will enhance and maintain neighborhood amenity and character. The proposed development is consistent with the Downtown Master Plan by incorporating pedestrian -oriented amenities like connectivity to neighboring developments and incorporation of a mix of uses like retail, restaurant, and residential within the building contributing to a more active downtown. Bump -outs at the end of each block provide additional space within the pedestrian zone between the building edge and curb. Abundant trees with space for tables and seating placed between them accommodate outdoor dining for the restaurant located on the corner of 5t" Street SW and 1st Avenue SW. The developer has also enhanced pedestrian amenity through the widening of sidewalks along 2nd Ave SW, inclusion of a 4 foot wide protected pedestrian sidewalk and lighting/windows through the alley span, inclusion of blade signage, the addition of a canopy over the 2nd Ave SW entrance, and use of sloped canvas awnings along the 5t" Street SW frontage. 3 Urban Village Design Guidelines: For information, the City Attorney has indicated that there is no legal basis to apply the Urban Village Design Guidelines as part of the zoning review criteria in determining whether the project should be approved. The Urban Village Design Guidelines were never formally adopted as part of the comprehensive plan by way of City Council resolution. The findings within this report maintain that the project complies with the Downtown Master Plan; and, WHEREAS, the Rochester Planning and Zoning Commission recommended approval subject to the following conditions- 1. The applicant must submit a photometric lighting plan which complies with the lighting standards within the Ordinance; 2. The applicant must submit additional details showing the function of off- street loading and trash removal and snow storage/removal from the site. This information should include a plan or diagram showing service vehicle circulation/frequency and location of snow storage (if any is proposed on the site). It is recommended that alley circulation and service vehicle deliveries are coordinated with the neighboring MMP building; 3. Prior to the issuance of a Building Permit, any signs proposed for public safety or directional purposes should be indicated on the Site Plan; 4. Any rooftop HVAC equipment shall be adequately screened from view; 5. Grading and Drainage Plan approval is required for this project; 6. The developer will be required to execute a City prepared Agreement to address the developer's obligations related to reconstruction of the alley as a bridge design approved by the City. Said Agreement will also address the developer's obligations related to construction/payment for improvements to 5th St SW and 2nd Ave SW, and streetscape improvements, and for relocation/abandonment of any existing utilities within the alley; 7. Execution of a Revocable Permit Agreement, or at City's discretion an Easement will be required for all proposed private improvements within the public road and alley right-of-way; 8. Execution of a City -Owner Contract is required prior to 4 construction/reconstruction of public infrastructure to serve this development. Any proposed public improvements lying within Owners private property will require dedication of public easements prior to construction; 9. Development charges/obligations applicable to the development of this property include: A. Sanitary Sewer Availability Charge (SAC) B. Water Availability Charge (WAC) C. Storm Water Management Plan Area Charge (SWMPAC) for any net increase in impervious surface D. Reconstruction of Pedestrian Facilities/Pedestrian Ramps E. Plant Investment Fee (PIF) collected for individual lots at the time of Building Permit issuance; 10. The applicant shall comply with Section 63.265, subd.8, related to Boulevard Tree Requirements as well as structural soil standards; 11. Park dedication will be required per City ordinance; 12. The developer shall submit evidence that a Final Plat has been recorded with Olmsted County Property Records for this development; 13. The Council's actions in approving this development occur in response to the applicant's or his/her representative's oral and written representations as to the appearance of the building design, exterior fagade, and landscaping. As such, the applicant must not deviate from the appearance of the building design, exterior fagade and landscaping as originally presented to the Council without the Council's prior approval; and, WHEREAS, the Common Council held a public hearing on the incentive development preliminary plan request on June 15, 2015, and gave all interested persons an opportunity to give testimony and make presentations; and, WHEREAS, the Applicant's representative appeared at the public hearing and testified that the Applicant agreed with all of the above recommended conditions of approval. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Rochester that it adopt the Planning and Zoning Commission's findings of fact and recommended conditions of approval, and that Incentive Development Final #R2015-015CUP Final Plan requested by 501 5 on 1st, LLC, to permit the construction of a five -story, 84-unit mixed use development with the first floor commercial and the upper floors residential on property located along the south side of Fifth S.W., and east of Second Avenue N.W., is granted subject to the 13 conditions of approval described above. 1.9 PASSED AND ADOPTED BY THE COMMON COUNCIL OF THE CITY OF ROCHESTER, MINNESOTA, THIS ATTEST: CITY CLERK DAY OF , 2015. PRESIDENT OF SAID COMMON COUNCIL APPROVED THIS DAY OF , 2015. MAYOR OF SAID CITY (Seal of the City of Rochester, Minnesota) Zone15\Incendev.15-015.final 7